090204E-04.pdf
PDF 104 KB Posted
- Solicitation number
- FA813726R0001
About this file
This is an electrical construction drawing (sheet E04) for a repair project at Tinker Air Force Base, Oklahoma. The document details the relocation of a power pole and associated electrical infrastructure for the Heavy Metal Basin Facility (IWTP B62528). The drawing includes keyed notes specifying actions such as relocating the existing power pole, extending underground raceway, connecting power from overhead wiring, and establishing a new pole location. The drawing is dated 21 Dec 09 and was created by the 72 ABW Civil Engineer Directorate, with design work completed by D. Cruz, Z. Henson, and M. Ale. The document is marked as an "As-Built" drawing, indicating it represents the final configuration of the electrical infrastructure after construction.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OF
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
T I N
K E
R
A
I R
F
O R
C E
B
A S
E
O
K L
A H
O M
A
P R
O J E
T
N
F O
R M
A T
I O
N
Q P r o j e c t D
E S
I G
N s
S u p p o r t
D r a w i n g s
D E
S I G
N
F
I L
E
L
O C
A T
I O
N
R E
V I S
I O
N S
M A
R K
D E
S I G
N
G
R O
U P
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
D E
S C
R I P
T I O
N
2 3 4
E
D
C
B
A
M A
N A
G E
M E
F O
R M
A T
I O
N
1 2
E
D
C
B
A
I S
S U
E
D
A T
E
SHEET
SHEET NUMBER
S H
E E
T
T
I T
L E
D M
A G
D
C
R U
Z
M
A
L E
Z
H
E N
S O
N
D
W W
Y K
A
R E
P A
R
H
A
V Y
M
T
A L
B
A S
I N
F A
C I L I T
Y
I W
P
B
E04
E L
E C
T R
I C
A L
C O
N S
T R
U C
T I O
N
KEYED NOTES
A RELOCATE EXISTING POWER POLE AND
OVERHEAD AS NEEDED FOR NEW POLE
LOCATION.
B EXTEND UNDERGROUND RACEWAY TO
POWER POLE IDENTIFIED IN KEYED NOTE D.
C CONNECT POWER FROM OVERHEAD WIRING
TO RELOCATED POLE.
D NEW POLE LOCATION.
AS-BUILTS
C
B
A
D
File details come from the government source that posted it. Updated .