This document is a Civil Demolition drawing (Sheet C02) for a project at Tinker Air Force Base, Oklahoma, specifically for repairing a Heavy Metal Basin Facility (Facility B62528). The demolition plan includes removing steel siding, structural members, and insulation to install a new overhead door. Key demolition tasks involve power washing surfaces to remove sodium hydroxide (NaOH) stains, demolishing and removing two NaOH holding tanks, cleaning the NaOH containment area for new coating, and removing two pump containment supports. The drawing is dated 21 December 2009, created by the Air Force Materiel Command's 72 ABW Civil Engineer Directorate, with design files located at Q:\Project\DESIGN\2000s\2009\20090204\0_Support\0_3_Drawings.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OF
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
T I N
K E
R
A
I R
F
O R
C E
B
A S
E
O
K L
A H
O M
A
P R
O J E
T
N
F O
R M
A T
I O
N
Q P r o j e c t D
E S
I G
N s
S u p p o r t
D r a w i n g s
D E
S I G
N
F
I L
E
L
O C
A T
I O
N
R E
V I S
I O
N S
M A
R K
D E
S I G
N
G
R O
U P
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
D E
S C
R I P
T I O
N
2 3 4
E
D
C
B
A
M A
N A
G E
M E
F O
R M
A T
I O
N
1 2
E
D
C
B
A
I S
S U
E
D
A T
E
SHEET
SHEET NUMBER
S H
E E
T
T
I T
L E
D M
A G
D
C
R U
Z
M
A
L E
Z
H
E N
S O
N
D
W W
Y K
A
R E
P A
R
H
A
V Y
M
T
A L
B
A S
I N
F A
C I L I T
Y
I W
P
B
C02
C I V
I L
D E
M O
L I T
I O
N
N
KEYED NOTES
A REMOVE STEEL SIDING, STRUCTURAL
MEMBERS AND INSULATION AS REQUIRED
TO MAKE WAY FOR INSTALLATION OF NEW
OVERHEAD DOOR.
B POWER WASH FLOOR, WALLS, AND OTHER
SURFACES IN THE VICINITY OF THE
EXISTING NAOH PUMPS TO REMOVE THE
RESIDUAL NAOH STAINS.
C DEMOLISH AND REMOVE FROM SITE, THE
TWO NAOH HOLDING TANKS.
D CLEAN SURFACE INSIDE NAOH
CONTAINMENT AREA AND PREPARE FOR
NEW COATING APPLICATION.
E DEMOLISH AND REMOVE FROM SITE, TWO
PUMP CONTAINMENT SUPPORTS.
ONE
REMOVED
TWO TANKS REMOVED
FOR REPLACEMENT
AS-BUILTS
E B
C C
A
D
File details come from the government source that posted it. Updated .