090204E-03.pdf
PDF 23 KB Posted
- Solicitation number
- FA813726R0001
About this file
This is an electrical construction drawing (Sheet E03) for a repair project at the Tinker Air Force Base in Oklahoma, specifically for the Heavy Metal Basin Facility (IWTP B62528). The drawing provides detailed electrical specifications for reinstalling pump controls, routing new conduit and wiring, and installing electrical equipment. Key electrical modifications include installing new PVC conduit and wire from existing circuits, reinstalling pump controls and sensing devices, installing a 480-volt breaker in panel HCF, and mounting a new disconnect switch near a water heater. The drawing is dated 21 December 2009 and is part of an as-built documentation set for the electrical construction work, with specific routing instructions for conduit along walls and above overhead doors, emphasizing corrosion-resistant materials and precise placement of electrical components.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OF
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
T I N
K E
R
A
I R
F
O R
C E
B
A S
E
O
K L
A H
O M
A
P R
O J E
T
N
F O
R M
A T
I O
N
Q P r o j e c t D
E S
I G
N s
S u p p o r t
D r a w i n g s
D E
S I G
N
F
I L
E
L
O C
A T
I O
N
R E
V I S
I O
N S
M A
R K
D E
S I G
N
G
R O
U P
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
D E
S C
R I P
T I O
N
2 3 4
E
D
C
B
A
M A
N A
G E
M E
F O
R M
A T
I O
N
1 2
E
D
C
B
A
I S
S U
E
D
A T
E
SHEET
SHEET NUMBER
S H
E E
T
T
I T
L E
D M
A G
D
C
R U
Z
M
A
L E
Z
H
E N
S O
N
D
W W
Y K
A
R E
P A
R
H
A
V Y
M
T
A L
B
A S
I N
F A
C I L I T
Y
I W
P
B
E03
E L
E C
T R
I C
A L
C O
N S
T R
U C
T I O
N
N
KEYED NOTES
A INSTALL NEW CONDUIT AND WIRE FROM
CIRCUIT THAT FED DEMOLISHED
RECEPTACLES. ROUTE CONDUIT ALONG
EXISTING RACK AT APPROXIMATELY 8' AFF.
USE PVC CONDUIT, FITTINGS AND BOXES
FOR CORROSION RESISTANCE. PLACE
NEW RECEPTACLE BOXES AT RELOCATED
PUMPS.
B REINSTALL PUMP CONTROLS, WIRING,
SENSING DEVICES, SWITCHES ETC. TO
MATCH EXISTING OPERATION.
C SEE SUPPLEMENTAL DRAWING FOR
ELECTRICAL SITE WORK.
D INSTALL 480 VOLT BREAKER IN SPARE
LOCATION 10, 11, 12 IN PANEL HCF, SIZED TO
MATCH REQUIREMENTS FOR NEW WATER
HEATER.
E INSTALL
"PVC CONDUIT RACEWAY AND
WIRE ALONG SOUTH WALL FROM PANEL
HCF TO NEW WATER HEATER DISCONNECT.
ROUTE ABOVE NEW OVERHEAD DOOR.
WIRE SIZE TO MATCH REQUIREMENTS FOR
NEW WATER HEATER.
F MOUNT NEW DISCONNECT NEAR WATER
HEATER AND CONNECT SERVICE TO WATER
HEATER.
AS-BUILTS
A
C
B
A
A A
B
D
E E
F
Panel - LCF#2
Panel - HCF
LCF #2-3
LCF #2-1
Pump
LCF #2-9
Compressor
LCF #2-5
Disconnect
Switch
HCF 7,8,9
File details come from the government source that posted it. Updated .