REV_Inspection_Report_Erlanger,_KY_2024R032_Tank_3_-_MLMDSS.pdf
PDF 11 MB Posted
- Attached to
- Tank Inspections & Repairs & On-Call Services
- Solicitation number
- 26-031-ITB
- Issued by
- Bell County, Kentucky
About this file
This is a Level 2 Tank Inspection Report prepared by CROM, LLC for the Kenton County Airport Board (KCAB) regarding the 2.0 million-gallon Spent Deicing Fluid Storage Tank No. 3 located in Erlanger, Kentucky. The inspection was conducted on July 1, 2024, and electronically signed and sealed on September 30, 2024, by Michael L. Miller, PE (Kentucky License No. 29604). The inspection evaluated the structural integrity and condition of the tank in accordance with AWWA D110 and ACI 350 standards. The scope of work included comprehensive visual inspection of the tank interior and exterior, including the dome, floor, and accessories, with selective destructive testing consisting of five interior core wall coupons, two exterior wall coupons, and four dome cores taken for engineering analysis. The tank, originally constructed in October 2001, was drained and cleaned prior to inspection, and all areas were documented with photographs. CROM recommends the next Level 2 Inspection be conducted by June 28, 2029.
The inspection identified multiple deficiencies requiring remedial action across various tank components. Areas rated as "Poor" condition requiring immediate action include: the tank dome (exhibiting interior surface deterioration related to acid attack and possible microbiologically influenced corrosion with compressive strength averaging 7,823 psi), emergency overflow openings (with cracks in precast housing), the exterior ladder (lacking OSHA-compliant safety system), the interior ladder (lacking OSHA-compliant safety system), and interior tank walls (containing cracks and hollows with corroded steel shell diaphragm and failed coating systems). Additional "Fair" condition items requiring remedial action before the next five-year inspection include the exterior wall (hollow areas and shrinkage cracks requiring cleaning, sealing, and patching), dome access hatch (requiring surface preparation, lift lug replacement with stainless steel, and installation of a dome safety rail system with self-closing gate), dome probe (cracks requiring cleaning and sealing), and interior piping (requiring surface preparation, coating application, and replacement of missing hardware with 316 stainless steel). The report indicates this inspection was conducted in support of the Kenton County Airport Board's Tank Inspections & Repairs & On-Call Services contract opportunity, with bids due May 21, 2026, at 2:00 pm.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEVEL 2
TANK INSPECTION REPORT
CVG AIRPORT/PRIME ENGINEERING
CINCINNATI/NORTHERN KENTUCKY AIRPORT
2,000,000-GALLON SPENT DEICING FLUID SYSTEM TANK NO. 3
ERLANGER, KENTUCKY
CCR Job No. 2024R032 CROM Job No. 2001M042
Inspection Performed on July 1, 2024
1. Level 2 Inspection Report Sheets 1 - 14
This item has been electronically signed and sealed by Mike Miller, PE on September 30, 2024 using a
Digital Signature. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
Michael L. Miller, P.E.
Senior Engineer IV
Kentucky License Number: 29604
CROM, LLC
250 SW 36th Terrace Gainesville, Florida 32607
2024R032, 2.0MG Spent Deicing Fluid System Tank 3, CVG Airport July 1, 2024 Level 2 Inspection Report 2 Erlanger, Kentucky
TANK NO. 3 INSPECTION REPORT
1.0 Introduction
CROM, LLC (“CROM”), conducted an inspection of the 2.0 MG Spent Deicing Fluid Storage Tank No. 3 in Erlanger, Kentucky on July 1, 2024. The purpose of the inspection was to evaluate the condition of the tank and its structural integrity. The goal was to determine what measures, if any, would be necessary to extend the useful life of the tank and modernize the safety appurtenances. This report fulfills the inspection requirement in accordance with AWWA D110 and ACI 350.
Chris Barton, Project Manager, performed the inspection and prepared this report under the review of Michael L. Miller, PE.
The Level Two inspection performed by CROM consisted of a comprehensive visual inspection of the tank interior and exterior, including accessories, to evaluate their structural integrity in accordance with all applicable codes and standards and to meet the requirements of AWWA D110 and ACI 350.
2.0 Scope of Work
The investigation included the interior walls of the tank, the dome, floor, and tank accessories. The inspection was a visual survey of the structure with five selective demolition coupons on the interior core wall, two coupons on the exterior wall, and 4 dome cores taken for further engineering analysis.
The tank was inspected in accordance with AWWA D110 and ACI 350 to evaluate the present condition of the tank structure.
The inspection was performed on the following tank:
2.0 MG Spent Deicing Fluid Storage Tank No. 3
115-0” ID x 26-9” SWD (CROM Job. No. 2001-M-042 Completed October 2001)
The tank was drained and cleaned by a CVG subcontractor prior to the interior inspection or CROM personnel entering the tank. CROM used an ambient air monitor to test the quality of air within the tank prior to entry.
The inspector was provided access to the dome roof. The concrete dome was inspected for any deterioration, cracking, efflorescence, spalled concrete, signs of corrosion, or other indicators of existing problems. Tank accessories were examined to determine the extent of the weathering of the material and the condition of the bolts, fasteners, and the screens. All penetrations were checked for signs of leakage into the tank.
The interior wall was observed, where possible due to an existing CIM coating system installed by others, for any deterioration, cracking, efflorescence, spalled concrete, signs of corrosion or other indicators of existing problems. Piping and internal accessories were checked for corrosion along with the condition of their supports, bolts, and anchors.
The entire tank structure was visually evaluated, in areas that are accessible and not coated with CIM, and a record was made of all observations. Photographs were taken as an additional record of the inspection.
Level 2 Inspection Report 3
3.0 Conclusions and Recommendations
The inspection of the prestressed composite tank did not reveal any apparent problems that would cause concern for the structural integrity of the tank itself. However, there are items that should be addressed in order to minimize the potential of future problems. Please refer to those items categorized as “Fair” or “Poor” below.
The report utilizes subjective terminology to rate the condition of various elements of the structure:
• Excellent - indicates like new condition, no remedial action required.
• Good - indicates minor defects, still operable.
• Fair - indicates an element or accessory requiring remedial action before the next scheduled 5-year inspection.
• Poor - indicates immediate action required.
Tank ID Plate
Photo
Foundation
Condition Rating Unknown
Assessment Unable to visually inspect the foundation due to existing backfill.
Recommendation No apparent remedial action required at this time.
Photos
Level 2 Inspection Report 4
Wall Manhole
Condition Rating Good
Assessment No defects noted on wall manhole.
Recommendation No remedial action required at this time.
Exterior Wall
Condition Rating Fair
Assessment Hollow (red circle), shrinkage cracks (red arrow), and corrosion on bottom of dome band noted on exterior wall. CROM performed a destructive investigation of the exterior wall while onsite where cracks were noted. The destructive investigation was performed to determine the integrity of the exterior wall. The destructive investigation was performed in accordance with standards specified in AWWA D110-13, Section
6.4.7. Shrinkage cracks noted on exterior wall with no sign of corrosion, thru-cracks only due to shrinkage/curing. Exterior wall found to be in fair condition.
Recommendation • Clean and seal cracks to prevent further water infiltration.
• Remove the hollow in the wall and dome band area and patch back with an appropriate coating system according to manufacturer's recommendation.
Level 2 Inspection Report 5
Dome Access Hatch
Assessment The tank is not equipped with a self-closing gate at the exterior ladder dome landing or a safety handrail system at the unprotected edges on the dome. Loss of protective coating system, bio-growth, and corrosion at lift lugs noted on access hatch cover.
Level 2 Inspection Report 6
Recommendation • Prepare the surface to remove bio-growth and corrosion stains and recoat the hatch cover with gelcoat.
• Replace the corroded lift lugs with stainless steel equivalent.
• Install a localized dome safety rail system equipped with a self-closing gate, around the dome access hatch to comply with OSHA standards.
Dome Probe
Assessment Cracks noted on dome probe curb. No other defects noted on dome probe.
Recommendation Clean and seal cracks to stop further infiltration of water.
Level 2 Inspection Report 7
Exterior Tank Dome Coating System
Assessment Exterior tank dome coating system found to be in good condition. Minor shrinkage cracking was observed.
Recommendation Clean and seal cracks to prevent further water infiltration.
Tank Dome
Condition Rating Poor
Assessment Due to known deterioration on the interior of the dome, four dome cores were taken about 10 feet above each emergency overflow for further engineering analysis. The core holes were cleaned and formed during a destructive investigation of the exterior dome while CROM was onsite where cracks were noted. The destructive investigation was performed to determine the integrity of the exterior tank dome. The destructive investigation was performed in accordance with standards specified in
AWWA D110-13, Section 6.4.7. Shrinkage cracks noted on exterior tank dome with no sign of corrosion, thru-cracks only due to shrinkage/curing.. Dome core results show pH average 6.33 and the average compressive strength result was 7,823 psi.
Interior Surface Deterioration (see attached comprehensive report):
The cement paste in the near-surface concrete is very absorptive and weak, with little inherent strength. The poor-quality cement paste contains gypsum deposits at depths ranging from 0.5 to 1.5 mm. The surface deterioration is related to acid attack, although exposure to glycol solutions is not directly deleterious. However, propylene glycol can degrade in the presence of oxygen, forming acids like glycolic, formic, acetic, and oxalic acid.
The petrographic examination displayed symptoms of possible sulfuric acid attack and Microbiologically Influenced Corrosion (MIC). However, the chemical analysis of the cores did not confirm sulfuric acid as the cause of the deterioration. It did confirm that an acid attack is occurring, but the exact type of acid remains unknown.
In Core #3 and the tank's near-surface concrete, gypsum deposits suggest a connection to sulfuric acid, potentially due to MIC. The leaching of calcium and sulfate during the acid attack formed gypsum, which can further lead to sulfate attack. While
Level 2 Inspection Report 8 bacterial growth likely contributed to sulfuric acid formation, the exact type of acid causing the distress remains undetermined.
Recommendation Crom recommends removing the low pH surface of concrete and installation of an appropriate interior coating system on the interior of the dome, according to the manufacturer’s recommendation.
Emergency Overflow Openings
Assessment Cracks noted on precast overflow housing. No other defects noted on emergency overflow openings.
Recommendation Clean and seal cracks to prevent further water infiltration.
Level 2 Inspection Report 9
Lightning Protection Equipment
Assessment No defects noted on lightning protection system.
Exterior Ladder
Assessment Absent exterior ladder safety system noted.
Recommendation Install new aluminum ladder system equipped with an OSHA-compliant ladder safety system.
Level 2 Inspection Report 10
Interior Ladder
Assessment Absent interior ladder safety system noted.
Recommendation Install new stainless steel ladder system equipped with an OSHA-compliant ladder safety system. Coat stainless steel ladder with the same coating system that was used on the wall manhole on the interior of the tank.
Tank Floor
Assessment Floor coated by others appeared to be installed over exposed aggregate, which suggests that concrete loss and possible section loss had occurred before coating installation. Previously repaired areas to CIM noted on tank floor. No other defects noted on tank floor.
Recommendation No remedial action required at this time, monitor condition at next scheduled inspection.
Level 2 Inspection Report 11
Floor Wall Connection
Assessment Floor wall connection coated with CIM noted.
Interior Tank Walls
Assessment Cracks and hollows noted throughout interior tank wall. CROM performed a destructive investigation of the interior wall while onsite of five coupons where cracks and hollows were noted. The destructive investigation was performed to determine the integrity of the diaphragm. The destructive investigation of the interior corewall showed minimal cover (¼” to ½”) over the steel shell diaphragm and the cracks went through the inside core wall and corroded steel shell diaphragm into the outside core wall. Remaining shotcrete appeared to be deteriorated and flaking off the corroded steel shell diaphragm under the failed coating system. Coating system appeared to be installed over exposed aggregate on the surface of the inside corewall, suggesting that the paste and section loss occurred prior to the surface preparation and coating installation. Areas were cleaned, prepared, and patched back according to
Level 2 Inspection Report 12 manufacturer’s recommendation. The destructive investigation was performed in accordance with standards specified in AWWA D110-13, Section 6.4.7.
Recommendation Remove failed interior coating system. Reinspect walls and floor/wall joint. Repair cracks. Prepare surface and install an appropriate interior coating system.
Level 2 Inspection Report 13
Interior Piping
Assessment Pipe coated by others with CIM coating system. Corrosion was noted coming from inside interior piping and three missing bolts were noted on pipe flange.
Recommendation • Prepare the surface of the interior pipes and apply an appropriate coating system.
• Replace missing hardware with 316 stainless steel hardware.
Level 2 Inspection Report 14
Interior Tank Dome
Assessment Noted loss of concrete, spalls, and corrosion with exposed reinforcement and bolster feet noted on interior tank dome.
Recommendation • Prepare the surface of interior dome removing coating system and cleaning any corroded exposed reinforcement.
• Repair interior tank dome by squaring off and chipping back the concrete to provide a minimum depth of ¼”.
• Apply a rust-inhibiting coating system to structural steel according to the manufacturer’s recommendation.
• Patch back with an appropriate cementitious surface repair system according to the manufacturer’s recommendation.
• Apply an appropriate coating system according to the manufacturer’s recommendation.
Level 2 Inspection Report 15
Next Inspection: CROM recommends a Level 2 Inspection by June 28, 2029, in accordance with AWWA and ACI 350.
The inspection performed by CROM was a visual survey of the structure interior and exterior with minor selective destructive tests. Therefore, CROM cannot offer an opinion on the condition or performance of the covered or hidden elements of the structure not visible from the surface.
The preceding report is submitted for your review and discussion. We would be pleased to discuss the results with you. If you have any questions or concerns, please do not hesitate to contact us.
Chris Barton
Project Manager
| 2024-09-30T16:03:40-0400 | |
| Michael L Miller |