This is an Interior Inspection Report for the Kenton County Airport Board's South Glycol Pump Station II West 125 tank located in Hebron, Kentucky. The inspection was conducted on August 7, 2023, by Gregory Charles Hardig Sr., a NACE Certified Coating Inspector Level-3, and commissioned by Scott Thacker, Sr. Manager Environmental Operations at Cincinnati/Northern Kentucky International Airport (CVG). The inspection identified two repairs within the West 125 tank: a 2-inch repair at a precast joint on the south side east end, and a 12-inch repair at the third seam from the east end on the north side. Both repairs were completed using industry-standard preparation methods including braided wire wheel preparation, denatured alcohol cleaning, CIM surface conditioner application, and trowel-grade CIM application. The tank was deemed safe for entry using a 5-gas air monitor and was ready to return to service upon completion of repairs.

The report documents work performed under what appears to be preparation for or execution of the Kenton County Airport Board's broader "Tank Inspections & Repairs & On-Call Services" contract opportunity, with questions due May 11, 2026, and bids required by May 21, 2026, at 2:00 pm. The inspection was conducted by Corrosion Protection Resources LLC, with the inspector's certification expiring in April 2025. The report includes photographic documentation of the inspection and repair work, though specific pricing information, contract terms, and financial details are not contained within this inspection document itself.

View the file

Other files

File Type Posted
Tank_Inspections_&_Repairs_&_On-Call_Services_(Addendum_#2_Revision).pdf PDF
KCAB_Policy_#5102_Confined_Space_Entry_Plan.pdf PDF
Tank_Inspections_&_Repairs_&_On-Call_Services.pdf PDF
26-031-ITB_Tank_Inspection_&_Repair_Svcs_-_Ad.pdf PDF
26-031-ITB_Tank_Inspection_&_Repair_Services_-_Sample_Agreement_-_Attachment_C.pdf PDF
2_Mil_Sludge_Holding_Tank_-_B3.pdf PDF
2_Mil_Digester_#1_&_#2_-_Attachment_B2.pdf PDF
S_Glycol_Pump_Station_II_East_&_West_Inspection_Reports_-_Attachment_B1.pdf PDF
Petrograpic_Exam_CRT_Report_P-2020_Rev_w_Chem_Analysis_-_Attachment_A4.pdf PDF
3_Mil_Gallon_Tank_Inspection_Reports_-_South_Tank_2_-_Attachment_A3.pdf PDF
3_Mil_Gallon_Tank_Inspection_Reports_-_North_Tank_1_-_Attachment_A2.pdf PDF
2_Mil_Gallon_Tank_Inspections_Reports_-_Attachment_A1.pdf PDF
3_MIl.pdf PDF
2_Mil.pdf PDF
Kenton_County_Airport_Board_South_Glycol_Pump_Station_II_East_-125_&_West-125_Interior_Inspection_Report_8-2-2023_(1).docx DOCX document
REV_Inspection_Report_Erlanger,_KY_2024R032_Tank_3_-_MLMDSS.pdf PDF
SludgeHT.pdf PDF
Dig_2.pdf PDF
REV_Inspection_Report_Erlanger,_KY_2024R032_Tank_2_-_MLMDSS.pdf PDF
DIG1.pdf PDF
REV_Inspection_Report_Erlanger,_KY_2024R032_Tank_1_-_MLMDDSS.pdf PDF
Petrograpic_Exam_CRT_Report_P-2020_Revision_with_Chem_Analysis.pdf PDF
2018_Structural_Integrity_150k_Glycol_Holding_Tanks.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cincinnati / Northern Kentucky International Airport (CVG) Kenton County Airport Board South Glycol pump Station 2 West 125 tank Hebron KY 41048 Interior Inspection Report

August 7, 2023

Report commissioned by:

Scott Thacker, Sr. Manager Environmental Operations Cincinnati / Northern Kentucky International Airport (CVG) Kenton County Airport Board P.O. Box 752000 Cincinnati, OH 45275 Sthacker@cvgairport.com

Prepared by:

Gregory Charles Hardig Sr.

NACE CIP Level-3 Cert # 3494

General:

The plan for the day is to inspect the General condition of the South Glycol Pump Station II West 125 tank Interior repairs.

With JSA and a meaningful discussion on safety complete, we are using a 5x gas air monitor to find the tank safe for entry.

In the west tank there were two repairs identified. The First was about 2” long where the boot bridges the two precast joints on the south side east end joint.

The joint was prepared using a braided wire wheel, then wiped clean with denatured alcohol. Then the CIM surface conditioner was applied. The trowel grade CIM was mixed and applied.

The second spot is located at the third seam from the east end on the north side and is about 12” long.

Repair Completed

Summary:

The West 125 tank two spots were repaired and ready to return to service.

Please feel free to reach out with any questions.

Respectfully submitted.

Gregory Charles Hardig Sr.

NACE Certified Coating Inspector Level-3 Cert #3494 My commission expires April 2025

Note: This report was assembled using the best means available in the current conditions. While we have applied our best experience and academic research to our conclusions, field conditions and recommendations are subject to change and the engineer/inspector assumes no liability for its use or outcome as contained in this report.

Corrosion Protection Resources LLC. All rights reserved www.cprcoatings.com