This is a Level 2 Tank Inspection Report prepared by CROM, LLC for the Kenton County Airport Board (KCAB) regarding a 3.0-million-gallon spent deicing fluid storage tank located in Erlanger, Kentucky. The inspection was performed on June 20, 2024, on Tank No. 1 at Cincinnati/Northern Kentucky Airport (CVG Airport) and evaluated the structural integrity and condition of the concrete prestressed composite tank constructed in August 2000. The comprehensive visual inspection included the tank interior and exterior, dome, floor, tank accessories, and internal piping, with three selective demolition coupons taken from the interior core wall and four dome cores extracted for engineering analysis in accordance with AWWA D110 and ACI 350 standards. The report identifies multiple deficiencies requiring remedial action before the next scheduled five-year inspection due by June 20, 2029.
The inspection revealed several items rated as "Poor" requiring immediate action, including structural concerns at the dome access hatch with defective hardware and concrete paste loss, deterioration of the interior tank dome surface due to acid attack and microbiologically influenced corrosion, cracks at emergency overflow openings and dome ventilators with hardcovers that create vacuum load risks, and an interior ladder system that is non-compliant with OSHA standards. Additional items rated as "Fair" include cracked dome probe curbs and interior tank dome spalls with exposed reinforcement requiring repair. A critical concern identified is a known clog in the underdrain system around the tank circumference that may cause potential uplift, which CROM notes requires immediate attention. The report recommends removal and reinstallation of the interior coating system following correction of the underdrain system, repair of concrete deterioration on the interior dome surface, replacement of defective hardware with 316 stainless steel materials, installation of an OSHA-compliant ladder safety system, and replacement of hardcover ventilator screens with 24/24 polyester mesh screens to prevent vacuum loading.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEVEL 2
TANK INSPECTION REPORT
CVG AIRPORT/PRIME ENGINEERING
CINCINNATI/NORTHERN KENTUCKY AIRPORT
3,000,000-GALLON SPENT DEICING FLUID STORAGE TANK NO. 1
ERLANGER, KENTUCKY
CCR Job No. 2024R032 CROM Job No. 2000M044
Inspection Performed on June 20, 2024
1. Level 2 Inspection Report Sheets 1 - 15
This item has been electronically signed and sealed by Mike Miller, PE on September 30, 2024 using a
Digital Signature. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
Michael L. Miller, P.E.
Senior Engineer IV
Kentucky License Number: 29604
CROM, LLC
250 SW 36th Terrace Gainesville, Florida 32607
2024R032, 3.0MG Spent Deicing Fluid Tank No. 1, CVG Airport June 20, 2024 Level 2 Inspection Report 2 Erlanger, Kentucky
TANK NO. 1 INSPECTION REPORT
1.0 Introduction
CROM, LLC (“CROM”), conducted an inspection of the 3.0 MG Spent Deicing Fluid Storage Tank No. 1 in Erlanger, Kentucky on June 20, 2024. The purpose of the inspection was to evaluate the condition of the tank and its structural integrity. The goal was to determine what measures, if any, would be necessary to extend the useful life of the tank and modernize the safety appurtenances. This report fulfills the inspection requirement in accordance with AWWA D110 and ACI 350.
Chris Barton, Senior Project Manager, performed the inspection and prepared this report under the review of Michael L. Miller, PE.
The Level Two inspection performed by CROM consisted of a comprehensive visual inspection of the tank interior and exterior, including accessories, to evaluate their structural integrity in accordance with all applicable codes and standards and to meet the requirements of AWWA D110 and ACI 350.
2.0 Scope of Work
The investigation included the interior walls of the tank, the dome, floor, and tank accessories. The inspection was a visual survey of the structure with three selective demolition coupons on the interior core wall and 4 dome cores taken for further engineering analysis.
The tank was inspected in accordance with AWWA D110 and ACI 350 to evaluate the present condition of the tank structure.
The inspection was performed on the following tank:
3.0 MG Spent Deicing Fluid Storage Tank No. 1
140’-0” ID x 26’-1” SWD (CROM Job. No. 2000-M-044 Completed August 2000) Odor Control System – Completed 2011 (By Others)
The tank was drained and cleaned by a CVG subcontractor prior to the interior inspection or CROM personnel entering the tank. CROM used an ambient air monitor to test the quality of air within the tank prior to entry.
The inspector was provided access to the dome roof. The concrete dome was inspected for any deterioration, cracking, efflorescence, spalled concrete, signs of corrosion, or other indicators of existing problems. Tank accessories were examined to determine the extent of the weathering of the material and the condition of the bolts, fasteners, and the screens. All penetrations were checked for signs of leakage into the tank.
The interior wall was observed, where possible due to an existing CIM coating system installed by others, for any deterioration, cracking, efflorescence, spalled concrete, signs of corrosion or other indicators of existing problems. Piping and internal accessories were checked for corrosion along with the condition of their supports, bolts, and anchors.
The entire tank structure was visually evaluated, in areas that are accessible and not coated with CIM, and a record was made of all observations. Photographs were taken as an additional record of the inspection.
Level 2 Inspection Report 3
3.0 Conclusions and Recommendations
The inspection of the prestressed composite tank did not reveal any apparent problems that would cause concern for the structural integrity of the tank itself. However, there are items that should be addressed in order to minimize the potential of future problems. Please refer to those items categorized as “Fair” or “Poor” below.
The report utilizes subjective terminology to rate the condition of various elements of the structure:
• Excellent - indicates like new condition, no remedial action required.
• Good - indicates minor defects, still operable.
• Fair - indicates an element or accessory requiring remedial action before the next scheduled 5-year inspection.
• Poor - indicates immediate action required.
Tank ID Plate
Photo
Foundation
Condition Rating Unknown
Assessment Unable to visually inspect the foundation due to existing backfill. There is a known clog in the underdrain system around the circumference of the tank which will be explored by others at a later date.
Recommendation No apparent remedial action required at this time. Crom has voiced concerns regarding potential uplift on the structure resulting from the failure of the underdrain system. This needs to be addressed immediately.
Level 2 Inspection Report 4
Photos
Wall Manhole
Condition Rating Good
Assessment Exterior is unavailable for inspection. Interior coated with CIM coating installed by others. No visible defects noted on wall manhole.
Recommendation No remedial action required at this time.
Exterior Wall
Assessment Unable to visually inspect the exterior wall due to backfill.
Recommendation No apparent remedial action required at this time.
Level 2 Inspection Report 5
Dome Access Hatch
Condition Rating Poor
Assessment Paste loss in concrete around access hatch curb. The hatch cover anchor bolts were coated over with epoxy by others causing them to not be able to be unthreaded.
Seven of the anchor bolts needed to be cut off to remove hatch cover to lower access equipment into the tank. The U-bolt attachment at hatch cover noted to be bent and defective. Bio-growth noted on access hatch cover and curb.
Recommendation • Repair concrete paste loss observed around concrete curb.
• Repair or replace defective hardware with 316 stainless steel hardware.
Level 2 Inspection Report 6
Dome Probe
Condition Rating Fair
Assessment Cracks noted on dome probe curb. No other defects noted on dome probe.
Recommendation Clean and seal cracks to stop further infiltration of water.
Exterior Tank Dome Coating System
Assessment Faded and weathered coating system and shrinkage cracks noted on exterior tank dome with no sign of corrosion, thru-cracks only due to shrinkage/curing. Exterior tank dome found to be in good condition. Minor shrinkage cracks, approximately 200 linear feet and mostly around 7 mils wide, noted on exterior tank dome with no sign of corrosion.
Recommendation Clean and seal cracks to prevent further water infiltration.
Level 2 Inspection Report 7
Tank Dome
Assessment CROM performed a destructive investigation of the exterior dome while onsite where cracks were noted. The destructive investigation was performed to determine the integrity of the exterior tank dome. The destructive investigation was performed in accordance with standards specified in AWWA D110-13, Section 6.4.7. Due to known deterioration on the interior of the dome, four dome cores were taken about 10 feet above each emergency overflow for further engineering analysis. The core holes were cleaned, formed, and patched back with an appropriate coating system according to manufacturer's recommendation. Dome core results show pH average 6 and the average compressive strength result was 8,096 psi.
Interior Surface Deterioration (see attached comprehensive report):
The cement paste in the near-surface concrete is very absorptive and weak, with little inherent strength. The poor-quality cement paste contains gypsum deposits at depths ranging from 0.5 to 1.0 mm. The surface deterioration is related to acid attack, although exposure to glycol solutions is not directly deleterious. However, propylene glycol can degrade in the presence of oxygen, forming acids like glycolic, formic, acetic, and oxalic acid.
The petrographic examination displayed symptoms of possible sulfuric acid attack and Microbiologically Influenced Corrosion (MIC). However, the chemical analysis of the cores did not confirm sulfuric acid as the cause of the deterioration. It did confirm that an acid attack is occurring, but the exact type of acid remains unknown.
In Core #1 and the tank's near-surface concrete, gypsum deposits suggest a connection to sulfuric acid, potentially due to MIC. The leaching of calcium and sulfate during the acid attack formed gypsum, which can further lead to sulfate attack. While bacterial growth likely contributed to sulfuric acid formation, the exact type of acid causing the distress remains undetermined.
Recommendation • Crom recommends removing the low pH surface of concrete and installation of an appropriate interior coating system on the interior of the dome, according to the manufacturer’s recommendation.
Level 2 Inspection Report 8
Emergency Overflow Openings
Assessment Hardcovers with minimal openings were installed over the emergency overflow openings by the airport for the odor control system operation. Cracks noted on emergency overflow openings.
Recommendation
• Clean and seal cracks to prevent further water infiltration.
• Spot repair spalls and interior exposed rebar by squaring off and chipping back the concrete to provide a minimum depth of ¼" and patching back with a cementitious repair mortar.
Level 2 Inspection Report 9
Dome Ventilator
Assessment Dome ventilator screens noted to be replaced with hard covers when odor control system was installed by the airport. One of the hard covers must have blown off at some point leaving only one small opening for airflow.
Recommendation Remove all hardcovers so that the tank will not be subjected to a vacuum load during a rapid draw-down event. If odorous air is a concern, then an air scrubbing system should be installed. Replace hard covers with screens made of 24/24 polyester mesh on dome ventilator base.
Level 2 Inspection Report 10
Lightning Protection/Cathode Protection Equipment
Assessment No defects noted on lightning protection system.
Recommendation No remedial action required at this time.
Interior Ladder
Assessment Ladder safety system noted to be non-compliant with OSHA standards. Note: The ladder safety system is not OSHA compliant as the connection between the carrier or lifeline and the point of attachment to the body belt or harness exceeds 9 inches.
OSHA Standard requires ladders with structural or other defects be tagged “Dangerous: Do Not Use” or with similar language and removed from service until repaired or replaced. Left tube riser for interior ladder noted to be cracked and deteriorating. Cross bracing on wall standoffs were damaged and unfastened.
Recommendation • The interior ladder should be immediately taken out of service and properly tagged to comply with OSHA requirements until the deficiencies are corrected.
• Install new stainless steel ladder system equipped with an OSHA-compliant ladder safety system.
Level 2 Inspection Report 11
Tank Floor
Assessment Previously repaired areas to CIM, coated by others, noted on tank floor. No other visible defects noted on tank floor. CROM performed a destructive investigation of the interior floor while on site where blisters were noted. The destructive investigation was performed to determine the integrity of the floor. The destructive investigation of the interior floor showed the concrete in good condition with no visible cracks in the destructive openings (coupon 1.4 and 1.6). Areas were cleaned, prepared, and patched back according to manufacturer’s recommendation. The destructive investigation was performed in accordance with standards specified in AWWA D110- 13, Section 6.4.7.
Recommendation There were multiple signs of where the CIM coating was blistered. Crom investigated a few areas as noted above in the assessment. Crom did not notice any signs of water intrusion into the tank during our inspection nor did we see any indication that it happened previously. In order to have a 100% certainty that there are no floor cracks and water infiltration the coating needs to be removed, floor inspected, and the coating reinstalled following the installation of the tank's new underdrain system.
Level 2 Inspection Report 12
Floor Wall Connection
Assessment Floor wall connection coated with CIM. Blister filled with fluid noted in CIM at floor wall connection. CROM performed a destructive investigation of the floor wall connection above the Bearstop while onsite where blister, approximately 3” wide and 30” long, was noted. The destructive investigation was performed to determine the integrity of the floor wall connection and Bearstop. The destructive investigation of the floor wall connection showed the Bearstop painted over with no visible cant cove in the coupon opening. Blister was vacuumed out then carefully scraped paint off to expose the Bearstop. No signs of water infiltration in the coupon was found and unsure regarding how the water got into the blister (coupon 1.5). Areas were cleaned, prepared, and patched back according to manufacturer’s recommendation. The destructive investigation was performed in accordance with standards specified in AWWA D110-13, Section 6.4.7.
Recommendation Remove the coating system, inspect, and reinstall following the installation of the tank's new underdrain system.
Level 2 Inspection Report 13
Interior Tank Walls
Assessment Horizontal cracks, hollows, and a delaminated CIM coating system were noted on interior tank wall. CROM performed a destructive investigation of the interior wall while onsite where cracks were noted. The destructive investigation was performed to determine the integrity of the diaphragm. The destructive investigation of the interior corewall showed the diaphragm in good condition with only surface rust and one small crack in the inside corewall surface (coupon 1.3). Areas were cleaned, prepared, and patched back according to manufacturer’s recommendation. The destructive investigation was performed in accordance with standards specified in AWWA D110-13, Section 6.4.7.
Recommendation Following the installation of the tank’s new underdrain system, remove failed interior coating system. Reinspect walls and floor/wall joint. Repair cracks. Prepare surface and install an appropriate interior coating system.
Level 2 Inspection Report 14
Level 2 Inspection Report 15
Interior Piping
Assessment Pipe penetrations coated by others with CIM coating system. Corrosion noted coming from inside interior piping.
Recommendation Prepare the surface of the interior pipes and apply an appropriate coating system according to the manufacturer's recommendation.
Level 2 Inspection Report 16
Interior Tank Dome
Condition Rating Fair
Assessment Noted loss of concrete, spalls, and corrosion with exposed reinforcement and bolster feet noted on interior tank dome.
Recommendation • Prepare the surface of interior dome removing coating system and cleaning any corroded exposed reinforcement.
• Repair interior tank dome by squaring off and chipping back the concrete to provide a minimum depth of ¼”.
• Apply a rust-inhibiting coating system to structural steel according to the manufacturer’s recommendation.
• Patch back with an appropriate cementitious surface repair system according to the manufacturer’s recommendation.
• Apply an appropriate coating system according to the manufacturer’s recommendation.
Level 2 Inspection Report 17
Next Inspection: CROM recommends a Level 2 Inspection by June 20, 2029, in accordance with AWWA and ACI 350.
The inspection performed by CROM was a visual survey of the structure interior and exterior with minor selective destructive tests. Therefore, CROM cannot offer an opinion on the condition or performance of the covered or hidden elements of the structure not visible from the surface.
The preceding report is submitted for your review and discussion. We would be pleased to discuss the results with you. If you have any questions or concerns, please do not hesitate to contact us.
Chris Barton
Senior Project Manager III