U.S. Department of the Interior SPECIFICATIONS Bureau of Reclamation Technical Service Center Denver, Colorado MARCH 2014
Solicitation No. R14PS00485 Allen E. Inman Powerplant Unit 8 and Unit 9 Turbine Overhaul Pacific Northwest Region – Minidoka Project, Idaho
This solicitation issued by Regional Director
Pacific Northwest Region Bureau of Reclamation
1150 North Curtis Road, Suite 100 Boise ID 83706-1234
Phone inquiries regarding this solicitation should be made to Regional Acquisition Management Officer
Telephone Number: (208) 378-5364
Foreword - 1
ALLEN E. INMAN POWERPLANT
UNIT 8 AND UNIT 9 TURBINE OVERHAUL
Pacific Northwest Region – Minidoka Project
Idaho
FOREWORD
Product shall be delivered and installed at Inman Powerplant, approximately 20 miles northeast of Heyburn , Idaho, in Cassia County. Principal component of the work consists of refurbishing the horizontal turbine runners, bearing oil units, governor oil units, and new digital governors for Unit 8 and Unit 9.
PRE-OFFER SITE VISIT: A PRE- OFFER SITE VISIT INFORMATION IS
AVAILABLE IN SECTION L, CLAUSE 52.236-27. PROSPECTIVE OFFERORS
SHOULD MAKE ARRANGEMENTS BY CONTACTING JERRY CHEEK AT THE
TELEPHONE NUMBER OR EMAIL ADDRESS LISTED BELOW. ATTENDEES ARE
TO PROVIDE AND WEAR SAFETY BOOTS, HARD HATS, SAFETY VESTS.
Jerry Cheek (208) 678-0461 x20, jcheek@usbr.gov Reclamation considers this to be construction contract.
FOR DATE AND PLACE OF OFFER OPENING, SEE "SOLICITATION, OFFER, AND
AWARD," STANDARD FORM 1442.
FOR INFORMATION REGARDING BUREAU OF RECLAMATION'S PUBLICATION
"RECLAMATION SAFETY AND HEALTH STANDARDS" (2009 EDITION) WHICH IS
APPLICABLE TO WORK UNDER THIS CONTRACT, SEE CLAUSE AT "WBR
1452.223-81 SAFETY AND HEALTH."
END OF FOREWORD
mailto:jcheek@usbr.gov
Allen E. Inman Powerplant Unit 8 and Unit 9 Turbine Overhaul
Table of Contents i
TABLE OF CONTENTS
PART I
THE SCHEDULE
SECTION A SOLICITATION/CONTRACT FORM.......................................................... A-1
SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS .......................................B-1
SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK ............... C-1
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 14 10 Use of Site 01 31 19 Project Management and Coordination 01 31 30 Internet Based Project Management Work Flow System 01 33 00 Submittals 01 35 10 Material Safety Data Sheets 01 35 20 Safety and Health 01 35 21 Removal from Work 01 35 22 First Aid 01 35 30 Contractor’s Onsite Safety Personnel 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 51 00 Temporary Utilities 01 54 20 Use of Government Crane 01 55 00 Vehicular Access and Parking 01 56 10 Protection of Existing Installations 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 60 00 Product Requirements 01 74 10 Cleaning and Waste Management 01 78 30 Project Record Documents
DIVISION 09 - COATINGS
09 96 20 Coatings
DIVISION 26 – ELECTRICAL
26 05 20 Conductors and Cables 26 05 33 Electrical Conduit and Cable Tray
DIVISION 48 - ELECTRICAL POWER GENERATION
48 13 03 Pre-Teardown Readings and Measurements 48 13 04 Disassembly ii
48 13 07 Reassembly and Alignment 48 13 08 Commissioning 48 13 09 Critical Connection Fasteners 48 13 10 Kaplan Turbine Runner 48 13 11 Turbine Shaft 48 13 15 Mechanical Seals 48 13 16 Turbine Guide/Thrust Bearing 48 13 17 Generator Guide Bearings 48 13 20 Outer Gate Barrel 48 13 21 Inner Gate Barrel 48 13 24 Inner Barrel Extension 48 13 25 Wicket Gates 48 13 26 Wicket Gate Levers and Links 48 13 28 Bushings 48 13 29 Operating Ring 48 13 30 Wicket Gate Servomotor 48 13 31 Governor Oil Pumping Unit 48 13 32 Bearing Oil Pumping Unit 48 13 43 Brake Assembly 48 13 55 Digital-Electronic Governor
DIVISION 52 - DRAWINGS
52 00 00 Drawings
SECTION D PACKAGING AND MARKING ..................................................................... D-1
SECTION E INSPECTION AND ACCEPTANCE ..............................................................E-1 E.1. 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984) ............................ E-1 E.2. 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996) .......................... E-1
E.3. 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994) -
ALTERNATE I APR 1984) ................................................................................. E-3
SECTION F DELIVERIES OR PERFORMANCE ............................................................. F-1
F.1. 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION
OF WORK (APR 1984) ....................................................................................... F-1
F.2. 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEPT 2000) ........ F-1
F.3. 52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984) ................ F-2
F.4. 52.242-14 SUSPENSION OF WORK (APR 1984) ............................................ F-2
SECTION G CONTRACT ADMINISTRATION DATA .................................................... G-1
G.1. 1452.201-70 AUTHORITIES AND DELEGATIONS--DEPARTMENT
OF THE INTERIOR (MAY 2010) ..................................................................... G-1
G.2. ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS-
INVOICE PROCESSING PLATFORM (IPP) (APRIL 2013) ........................... G-2
iii
SECTION H SPECIAL CONTRACT REQUIREMENTS ................................................. H-1
H.1. KEY PERSONNEL REQUIREMENTS--BUREAU OF
RECLAMATION--PN REGION (FEB 1995) .................................................... H-1
H.2. AUTHORIZED WORKERS NOTICE TO POTENTIAL BUREAU OF
RECLAMATION CONTRACTORS (SEP 2002) .............................................. H-1
H.3. CONTRACTOR PERFORMANCE ASSESSMENT REPORTING
SYSTEM (JULY 2010) ...................................................................................... H-3
PART II
CONTRACT CLAUSES
SECTION I CONTRACT CLAUSES .................................................................................... I-1 I.1. 52.202-1 DEFINITIONS (NOV 2013) ................................................................. I-1 I.2. 52.203-3 GRATUITIES (APR 1984) ................................................................... I-1
I.3. 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014) ............ I-2
I.4. 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE
GOVERNMENT (SEPT 2006) ............................................................................. I-2 I.5. 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014) ............................... I-2
I.6. 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF
FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014) .................. I-4
I.7. 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR
IMPROPER ACTIVITY (MAY 2014) ................................................................. I-5
I.8. 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN
FEDERAL TRANSACTIONS (OCT 2010) ......................................................... I-6
I.9. 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND
CONDUCT (APR 2010) ..................................................................................... I-10 I.10. 52.203-14 DISPLAY OF HOTLINE POSTER(S) (DEC 2007) ......................... I-14
I.11. 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS
AND REQUIREMENT TO INFORM EMPLOYEES OF
WHISTLEBLOWER RIGHTS (APR 2014)....................................................... I-15
I.12. 1452.203-70 RESTRICTION ON ENDORSEMENTS--DEPARTMENT
OF THE INTERIOR (JUL 1996) ........................................................................ I-15
I.13. 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON
POSTCONSUMER FIBER CONTENT PAPER (MAY 2011) ......................... I-15
I.14. 52.204-7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013) ................... I-16
I.15. 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR
PERSONNEL (JAN 2011) ................................................................................. I-18
I.16. 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-
TIER SUBCONTRACT AWARDS (JUL 2013) ................................................ I-18
I.17. 52.204-12 DATA UNIVERSAL NUMBERING SYSTEM NUMBER
MAINTENANCE (DEC 2012) ........................................................................... I-22 iv
I.18. 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE.
(JUL 2013) .......................................................................................................... I-22
I.19. 1452.204-70 RELEASE OF CLAIMS -- DEPARTMENT OF THE
INTERIOR (JUL 1996) ..................................................................................... I-24
I.20. 52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN
SUBCONTRACTING WITH CONTRACTORS DEBARRED,
SUSPENDED, OR PROPOSED FOR DEBARMENT (AUG 2013) ................ I-24
I.21. 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION
REGARDING RESPONSIBILITY MATTERS (JUL 2013) ............................. I-26
I.22. 52.210-1 MARKET RESEARCH (APR 2011) .................................................. I-27
I.23. 52.215-2 AUDIT AND RECORDS--NEGOTIATION (OCT 2010) ................. I-27
I.24. 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT
FORMAT (OCT 1997) ....................................................................................... I-29
I.25. 52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST
OR PRICING DATA--MODIFICATION (AUG 2011) ..................................... I-29
I.26. 52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING
DATA--MODIFICATIONS (OCT 2010) ........................................................... I-31
I.27. 1452.215-70 EXAMINATION OF RECORDS BY THE DEPARTMENT
OF THE INTERIOR (AUG 1996) (DEVIATION) .............................................. I-32
I.28. 52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING
DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING
DATA—MODIFICATIONS (OCT 2010) .......................................................... I-32
I.29. CONTRACTOR'S TECHNICAL PROPOSAL INCORPORATED INTO
CONTRACT - BUREAU OF RECLAMATION - PN REGION (MAR
2001) ................................................................................................................... I-33
I.30. 52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR
HUBZONE SMALL BUSINESS CONCERNS (OCT 2014) ............................ I-34
I.31. 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT
2014) ................................................................................................................... I-35
I.32. 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2014)
– ALTERNATE I (OCT 2001) ........................................................................... I-38
I.33. 52.219-16 LIQUIDATED DAMAGES--SUBCONTRACTING PLAN
(JAN 1999).......................................................................................................... I-47
I.34. 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM
REREPRESENTATION (JUL 2013) ................................................................. I-48
I.35. 52.222-3 CONVICT LABOR (JUNE 2003) ....................................................... I-49
I.36. 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS
-OVERTIME COMPENSATION (MAY 2014) ................................................ I-50
I.37. 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (MAY
2014) ................................................................................................................... I-51 I.38. 52.222-7 WITHHOLDING OF FUNDS (MAY 2014) ....................................... I-54 I.39. 52.222-8 PAYROLLS AND BASIC RECORDS (MAY 2014) ......................... I-54 I.40. 52.222-9 APPRENTICES AND TRAINEES (JULY 2005) ............................... I-56 v
I.41. 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS
(FEB 1988) .......................................................................................................... I-57
I.42. 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014) ............ I-57
I.43. 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014) ........ I-59
I.44. 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE
REQUIREMENTS AND RELATED REGULATIONS (MAY 2014) .............. I-59
I.45. 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB
1988) ................................................................................................................... I-59 I.46. 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2014) ......................... I-59
I.47. 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (FEB 1999) ....... I-60
I.48. 52.222-26 EQUAL OPPORTUNITY (MAR 2007) ........................................... I-60
I.49. 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS
FOR CONSTRUCTION (FEB 1999) ................................................................. I-62
I.50. 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUL 2014) ............... I-67
I.51. 52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH
DISABILITIES (OCT 2010) ............................................................................... I-68
I.52. 52.222-37 EMPLOYMENT REPORTS VETERANS (JUL 2014) .................... I-69
I.53. 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE
NATIONAL LABOR RELATIONS ACT (DEC 2010) ..................................... I-70
I.54. 52.222-50 COMBATING TRAFFICKING IN PERSONS (FEB 2009) ............ I-72
I.55. 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (AUG 2013) ...... I-74
I.56. 52.222·99, ESTABLISHING A MINIMUM WAGE FOR
CONTRACTORS (JUL 2014) (DEVIATION) ................................................... I-77
I.57. 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND
MATERIAL SAFETY DATA (JAN 1997) ALTERNATE I (JUL 1995) .......... I-78
I.58. 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW
INFORMATION (MAY 2011) ........................................................................... I-80 I.59. 52.223-6 DRUG-FREE WORKPLACE (MAY 2001) ....................................... I-81
I.60. 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT
MESSAGING WHILE DRIVING (AUG 2011) ................................................. I-82
I.61. WBR 1452.223-80 ASBESTOS-FREE WARRANTY--BUREAU OF
RECLAMATION (OCT 1992) ........................................................................... I-83
I.62. WBR 1452.223-81 SAFETY AND HEALTH -- BUREAU OF
RECLAMATION (MAY 2010) .......................................................................... I-84
I.63. WBR 1452.223-82 PROTECTING FEDERAL EMPLOYEES AND THE
PUBLIC FROM EXPOSURE TO TOBACCO SMOKE IN THE
FEDERAL WORKPLACE–BUREAU OF RECLAMATION (DEC 2009) ...... I-85
I.64. 52.225-9 BUY AMERICAN-CONSTRUCTION MATERIALS (MAY
2014) ................................................................................................................... I-85
I.65. 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES
(JUNE 2008) ....................................................................................................... I-88
I.66. 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007) ........................... I-89 vi
I.67. 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND
COPYRIGHT INFRINGEMENT (DEC 2007) .................................................. I-89
I.68. 52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS
(DEC 2007) ......................................................................................................... I-89
I.69. 52.227-17 RIGHTS IN DATA - SPECIAL WORKS (DEC 2007) .................... I-90 I.70. 52.228-1 BID GUARANTEE (SEP 1996) ......................................................... I-91 I.71. 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997) ............................... I-92
I.72. 52.228-5 INSURANCE--WORK ON A GOVERNMENT
INSTALLATION (JAN 1997) ............................................................................ I-92 I.73. 52.228-11 PLEDGE OF ASSETS (JAN 2012) .................................................. I-93
I.74. 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR
BONDS (MAY 2014) ......................................................................................... I-93 I.75. 52.228-14 IRREVOCABLE LETTER OF CREDIT (DEC 1999)...................... I-93
I.76. 52.228-15 PERFORMANCE AND PAYMENT BONDS-
CONSTRUCTION (OCT 2010) ......................................................................... I-97
I.77. 1452.228-70 LIABILITY INSURANCE-DEPARTMENT OF THE
INTERIOR (JUL 1996) ....................................................................................... I-98
I.78. WBR 1452.228-84 CERTIFICATION OF REPRESENTATIVES FOR
CORPORATE SURETIES--BUREAU OF RECLAMATION (SEP 1996)....... I-99
I.79. 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013) .................. I-99
I.80. WBR 1452.231-81 EQUIPMENT OWNERSHIP AND OPERATING
EXPENSE -- BUREAU OF RECLAMATION (JUL 1998) ............................ I-100
I.81. 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION
CONTRACTS (MAY 2014) ............................................................................. I-102 I.82. 52.232-17 INTEREST (MAY 2014) ................................................................ I-105 I.83. 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014).................................... I-107
I.84. 52.232-27 PROMPT PAY FOR CONSTRUCTION CONTRACTS (MAY
2014) ................................................................................................................. I-107
I.85. 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-
SYSTEM FOR AWARD MANAGEMENT (JUL 2013)................................. I-116
I.86. 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED
OBLIGATIONS (JUN 2013) ............................................................................ I-117
I.87. 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL
BUSINESS SUBCONTRACTORS (DEC 2013) ............................................. I-118
I.88. WBR 1452.232-81 PAYMENT FOR MOBILIZATION AND
PREPARATORY WORK --BUREAU OF RECLAMATION (MAY
2000) ALTERNATE II (JUNE 2002) ............................................................... I-118
I.89. WBR 1452.232-82 OTHER INVOICE REQUIREMENTS -- BUREAU
OF RECLAMATION (DEC 2002) ................................................................... I-120
I.90. PROJECTION OF INVOICES -- PACIFIC NORTHWEST REGION
(MAR 2000) ...................................................................................................... I-120
I.91. 52.233-1 DISPUTES (MAY 2014) ALTERNATE I (DEC 1991) ................... I-121 I.92. 52.233-3 PROTEST AFTER AWARD (AUG 1996) ....................................... I-122 vii
I.93. 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM
(OCT 2004) ....................................................................................................... I-123
I.94. WBR 1452.233-81 CLAIMS ACCOUNTING -- BUREAU OF
RECLAMATION (JUL 1993) .......................................................................... I-123
I.95. 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR
1984) ................................................................................................................. I-123
I.96. 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)................................ I-123
I.97. 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING
THE WORK (APR 1984) ................................................................................. I-124
I.98. 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984) ...... I-124
I.99. 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991) ........................ I-125
I.100. 52.236-9 PROTECTION OF EXISTING VEGETATION,
STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS
(APR 1984) ....................................................................................................... I-125
I.101. 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984) ................. I-125
I.102. 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR
1984) ................................................................................................................. I-126 I.103. 52.236-12 CLEANING UP (APR 1984) .......................................................... I-126
I.104. 52.236-13 ACCIDENT PREVENTION (NOV 1991) - ALTERNATE I
(NOV 1991) ...................................................................................................... I-126
I.105. 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR
1984) ................................................................................................................. I-127
I.106. 52.236-21 SPECIFICATIONS AND DRAWINGS FOR
CONSTRUCTION (FEB 1997)- ALTERNATE I (APR 1984) ....................... I-128
I.107. 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995) .................... I-129
I.108. WBR 1452.236-84 PRESERVATION OF CULTURAL RESOURCES –
BUREAU OF RECLAMATION (FEB 2000) .................................................. I-129
I.109. WBR 1452.237-80 SECURITY REQUIREMENTS – BUREAU OF
RECLAMATION (FEBRUARY 2011) ............................................................ I-131
I.110. PN REGION IMPLEMENTATION OF SECURITY REQUIREMENTS –
CONSTRUCTION CONTRACTS ................................................................... I-136 I.111. 52.242-13 BANKRUPTCY (JUL 1995) ........................................................... I-137 I.112. 52.243-4 CHANGES (JUNE 2007) .................................................................. I-137 I.113. 52.243-6 CHANGE ORDER ACCOUNTING (APR 1984) ............................ I-138
I.114. WBR 1452.243-80 MODIFICATION PROPOSALS -- BUREAU OF
RECLAMATION (DEC 2001) ALTERNATES IV (JUL 1998) ...................... I-138
I.115. 52.244-2 SUBCONTRACTS (OCT 2010) ....................................................... I-139
I.116. 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (OCT 2014) ..... I-141
I.117. 52.247-64 PREFERENCE FOR PRIVATELY OWNED U.S.-FLAG
COMMERCIAL VESSELS (FEB 2006) .......................................................... I-143
I.118. 52.248-3 VALUE ENGINEERING—CONSTRUCTION (OCT 2010) -
ALTERNATE I (APR 1984) ............................................................................ I-145 viii
I.119. 52.249-2 TERMINATION FOR CONVENIENCE OF THE
GOVERNMENT (FIXED-PRICE) (APR 2012)-ALTERNATE I (SEP
1996) ................................................................................................................. I-148
I.120. 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984) ....... I-152
I.121. 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984) ............ I-153
I.122. 52.253-1 COMPUTER GENERATED FORMS (JAN 1991) .......................... I-153
PART III
LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J LIST OF ATTACHMENTS ............................................................................. J-1
PART IV
REPRESENTATIONS AND INSTRUCTIONS
SECTION K REPRESENTATIONS, CERTIFICATIONS, AND OTHER
STATEMENTS OF OFFERORS OR RESPONDENTS .............................. K-1
K.1. 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS
(OCT 2014) ......................................................................................................... K-1
K.2. 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS
(JUL 2013) .......................................................................................................... K-5
K.3. NOTICE TO HUBZONE SMALL BUSINESS CONCERNS
REGARDING WAIVER OF PRICE EVALUATION PREFERENCE
ADJUSTMENT - BUREAU OF RECLAMATION - PN REGION (APR
2001) ................................................................................................................... K-7
SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
OR RESPONDENTS .........................................................................................L-1
L.1. 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA
INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND
COMMERCIAL ITEM DESCRIPTIONS, FPMR PART 101-29 (AUG
1998) .................................................................................................................... L-1
L.2. 52.211-3 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE
GSA INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND
COMMERCIAL ITEM DESCRIPTIONS (JUN 1988) ....................................... L-1
L.3. 52.211-6 BRAND NAME OR EQUAL (AUG 1999) (DEVIATION) ................ L-1
L.4. WBR 1452.211-80 NOTICE OF INTENT TO ACQUIRE METRIC
PRODUCTS AND SERVICES - BUREAU OF RECLAMATION (MAR
1993) .................................................................................................................... L-2
L.5. 52.215-1 INSTRUCTIONS TO OFFERORSBCOMPETITIVE
ACQUISITION (JAN 2004) ................................................................................ L-3 ix
L.6. 52.215-20 REQUIREMENTS FOR CERTIFIED COST OR PRICING
DATA OR INFORMATION OTHER THAN CERTIFIED COST OR
PRICING DATA (OCT 2010) ............................................................................. L-7
L.7. 1452.215-71 USE AND DISCLOSURE OF PROPOSAL
INFORMATION--DEPARTMENT OF THE INTERIOR (APR 1984) ............. L-8
L.8. WBR 1452.215-80 SOURCE EVALUATION AND SELECTION
PROCEDURES--BUREAU OF RECLAMATION (MAY 2005) .................... L-10
L.9. WBR 1452.215-81 GENERAL PROPOSAL INSTRUCTIONS--
BUREAU OF RECLAMATION (JAN 1998)-ALTERNATE I ........................ L-12
L.10. WBR 1452.215-82 TECHNICAL PROPOSAL INSTRUCTIONS--
BUREAU OF RECLAMATION (APR 2001) ................................................... L-14
L.11. WBR 1452.215-83 PRICING PROPOSAL INSTRUCTIONS--BUREAU
OF RECLAMATION (JAN 1998)..................................................................... L-18
L.12. FACSIMILE ACKNOWLEDGMENT OF AMENDMENTS,
MODIFICATIONS TO OFFERS, AND WITHDRAWALS OF OFFERS-
BUREAU OF RECLAMATION--PN REGION (APR 2007) ........................... L-19
L.13. NOTICE OF INTENT TO INCORPORATE CONTRACTOR'S
TECHNICAL PROPOSAL - BUREAU OF RECLAMATION - PN
REGION (MAR 2001) ....................................................................................... L-20
L.14. 52.216-1 TYPE OF CONTRACT (APR 1984) ................................................. L-21
L.15. NOTICE TO HUBZONE SMALL BUSINESS CONCERN OF A PRICE
EVALUATION ADJUSTMENT - BUREAU OF RECLAMATION - PN
REGION (APR 2001) ........................................................................................ L-21
L.16. 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—
SECONDARY SITE OF THE WORK (MAY 2014) ........................................ L-21
L.17. 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION
TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR
CONSTRUCTION (FEB 1999) ......................................................................... L-21
L.18. NON-DISCRIMINATION NOTICE TO U.S. DEPARTMENT OF THE
INTERIOR CONTRACTORS, SUBCONTRACTORS, AND LESSORS -
- BUREAU OF RECLAMATION -- PN REGION (JAN 2000) ....................... L-22
L.19. 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—
CONSTRUCTION MATERIALS (MAY 2014) ............................................... L-23
L.20. INVOICING PROJECTION INFORMATION -- PACIFIC NORTHWEST
REGION (MAR 2000) ....................................................................................... L-24
L.21. 52.233-2 SERVICE OF PROTEST (SEPT 2006) (DEVIATION) .................... L-24
L.22. 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I
(FEB 1995) ......................................................................................................... L-24
L.23. 52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT
1997) .................................................................................................................. L-25
L.24. WBR 1452.236-86 INSTRUCTION FOR MOBILIZATION AND
PREPARATORY WORK SCHEDULE LINE ITEM -- MULTIPLE
SCHEDULES -- BUREAU OF RECLAMATION (JUNE 2002) ..................... L-25
x
L.25. 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984) ........ L-26
SECTION M EVALUATION FACTORS FOR AWARD .................................................. M-1
M.1. WBR WBR 1452.215-85 EVALUATION FACTORS FOR AWARD -
QUALITY PREDOMINANCE--BUREAU OF RECLAMATION (MAY
2005) ................................................................................................................... M-1
M.2. WBR 1452.225-80 EVALUATION FACTOR -- COST OF FOREIGN
INSPECTION SERVICE--BUREAU OF RECLAMATION (MAY 2000) ....... M-2
M.3. WBR 1452.225-82 NOTICE OF WORLD TRADE ORGANIZATION
GOVERNMENT PROCUREMENT AGREEMENT EVALUATIONS--
BUREAU OF RECLAMATION (MAY 2005) .................................................. M-2
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
Bureau of Reclamation
Pacific Northwest Region
Regional Office Acquisition Management Division
R10
1150 N. Curtis Road, Ste. 100
Boise ID 83706-1234
Bureau of Reclamation
Offer Depository - R14PS00485 1150 N. Curtis Rd., Suite 100 Boise, ID 83706-1234
Rebecca Thomson
1x 11/04/2014
R14PS00485
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Project Title: Allen E. Inman Powerplant Unit 8 and Unit 9 Turbine Overhaul, Minidoka Project, Idaho
Solicitation No. R14PS00485
Estimated Price Range of Work: $5,000,000 to $10,000,000
THIS SOLICTATION IS A FULL AND OPEN COMPETITIVE REQUIREMENT.
In Block 11 below, the number of days stated to complete after receipt of Notice to
Proceed (NTP) is estimated. The actual completion date is not a number of days after receipt of NTP, but is April 1, 2017, as stated in Clause F.1.
Block 14 below, it states provide 7 copies of your proposal--please review provision WBR 1452.215-81, General Proposal Instructions for the number of copies of the proposal, for each requested volume, to be submitted.
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 800 calendar days and complete it within ________________ ________________ calendar days after receiving
F.1., 52.211-10
01/08/2015
NSN 7540-01-155-3212
x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Bureau of Reclamation Pacific Northwest Region
Regional Office Acquisition Management Division
R10
1150 N. Curtis Road, Ste. 100
Boise ID 83706-1234
Rebecca L. Thomson
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
R14PS00485
FOB: Destination
00010 Mobilization and Preparatory Work - First Unit. 1 AU
(See Base Price Schedule I, CLIN 1-1.)
00020 Mobilization and Preparatory Work - Second Unit. 1 AU
(See Base Schedule 2, CLIN 2-1.)
00030 Allen E. Inman Powerplant Unit 8 and Unit 9 1 AU
Turbine Overhaul
(See Base Schedules 1 and 2 CLINs 1-2 through
1-26 and 2-2 through 2-26.)
00040 Hone runner blade servomotor cylinder 1 AU
(See Optional Schedule 1A, CLIN 1A-1.)
(Option Line Item)
00050 Machine and chrome runner blade servomotor piston 1 AU rod (See Optional Schedule 1A, CLIN 1A-2.)
(Option Line Item)
00060 Rebabbitt and machine turbine thrust shoes (See 1 AU
Optional Schedule IA, CLIN 1A-3.)
(Option Line Item)
00070 Rebabbitt and machine turbine counter thrust 1 AU shoes (See Optional Schedule IA, CLIN 1A-4.)
(Option Line Item)
00080 Rebabbitt and machine turbine guide bearing (See 1 AU
Optional Schedule 1A, CLIN 1A-5.)
(Option Line Item)
00090 Rebabbitt upstream guide bearing (See Optional 1 AU
Schedule 1A, CLIN 1A-6.)
(Option Line Item)
00100 Rebabbitt downstream guide bearing (See Optional 1 AU
Schedule 1A, CLIN 1A-7.)
(Option Line Item)
00110 Refurbish generator shaft journal (See Optional 1 AU
Schedule 1A, CLIN 1A-8.)
(Option Line Item)
00120 Hone wicket gate servomotor cylinder bore (See 1 AU
Optional Schedule 1A, CLIN 1A-9.)
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
R14PS00485
(Option Line Item)
00130 Machine and chrome wicket gate servomotor piston 1 AU rod (See Optional Schedule 1A, CLIN 1A-10.)
(Option Line Item)
00140 Hone runner blade servomotor cylinder 1 AU
(See Optional Schedule 2A, CLIN 2A-1.)
(Option Line Item)
00150 Machine and chrome runner blade servomotor piston 1 AU rod (See Optional Schedule 2A, CLIN 2A-2.)
(Option Line Item)
00160 Rebabbitt and machine turbine thrust shoes (See 1 AU
Optional Schedule 2A, CLIN 2A-3.)
(Option Line Item)
00170 Rebabbitt and machine turbine counter thrust 1 AU shoes (See Optional Schedule 2A, CLIN 2A-4.)
(Option Line Item)
00180 Rebabbitt and machine turbine guide bearing (See 1 AU
Optional Schedule 2A, CLIN 2A-5.)
(Option Line Item)
00190 Rebabbitt upstream guide bearing (See Optional 1 AU
Schedule 2A, CLIN 2A-6.)
(Option Line Item)
00200 Rebabbitt downstream guide bearing (See Optional 1 AU
Schedule 2A, CLIN 2A-7.)
(Option Line Item)
00210 Refurbish generator shaft journal (See Optional 1 AU
Schedule 2A, CLIN 2A-8.)
(Option Line Item)
00220 Hone wicket gate servomotor cylinder bore (See 1 AU
Optional Schedule 2A, CLIN 2A-9.)
(Option Line Item)
00230 Machine and chrome wicket gate servomotor piston 1 AU rod (See Optional Schedule 2A, CLIN 2A-10.)
(Option Line Item)
Optional Items 40 - 230 (correspond to CLINs 1A-1 through 1A-10 and 2A-1 through 2A-10 as shown on
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
5 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
R14PS00485
the "Continuation of Section B-Supplies or
Services and Prices/Costs", pages B-3, B-5, and
B6), will be incorporated by modification if the condition of the unit (determined during tear down) requires the work specified in the CLIN.
If the awardee determines the option work affects the critical path schedule a request for proposal including a time impact analysis shall be submitted to the C.O. within 10 days of receipt of the modification. If it is determined that the additional time is required a supplemental agreement extending the contract performance period will be executed.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Solicitation No.R14PS00485
CONTINUATION OF SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
B-1
ALLEN E. INMAN POWERPLANT
UNIT 8 AND UNIT 9 TURBINE OVERHAUL
Pacific Northwest Region – Minidoka Project
Idaho
B.1 SCHEDULES
A. Offers will be considered for award on the following schedules, but no offer will be considered for award on only a part of the schedules.
B. Offerors shall complete the optional schedules. Failure to complete the optional schedules will result in an incomplete offer, which will not be considered. The Government will award Base Schedule 1 and Base Schedule 2. Optional Schedules 1A and 2A may be exercised either all or in portions during performance as necessary.
C. All offers are subject to the terms and conditions of this solicitation.
D. See the contract clause at WBR 1452.232-81, Alt II, “Payment for Mobilization and Preparatory Work” for CLIN1-1, and 2-1 in each schedule.
E. Definitions:
1. CLIN – Contract Line Item Number.
BASE SCHEDULE 1 – First Outage
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
1-1 WBR
1452.23 2-81
Mobilization and preparatory work – First unit
For the lump sum of $
1-2 09 96 20 Coatings For the lump sum of $
1-3 26 05 20 Conductors and Cables For the lump sum of $
1-4 26 05 33 Electrical Conduit and Cable Tray
For the lump sum of $
1-5 48 13 03
Pre-Teardown Readings and Measurements
B-2
BASE SCHEDULE 1 – First Outage
Unit Price
Amount
1-6 48 13 04 Disassembly For the lump sum of $
1-7 48 13 07 Reassembly and Alignment
For the lump sum of $
1-8 48 13 08 Commissioning For the lump sum of $
1-9 48 13 09 Critical Connection Fasteners
For the lump sum of $
1-10 48 13 10 Kaplan Turbine Runner For the lump sum of $
1-11 48 13 11 Turbine Shaft For the lump sum of $
1-12 48 13 15 Mechanical Seals For the lump sum of $
1-13 48 13 16 Turbine Guide/Thrust Bearing
For the lump sum of $
1-14 48 13 17 Generator Guide Bearings For the lump sum of $
1-15 48 13 20 Outer Gate Barrel For the lump sum of $
1-16 48 13 21 Inner Gate Barrel For the lump sum of $
1-17 48 13 24 Inner Barrel Extension For the lump sum of $
1-18 48 13 25 Wicket Gates For the lump sum of $
1-19 48 13 26 Wicket Gate Levers and Links
For the lump sum of $
1-20 48 13 28 Bushings For the lump sum of $
1-21 48 13 29 Operating Ring For the lump sum of $
1-22 48 13 30 Wicket Gate Servomotor For the lump sum of $
1-23 48 13 31 Governor Oil Pumping Unit
For the lump sum of $
1-24 48 13 32 Bearing Oil Pumping Unit For the lump sum of $
1-25 48 13 43 Brake Assembly For the lump sum of $
1-26 48 15 55 Digital –Electronic Governor
TOTAL FOR BASE SCHEDULE 1 ............................................................... $__________
B-3
OPTIONAL SCHEDULE 1A – Optional Items for First Outage
CLIN Section Supplies or Services Quantity and Unit Unit Price
Amount
1A-1 48 13 10 Hone runner blade servomotor cylinder
For the lump sum of $
1A-2 48 13 10 Machine and Chrome runner blade servomotor piston rod
For the lump sum of $
1A-3 48 13 16 Rebabbitt and machine turbine thrust shoes
For the lump sum of $
1A-4 48 13 16 Rebabbitt and machine turbine counter thrust shoes
For the lump sum of $
1A-5 48 13 16 Rebabbitt and machine turbine guide bearing
For the lump sum of $
1A-6 48 13 17 Rebabbitt Upstream Guide Bearing
For the lump sum of $
1A-7 48 13 17 Rebabbitt Downstream Guide Bearing
For the lump sum of $
1A-8 48 13 17 Refurbish Generator Shaft Journal
For the lump sum of $
1A-9 48 13 30 Hone Wicket Gate Servomotor Cylinder Bore
For the lump sum of $
1A-10 48 13 30 Machine and Chrome Wicket Gate Servomotor Piston Rod
TOTAL FOR OPTIONAL SCHEDULE 1A .................................................. $__________
B-4
BASE SCHEDULE 2 – for Second Outage
Unit Price
Amount
2-1 WBR
1452.232 -81
Mobilization and preparatory work – Second Unit
For the lump sum of $
2-2 09 96 20 Coatings For the lump sum of $
2-3 26 05 20 Conductors and Cables For the lump sum of $
2-4 26 05 33 Electrical Conduit and Cable Tray
2-5 48 13 03
Pre-Teardown Readings and Measurements
For the lump sum of $
2-6 48 13 04 Disassembly For the lump sum of $
2-7 48 13 07 Reassembly and Alignment
For the lump sum of $
2-8 48 13 08 Commissioning For the lump sum of $
2-9 48 13 09 Critical Connection Fasteners
For the lump sum of $
2-10 48 13 10 Kaplan Turbine Runner For the lump sum of $
2-11 48 13 11 Turbine Shaft For the lump sum of $
2-12 48 13 15 Mechanical Seals For the lump sum of $
2-13 48 13 16 Turbine Guide/Thrust Bearing
For the lump sum of $
2-14 48 13 17 Generator Guide Bearings
For the lump sum of $
2-15 48 13 20 Outer Gate Barrel For the lump sum of $
2-16 48 13 21 Inner Gate Barrel For the lump sum of $
2-17 48 13 24 Inner Barrel Extension For the lump sum of $
2-18 48 13 25 Wicket Gates For the lump sum of $
2-19 48 13 26 Wicket Gate Levers and Links
For the lump sum of $
2-20 48 13 28 Bushings For the lump sum of $
2-21 48 13 29 Operating Ring For the lump sum of $
B-5
BASE SCHEDULE 2 – for Second Outage
Unit Price
Amount
2-22 48 13 30 Wicket Gate Servomotor For the lump sum of $
2-23 48 13 31 Governor Oil Pumping Unit
For the lump sum of $
2-24 48 13 32 Bearing Oil Pumping Unit
For the lump sum of $
2-25 48 13 43 Brake Assembly For the lump sum of $
2-26 48 15 55 Digital –Electronic Governor
TOTAL FOR BASE SCHEDULE 2 ............................................................ $_________
OPTIONAL SCHEDULE 2A – Optional Items for Second Outage
Unit Price
Amount
2A-1 48 13 10 Hone runner blade servomotor cylinder
For the lump sum of $
2A-2 48 13 10 Machine and Chrome runner blade servomotor piston rod
For the lump sum of $
2A-3 48 13 16 Rebabbitt and machine turbine thrust shoes
For the lump sum of $
2A-4 48 13 16 Rebabbitt and machine turbine counter thrust shoes
For the lump sum of $
2A-5 48 13 16 Rebabbitt and machine turbine guide bearing
For the lump sum of $
2A-6 48 13 17 Rebabbitt Upstream Guide Bearing
For the lump sum of $
2A-7 48 13 17 Rebabbitt Downstream Guide Bearing
For the lump sum of $
2A-8 48 13 17 Refurbish Generator Shaft Journal
B-6
OPTIONAL SCHEDULE 2A – Optional Items for Second Outage
Unit Price
Amount
2A-9 48 13 30 Hone Wicket Gate Servomotor Cylinder Bore
For the lump sum of $
2A-10 48 13 30 Machine and Chrome Wicket Gate Servomotor Piston Rod
TOTAL FOR OPTIONAL SCHEDULE 2A ................................................... $___________
TOTAL FOR ALL SCHEDULES
1 Total for Base Schedule 1 $
2 Total for Optional Schedule 1A $
3 Total for Base Schedule 2 $
4 Total for Optional Schedule 2A $
5 Total for All Schedules (Total of all lines) $
END OF SCHEDULE
DIVISION 01 - GENERAL REQUIREMENTS
Summary of Work 01 11 00 - 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.01 LOCATION
A. The location for delivery and construction is Inman Powerhouse approximately 20 miles northeast of Heyburn, Idaho, in Cassia County.
B. Location of the dam and powerplant are shown on location map drawing 17-107-2000.
1.02 PRINCIPAL COMPONENTS OF WORK
A. Furnish critical connection fasteners.
B. Rehabilitate outer gate barrel, inner gate barrel, turbine shaft, operating ring, gate arms, and gate linkage.
C. Redesign and machine wicket gate seals/packing.
D. Replace greaseless bushings.
E. Refurbish runner hub and replace bushings.
F. Replace upstream and downstream mechanical seals.
G. Replace governor oil unit and relocate.
H. Replace bearing oil unit and relocate.
I. Furnish new inner gate barrel extension.
J. Rehabilitate turbine thrust and guide bearing.
K. Refurbish brake assembly.
L. Replace digital governor control system.
M. Optional Items:
1. Rebabbitt turbine guide/thrust bearing.
2. Rebabbitt upstream generator guide bearing.
3. Rebabbitt downstream generator guide bearing.
4. Hone runner blade servomotor cylinder.
01 11 00 - 2
5. Chrome runner blade servomotor rod.
1.03 SPECIFICATIONS REQUIREMENTS
A. Requirements in Division 1 – General Requirements apply to Divisions 2 through 52.
B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.
C. Where specifications are written in streamlined form, the words “shall be” are included by inference where a colon (:) is used within the sentence or phrase.
1.04 DEFINITIONS
A. When the specifications use a word or term defined in the Federal Acquisition Regulations (FAR), the definition of the word or term shall be in accordance with FAR sections in effect at the time the solicitation was issued.
1.05 ACRONYMS
A. The following acronyms apply to specifications Divisions 1 through 52:
1. Contracting:
a. AC: Alternating Current.
b. AGC: Automatic Generation Control.
c. CD: Compact Disk.
d. PMWFS: Project Management Work Flow System.
e. CM: Construction Modification.
f. CO: Contracting Officer.
g. COR: Contracting Officer’s Representative.
h. CPR: Cardiopulmonary resuscitation.
i. CT: Current Transformer.
j. DC: Direct Current.
k. DIR: Daily Inspection Report.
l. DOD: Department Of Defense.
m. DVD: Digital Video Disc.
n. EEA: Expected Equity Adjustment.
o. FIST: Facility Instructions, Standards, and Techniques.
p. HMI: Human Machine Interface.
01 11 00 - 3
q. HPU: Hydraulic Pressure Unit.
r. ISO VG: International Standards Organization Viscosity Grade.
s. LVDT: Linear Variable Differential Transformer.
t. MLDT: Magnetostrictive Linear Displacement Transducer.
u. Mpa: Megapascal.
v. MT: Magnetic Particle Examination.
w. NDE: Non-Destructive Examination.
x. NDT: Non-Destructive Testing.
y. NTP: Notice to Proceed.
z. OEM: Original Equipment Manufacturer.
aa. OGR: Onsite Government Representative.
bb. OSB: Oriented Strand Board.
cc. OSHA: Occupational Safety and Health Administration.
dd. PDM: Precedence Diagramming Method.
ee. PMWFS - Project Management Work Flow System.
ff. PT: Dye-Penetrant Test.
gg. QA: Quality Assurance.
hh. QC: Quality Control.
ii. Ra: Roughness average.
jj. RFC: Request for Change.
kk. RFI: Request for Information.
ll. RFP: Request for Proposal.
mm. RSHS: Reclamation Safety and Health Standards.
nn. RSN: Required Submittal Number.
oo. RTD: Resistance Temperature Detector.
pp. RTU: Remote Terminal Unit.
qq. SCADA: Supervisory Control and Data Acquisition.
rr. SSG: Speed Signal Generator.
ss. UN: Unified Constant Pitch Threads.
tt. UNR: Unified National Thread Series with external thread controlled root radius.
uu. US: United States.
01 11 00 - 4
vv. USBR: United States Bureau of Reclamation.
ww. UT: Ultrasonic Test.
xx. VOC: Volatile Organic Compound.
yy. VT: Visual Test.
zz. ZVPU: Zero Velocity Pick-Up.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
END OF SECTION
Use of Site 01 14 10 - 1
SECTION 01 14 10
USE OF SITE
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the Schedules for other items of work.
1.02 REFERENCE STANDARDS
A. Bureau of Reclamation (USBR)
1. USBR Cleaning Manual Inspection and Cleaning Manual for Equipment and Vehicles to Prevent the Spread of Invasive Species (Technical memorandum No. 86-68220-07-05) 2012 Edition Available online at:
http://www.usbr.gov/mussels/prevention
1.03 SUBMITTALS
A. Submit the following in accordance with Section 01 33 00 – Submittals.
B. RSN 01 14 10-1, Land Use and Landscape Rehabilitation Plan:
1. Provide a plan for each Contractor use site on Government land.
2. Construction trailer location close to the powerplant shall be determined after award.
3. Privately owned vehicles not allowed to park within 100 feet of powerplant, gatehouse, or switchyard. Parking location to be determined after award.
4. No office space available inside the powerplant.
5. Laydown locations inside and outside security fence shall be determined after award.
a. Show use location and extent of impact. Uses include but are not limited to the following:
1) Buildings and service areas including offices, shops, warehouses, storage areas, fuel and oil storage areas, and fabrication yards.
2) Paint booths.
3) Parking areas, temporary roads, and haul routes.
http://www.usbr.gov/mussels/prevention
01 14 10 - 2
4) Utilities including air, power, and water lines; fire hydrants; and compressor station.
5) First-aid and medical facilities.
6) Areas for processing, storing, and disposing of waste materials from construction operations.
7) Temporary fences.
b. Describe methods to preserve, protect, and repair if damaged, vegetation (such as trees, shrubs, and grass) and other landscape features on or adjacent to the jobsite, which are not to be removed and which do not interfere with the work required under this contract. Include methods to mark work area limits, protect disturbed areas, and prevent erosion.
c. Describe methods to protect, and repair if damaged, existing improvements and utilities at or near the jobsite.
d. Describe methods for removing temporary structures and facilities, cleanup, and rehabilitating site after completion of construction activities.
6. Submit revised drawings of changes in use of Government land made during design and erection stages or after use of Government land is in operation.
1.04 PROJECT CONDITIONS
A. Government land may be used for required construction…