Executed_Amd_0001.pdf

PDF 102 KB Posted

Attached to
z--Inman Powerplant Unit 8 & 9 Turbine Overhaul
Solicitation number
R14PS00485
Issued by

About this file

Amendment 0001 - POC for site visit revised

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

R14PS00485

x x

7 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Boise ID 83706-1234 1150 N. Curtis Road, Ste. 100

R10

Acquisition Management Division Regional Office Pacific Northwest Region Bureau of Reclamation

11/12/2014000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

11/04/2014

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Rebecca L. Thomson

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

R14PS00485/000001

A. Project Title: Allen E. Inman Powerplant Unit 8 and Unit 9 Turbine Overhaul, Minidoka Project, Idaho

B. The time and date for receipt of offers remains 2:00 pm, Mountain Time, January 8, 2015.

C. Acknowledgment: See block 11 above regarding how to acknowledge this amendment. The acknowledgment must be received at the place designated for receipt of offers (see block 8 of

"Solicitation, Offer and Award" Standard Form

1442).

D. Offer Modification: See block 11 above if you have submitted your offer and now desire to modify or withdraw it.

E. Third Party: If you have given your copy of the solicitation to someone else, please forward this amendment accordingly.

NOTE: The following changes are hereby incorporated into the solicitation. Single-sided replacement pages are provided following this

Standard Form 30 and changes are shown with left side bar or shaded. Offerors who¿ve prepared

2-sided copies of the solicitation may wish to attach the one-sided revised pages to the original version in order to preserve the reverse side of the original page.

F. In Section L, Instructions, Conditions, and Notices to Offerors or Respondents, the followings page is deleted and the attached revised page is substituted therefore:

Remove Page Insert Revised Pages

L-24 L-24

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Solicitation No. R14PS00485 Allen E. Inman Powerplant Unit 8 and Unit 9 Turbine Overhaul Amendment 001

L-24(Revised)

L.20. INVOICING PROJECTION INFORMATION -- PACIFIC NORTHWEST REGION

(MAR 2000)

Offerors should be aware that award of a contract pursuant to this solicitation will require that the contractor submit to the Contracting Officer a projection of the amounts for which it will submit invoices for payment, by month. The contractor shall be required to update the projection each time it submits an invoice.

L.21. 52.233-2 SERVICE OF PROTEST (SEPT 2006) (DEVIATION)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer by obtaining written and dated acknowledgment of receipt from the address and official designated in block 7 of the Standard Form 1442 or block numbers 7 and 10 of the Standard Form 33. A copy of the protest served on the Contracting Officer shall be simultaneously furnished by the protester to the Assistant Solicitor for Procurement and Patents, Office of the Solicitor, Room 6511, U.S. Department of the Interior, 18th and C Streets, NW., Washington DC 20240.

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(c) A copy of the protest served on the Contracting Officer shall be simultaneously furnished by the protestor to the Department of the Interior Assistant Solicitor for Procurement and Patents, 1849 C Street, NW, Room 6511, Washington D.C. 20240.

L.22. 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation.

Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for-- November 20, 2014 at 11 a.m. local time.

(c) Participants will meet at-- Allen E. Inman Powerplant, Idaho

(d) Pre-registration of participants planning to attend the site visit is required due to security concerns. The point of contact for pre-registration is Mr. Steve DeHerrera, his contact information is telephone at 208-378-5369, or email at sdeherrera@usbr.gov. Pre-registration must be completed no later than 2 p.m. (MT), Wednesday, November 17, 2014.

Amd001TEXT RFP.pdf
PART I THE SCHEDULE
SECTION A SOLICITATION/CONTRACT FORM
SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS
SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SECTION D PACKAGING AND MARKING
SECTION E INSPECTION AND ACCEPTANCE
E.1. 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)
E.2. 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
E.3. 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994) - ALTERNATE I APR 1984)
SECTION F DELIVERIES OR PERFORMANCE
F.1. 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
F.2. 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEPT 2000)
F.3. 52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)
F.4. 52.242-14 SUSPENSION OF WORK (APR 1984)
SECTION G CONTRACT ADMINISTRATION DATA
G.1. 1452.201-70 AUTHORITIES AND DELEGATIONS--DEPARTMENT OF THE INTERIOR (MAY 2010)
G.2. ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS-INVOICE PROCESSING PLATFORM (IPP) (APRIL 2013)
SECTION H SPECIAL CONTRACT REQUIREMENTS
H.1. KEY PERSONNEL REQUIREMENTS--BUREAU OF RECLAMATION--PN REGION (FEB 1995)
H.2. AUTHORIZED WORKERS NOTICE TO POTENTIAL BUREAU OF RECLAMATION CONTRACTORS (SEP 2002)
H.3. CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (JULY 2010)
PART II CONTRACT CLAUSES
SECTION I CONTRACT CLAUSES
I.1. 52.202-1 DEFINITIONS (NOV 2013)
I.2. 52.203-3 GRATUITIES (APR 1984)
I.3. 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
I.4. 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEPT 2006)
I.5. 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)
I.6. 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
I.7. 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
I.8. 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT 2010)
I.9. 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (APR 2010)
I.10. 52.203-14 DISPLAY OF HOTLINE POSTER(S) (DEC 2007)
I.11. 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (APR 2014)
I.12. 1452.203-70 RESTRICTION ON ENDORSEMENTS--DEPARTMENT OF THE INTERIOR (JUL 1996)
I.13. 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011)
I.14. 52.204-7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013)
I.15. 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
I.16. 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (JUL 2013)
I.17. 52.204-12 DATA UNIVERSAL NUMBERING SYSTEM NUMBER MAINTENANCE (DEC 2012)
I.18. 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE. (JUL 2013)
I.19. 1452.204-70 RELEASE OF CLAIMS -- DEPARTMENT OF THE INTERIOR (JUL 1996)
I.20. 52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (AUG 2013)
I.21. 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)
I.22. 52.210-1 MARKET RESEARCH (APR 2011)
I.23. 52.215-2 AUDIT AND RECORDS--NEGOTIATION (OCT 2010)
I.24. 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)
I.25. 52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA--MODIFICATION (AUG 2011)
I.26. 52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA--MODIFICATIONS (OCT 2010)
I.27. 1452.215-70 EXAMINATION OF RECORDS BY THE DEPARTMENT OF THE INTERIOR (AUG 1996) (DEVIATION)
I.28. 52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA—MODIFICATIONS (OCT 2010)
I.29. CONTRACTOR'S TECHNICAL PROPOSAL INCORPORATED INTO CONTRACT - BUREAU OF RECLAMATION - PN REGION (MAR 2001)
I.30. 52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS CONCERNS (OCT 2014)
I.31. 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2014)
I.32. 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2014) – ALTERNATE I (OCT 2001)
I.33. 52.219-16 LIQUIDATED DAMAGES--SUBCONTRACTING PLAN (JAN 1999)
I.34. 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)
I.35. 52.222-3 CONVICT LABOR (JUNE 2003)
I.36. 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS -OVERTIME COMPENSATION (MAY 2014)
I.37. 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (MAY 2014)
I.38. 52.222-7 WITHHOLDING OF FUNDS (MAY 2014)
I.39. 52.222-8 PAYROLLS AND BASIC RECORDS (MAY 2014)
I.40. 52.222-9 APPRENTICES AND TRAINEES (JULY 2005)
I.41. 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)
I.42. 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)
I.43. 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014)
I.44. 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED REGULATIONS (MAY 2014)
I.45. 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)
I.46. 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2014)
I.47. 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (FEB 1999)
I.48. 52.222-26 EQUAL OPPORTUNITY (MAR 2007)
I.49. 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (FEB 1999)
I.50. 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUL 2014)
I.51. 52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (OCT 2010)
I.52. 52.222-37 EMPLOYMENT REPORTS VETERANS (JUL 2014)
I.53. 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)
I.54. 52.222-50 COMBATING TRAFFICKING IN PERSONS (FEB 2009)
I.55. 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (AUG 2013)
I.56. 52.222 99, ESTABLISHING A MINIMUM WAGE FOR CONTRACTORS (JUL 2014) (DEVIATION)
I.57. 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN 1997) ALTERNATE I (JUL 1995)
I.58. 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)
I.59. 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
I.60. 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (AUG 2011)
I.61. WBR 1452.223-80 ASBESTOS-FREE WARRANTY--BUREAU OF RECLAMATION (OCT 1992)
I.62. WBR 1452.223-81 SAFETY AND HEALTH -- BUREAU OF RECLAMATION (MAY 2010)
I.63. WBR 1452.223-82 PROTECTING FEDERAL EMPLOYEES AND THE PUBLIC FROM EXPOSURE TO TOBACCO SMOKE IN THE FEDERAL WORKPLACE–BUREAU OF RECLAMATION (DEC 2009)
I.64. 52.225-9 BUY AMERICAN-CONSTRUCTION MATERIALS (MAY 2014)
I.65. 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUNE 2008)
I.66. 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)
I.67. 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT (DEC 2007)
I.68. 52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS (DEC 2007)
I.69. 52.227-17 RIGHTS IN DATA - SPECIAL WORKS (DEC 2007)
I.70. 52.228-1 BID GUARANTEE (SEP 1996)
I.71. 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)
I.72. 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
I.73. 52.228-11 PLEDGE OF ASSETS (JAN 2012)
I.74. 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (MAY 2014)
I.75. 52.228-14 IRREVOCABLE LETTER OF CREDIT (DEC 1999)
I.76. 52.228-15 PERFORMANCE AND PAYMENT BONDS-CONSTRUCTION (OCT 2010)
I.77. 1452.228-70 LIABILITY INSURANCE-DEPARTMENT OF THE INTERIOR (JUL 1996)
I.78. WBR 1452.228-84 CERTIFICATION OF REPRESENTATIVES FOR CORPORATE SURETIES--BUREAU OF RECLAMATION (SEP 1996)
I.79. 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
I.80. WBR 1452.231-81 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE -- BUREAU OF RECLAMATION (JUL 1998)
I.81. 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)
I.82. 52.232-17 INTEREST (MAY 2014)
I.83. 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
I.84. 52.232-27 PROMPT PAY FOR CONSTRUCTION CONTRACTS (MAY 2014)
I.85. 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-SYSTEM FOR AWARD MANAGEMENT (JUL 2013)
I.86. 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
I.87. 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)
I.88. WBR 1452.232-81 PAYMENT FOR MOBILIZATION AND PREPARATORY WORK --BUREAU OF RECLAMATION (MAY 2000) ALTERNATE II (JUNE 2002)
I.89. WBR 1452.232-82 OTHER INVOICE REQUIREMENTS -- BUREAU OF RECLAMATION (DEC 2002)
I.90. PROJECTION OF INVOICES -- PACIFIC NORTHWEST REGION (MAR 2000)
I.91. 52.233-1 DISPUTES (MAY 2014) ALTERNATE I (DEC 1991)
I.92. 52.233-3 PROTEST AFTER AWARD (AUG 1996)
I.93. 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
I.94. WBR 1452.233-81 CLAIMS ACCOUNTING -- BUREAU OF RECLAMATION (JUL 1993)
I.95. 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)
I.96. 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)
I.97. 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)
I.98. 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)
I.99. 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)
I.100. 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984)
I.101. 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)
I.102. 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)
I.103. 52.236-12 CLEANING UP (APR 1984)
I.104. 52.236-13 ACCIDENT PREVENTION (NOV 1991) - ALTERNATE I (NOV 1991)
I.105. 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)
I.106. 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)- ALTERNATE I (APR 1984)
I.107. 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)
I.108. WBR 1452.236-84 PRESERVATION OF CULTURAL RESOURCES – BUREAU OF RECLAMATION (FEB 2000)
I.109. WBR 1452.237-80 SECURITY REQUIREMENTS – BUREAU OF RECLAMATION (FEBRUARY 2011)
I.110. PN REGION IMPLEMENTATION OF SECURITY REQUIREMENTS – CONSTRUCTION CONTRACTS
I.111. 52.242-13 BANKRUPTCY (JUL 1995)
I.112. 52.243-4 CHANGES (JUNE 2007)
I.113. 52.243-6 CHANGE ORDER ACCOUNTING (APR 1984)
I.114. WBR 1452.243-80 MODIFICATION PROPOSALS -- BUREAU OF RECLAMATION (DEC 2001) ALTERNATES IV (JUL 1998)
I.115. 52.244-2 SUBCONTRACTS (OCT 2010)
I.116. 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (OCT 2014)
I.117. 52.247-64 PREFERENCE FOR PRIVATELY OWNED U.S.-FLAG COMMERCIAL VESSELS (FEB 2006)
I.118. 52.248-3 VALUE ENGINEERING—CONSTRUCTION (OCT 2010) - ALTERNATE I (APR 1984)
I.119. 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR 2012)-ALTERNATE I (SEP 1996)
I.120. 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)
I.121. 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
I.122. 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)
PART III LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J LIST OF ATTACHMENTS
PART IV REPRESENTATIONS AND INSTRUCTIONS
SECTION K REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS OR RESPONDENTS
K.1. 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2014)
K.2. 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)
K.3. NOTICE TO HUBZONE SMALL BUSINESS CONCERNS REGARDING WAIVER OF PRICE EVALUATION PREFERENCE ADJUSTMENT - BUREAU OF RECLAMATION - PN REGION (APR 2001)
SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
L.1. 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS, FPMR PART 101-29 (AUG 1998)
L.2. 52.211-3 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS (JUN 1988)
L.3. 52.211-6 BRAND NAME OR EQUAL (AUG 1999) (DEVIATION)
L.4. WBR 1452.211-80 NOTICE OF INTENT TO ACQUIRE METRIC PRODUCTS AND SERVICES - BUREAU OF RECLAMATION (MAR 1993)
L.5. 52.215-1 INSTRUCTIONS TO OFFERORS(COMPETITIVE ACQUISITION (JAN 2004)
L.6. 52.215-20 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA OR INFORMATION OTHER THAN CERTIFIED COST OR PRICING DATA (OCT 2010)
L.7. 1452.215-71 USE AND DISCLOSURE OF PROPOSAL INFORMATION--DEPARTMENT OF THE INTERIOR (APR 1984)
L.8. WBR 1452.215-80 SOURCE EVALUATION AND SELECTION PROCEDURES--BUREAU OF RECLAMATION (MAY 2005)
L.9. WBR 1452.215-81 GENERAL PROPOSAL INSTRUCTIONS--BUREAU OF RECLAMATION (JAN 1998)-ALTERNATE I
L.10. WBR 1452.215-82 TECHNICAL PROPOSAL INSTRUCTIONS--BUREAU OF RECLAMATION (APR 2001)
L.11. WBR 1452.215-83 PRICING PROPOSAL INSTRUCTIONS--BUREAU OF RECLAMATION (JAN 1998)
L.12. FACSIMILE ACKNOWLEDGMENT OF AMENDMENTS, MODIFICATIONS TO OFFERS, AND WITHDRAWALS OF OFFERS-BUREAU OF RECLAMATION--PN REGION (APR 2007)
L.13. NOTICE OF INTENT TO INCORPORATE CONTRACTOR'S TECHNICAL PROPOSAL - BUREAU OF RECLAMATION - PN REGION (MAR 2001)
L.14. 52.216-1 TYPE OF CONTRACT (APR 1984)
L.15. NOTICE TO HUBZONE SMALL BUSINESS CONCERN OF A PRICE EVALUATION ADJUSTMENT - BUREAU OF RECLAMATION - PN REGION (APR 2001)
L.16. 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)
L.17. 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
L.18. NON-DISCRIMINATION NOTICE TO U.S. DEPARTMENT OF THE INTERIOR CONTRACTORS, SUBCONTRACTORS, AND LESSORS -- BUREAU OF RECLAMATION -- PN REGION (JAN 2000)
L.19. 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)
L.20. INVOICING PROJECTION INFORMATION -- PACIFIC NORTHWEST REGION (MAR 2000)
L.21. 52.233-2 SERVICE OF PROTEST (SEPT 2006) (DEVIATION)
L.22. 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)
L.23. 52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997)
L.24. WBR 1452.236-86 INSTRUCTION FOR MOBILIZATION AND PREPARATORY WORK SCHEDULE LINE ITEM -- MULTIPLE SCHEDULES -- BUREAU OF RECLAMATION (JUNE 2002)
L.25. 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
SECTION M EVALUATION FACTORS FOR AWARD
M.1. WBR WBR 1452.215-85 EVALUATION FACTORS FOR AWARD - QUALITY PREDOMINANCE--BUREAU OF RECLAMATION (MAY 2005)
M.2. WBR 1452.225-80 EVALUATION FACTOR -- COST OF FOREIGN INSPECTION SERVICE--BUREAU OF RECLAMATION (MAY 2000)
M.3. WBR 1452.225-82 NOTICE OF WORLD TRADE ORGANIZATION GOVERNMENT PROCUREMENT AGREEMENT EVALUATIONS--BUREAU OF RECLAMATION (MAY 2005)

File details come from the government source that posted it. Updated .