Amend_0006.pdf
PDF 107 KB Posted
- Attached to
- z--Inman Powerplant Unit 8 & 9 Turbine Overhaul
- Solicitation number
- R14PS00485
About this file
Amendment 0006
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
R14PS00485
x x
7 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Boise ID 83706-1234 1150 N. Curtis Road, Ste. 100
R10
Acquisition Management Division Regional Office Pacific Northwest Region Bureau of Reclamation
12/23/2014000006
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
11/04/2014
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. Project Title: Allen E. Inman Powerplant Unit 8 and Unit 9 Turbine Overhaul, Minidoka
Project, Idaho
B. The time and date for receipt of offers remains at 2:00 pm, Mountain Time, January 22, 2015.
C. Acknowledgment: See block 11 above regarding how to acknowledge this amendment. The acknowledgment must be received at the place designated for receipt of offers (see block 8 of "Solicitation, Offer and Award" Standard Form 1442). ALL AMENDMENTS MUST BE
ACKNOWLEDGED. However, offerors are notified that acknowledgement of either amendment 0002 or 00003 is acceptable (offerors need only acknowledge one or the other of these 2
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Rebecca L. Thomson
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
R14PS00485/000006
amendments and not both).
D. Offer Modification: See block 11 above if you have submitted your offer and now desire to modify or withdraw it.
E. Third Party: If you have given your copy of the solicitation to someone else, please forward this amendment accordingly.
F. NOTE: The following changes are hereby incorporated into the solicitation. Single-sided replacement pages are provided following this
Standard Form 30 and changes are shown with left side bar or shaded. Offerors who¿ve prepared
2-sided copies of the solicitation may wish to attach the one-sided revised pages to the original version in order to preserve the reverse side of the original page.
G. In Section C, Description/Specifications/Statement of Work, the following pages are deleted and the attached revised pages are substituted therefore:
Remove Pages Insert Revised Pages
48 13 32-2 48 13 32-2
Attachment
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Solicitation No.R14PS00485 Allen E. Inman Powerplant Unit 8 and Unit 9 Turbine Overhaul
Amendment No. 006
Revised 48 13 32 - 2
6. ASTM A967/A967M-13 Chemical Passivation Treatments for Stainless Steel Parts
7. ASTM B111/B111M-11 Copper and Copper-Alloy Seamless Condenser Tubes and Ferrule Stock
8. ASTM D6439-11 Cleaning, Flushing, and Purification of Steam, Gas and Hydroelectric Turbine Lubrication Systems
D. American Welding Society (AWS)
1. AWS D1.1/D1.1M-10 Structural Welding Code – Steel
E. National Electrical Manufacturers Association (NEMA)
1. NEMA 250-2008 Enclosures for Electrical Equipment (1000 Volts Maximum)
2. NEMA ICS 5-2000(2008) Industrial Control and Systems General Requirements
3. NEMA MG 1-2011 Motors and Generators
1.03 SYSTEM DESCRIPTION
A. Background:
1. Bearing oil pumping unit is located on floor El. 4161.15 below the wicket gates which leak excessively which makes it difficult to maintain equipment.
2. Original Bearing Oil Pumping Unit: 300 gallons.
3. Current bearing oil pumping unit footprint is approximently 73 inches by 58 inches. Currently the governor oil pumping unit and bearing oil pumping units are connected and share oil.
4. Motors:
a. 1 AC motor 3 hp, 3-phase, 60-hertz, 460 volts, 1800 rpm.
b. 1 DC motor 3 hp, 125 volts, 1750 rpm.
5. Pumps: Quantity 2, 22 gallons per minute.
B. Requirements:
1. Design and furnish new bearing oil pumping unit.
2. Design in accordance with ASME BPVC-VIII.
3. Threads and fasteners shall conform to ASME B1.1.
4. Fittings from a single manufacture.
5. Fittings, devices, and products manufactures shall match the governor oil pumping unit, see Section 48 13 31 – Governor Oil Pumping Unit.
File details come from the government source that posted it. Updated .