(x)

R14PS00485

x x

7 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Boise ID 83706-1234 1150 N. Curtis Road, Ste. 100

R10

Acquisition Management Division Regional Office Pacific Northwest Region Bureau of Reclamation

01/13/2015000009

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

11/04/2014

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

A. Project Title: Allen E. Inman Powerplant Unit 8 and Unit 9 Turbine Overhaul, Minidoka

Project, Idaho

B. The time and date for receipt of offers remains at 2:00 pm, Mountain Time, January 22, 2015.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Rebecca L. Thomson

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation R14PS00485 Allen E. Inman Powerplant Unit 8 and Unit 9 Turbine Overhaul

Amendment 009

C. Acknowledgment: See block 11 above regarding how to acknowledge this amendment. The acknowledgment must be received at the place designated for receipt of offers (see block 8 of "Solicitation, Offer and Award" Standard Form 1442). ALL AMENDMENTS MUST BE ACKNOWLEDGED. However, offerors are notified that acknowledgement of either amendment 0002 or 00003 is acceptable (offerors need only acknowledge one or the other of these 2 amendments and not both).

D. Offer Modification: See block 11 above if you have submitted your offer and now desire to modify or withdraw it.

E. Third Party: If you have given your copy of the solicitation to someone else, please forward this amendment accordingly.

NOTE: The following changes are hereby incorporated into the solicitation. Single-sided replacement pages are provided following this Standard Form 30 and changes are shown with left side bar or shaded. Offerors who’ve prepared 2-sided copies of the solicitation may wish to attach the one-sided revised pages to the original version in order to preserve the reverse side of the original page.

F. In Section B, Continuation of Section B – Supplies or Services and Prices/Costs, amendment 008 included a revised pages B-3 (should be B-4) and B-7 (should be B-5), these pages were numbered incorrectly and B-7 was incorrect. The following pages are deleted and the attached revised pages are substituted therefore:

Remove Pages Insert Revised Pages B-2 B-2 B-3 B-3 B-5 B-5

G. In Section C, Description/Specifications/Statement of Work, the following pages are deleted and the attached revised pages are substituted therefore:

Remove Pages Insert Revised Pages 48 13 31-1 48 13 31-1 48 13 31-3 48 13 31-3 48 13 31-6 48 13 31-6 48 13 31-11 48 13 31-11 48 13 31-13 and -14 48 13 31-13 and -14 48 13 32-1 and -2 48 13 32-1 and -2 48 13 32-6 48 13 32-6 48 13 32-11 48 13 32-11 48 13 32-13 48 13 32-13

Attachments

Solicitation No.R14PS00485

Amendment No. 009

CONTINUATION OF SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

(Revised) B-2

BASE SCHEDULE 1 – First Outage

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

1-6 48 13 04 Disassembly For the lump sum of $

1-7 48 13 07 Reassembly and Alignment

For the lump sum of $

1-8 48 13 08 Commissioning For the lump sum of $

1-9 48 13 09 Critical Connection Fasteners

For the lump sum of $

1-10 48 13 10 Kaplan Turbine Runner For the lump sum of $

1-11 48 13 11 Turbine Shaft For the lump sum of $

1-12 48 13 15 Mechanical Seals For the lump sum of $

1-13 48 13 16 Turbine Guide/Thrust Bearing

For the lump sum of $

1-14 48 13 17 Generator Guide Bearings For the lump sum of $

1-15 48 13 20 Outer Gate Barrel For the lump sum of $

1-16 48 13 21 Inner Gate Barrel For the lump sum of $

1-17 48 13 24 Inner Barrel Extension For the lump sum of $

1-18 48 13 25 Wicket Gates For the lump sum of $

1-19 48 13 26 Wicket Gate Levers and Links

For the lump sum of $

1-20 48 13 28 Bushings For the lump sum of $

1-21 48 13 29 Operating Ring For the lump sum of $

1-22 48 13 30 Wicket Gate Servomotor For the lump sum of $

1-23 48 13 31 Governor Oil Pumping Unit

For the lump sum of $

1-24 48 13 32 Bearing Oil Pumping Unit For the lump sum of $

1-25 48 13 43 Brake Assembly For the lump sum of $

1-26 48 13 55 Digital –Electronic Governor

For the lump sum of $

TOTAL FOR BASE SCHEDULE 1 ............................................................... $__________

B-3

OPTIONAL SCHEDULE 1A – Optional Items for First Outage

CLIN Section Supplies or Services Quantity and Unit Unit Price

Amount

1A-1 48 13 10 Hone runner blade servomotor cylinder

For the lump sum of $

1A-2 48 13 10 Machine and Chrome runner blade servomotor piston rod

For the lump sum of $

1A-3 48 13 16 Rebabbitt and machine turbine thrust shoes

For the lump sum of $

1A-4 48 13 16 Rebabbitt and machine turbine counter thrust shoes

For the lump sum of $

1A-5 48 13 16 Rebabbitt and machine turbine guide bearing

For the lump sum of $

1A-6 48 13 17 Rebabbitt Upstream Guide Bearing

For the lump sum of $

1A-7 48 13 17 Rebabbitt Downstream Guide Bearing

For the lump sum of $

1A-8 48 13 17 Refurbish Generator Shaft Journals

For the lump sum of $

1A-9 48 13 30 Hone Wicket Gate Servomotor Cylinder Bore

For the lump sum of $

1A-10 48 13 30 Machine and Chrome Wicket Gate Servomotor Piston Rod

TOTAL FOR OPTIONAL SCHEDULE 1A .................................................. $__________

B-5

BASE SCHEDULE 2 – for Second Outage

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

2-22 48 13 30 Wicket Gate Servomotor For the lump sum of $

2-23 48 13 31 Governor Oil Pumping Unit

For the lump sum of $

2-24 48 13 32 Bearing Oil Pumping Unit

For the lump sum of $

2-25 48 13 43 Brake Assembly For the lump sum of $

2-26 48 13 55 Digital –Electronic Governor

TOTAL FOR BASE SCHEDULE 2 ............................................................ $_________

OPTIONAL SCHEDULE 2A – Optional Items for Second Outage

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

2A-1 48 13 10 Hone runner blade servomotor cylinder

For the lump sum of $

2A-2 48 13 10 Machine and Chrome runner blade servomotor piston rod

For the lump sum of $

2A-3 48 13 16 Rebabbitt and machine turbine thrust shoes

For the lump sum of $

2A-4 48 13 16 Rebabbitt and machine turbine counter thrust shoes

For the lump sum of $

2A-5 48 13 16 Rebabbitt and machine turbine guide bearing

For the lump sum of $

2A-6 48 13 17 Rebabbitt Upstream Guide Bearing

For the lump sum of $

2A-7 48 13 17 Rebabbitt Downstream Guide Bearing

For the lump sum of $

2A-8 48 13 17 Refurbish Generator Shaft Journals

Revised 48 13 31 - 1

SECTION 48 13 31

GOVERNOR OIL PUMPING UNIT

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Governor Oil Pumping Unit:

1. Payment: Lump sum prices offered in Schedules1 and 2.

1.02 REFERENCE STANDARDS

A. American Society of Mechanical Engineers (ASME)

1. ASME BPVC-V-2013 Boiler and Pressure Vessel Code - Section V - Nondestructive Examination

2. DELETED

3. ASME BPVC-IX-2013 Boiler and Pressure Vessel Code – Section IX – Welding, Brazing, and Fusing Qualifications

4. ASME B1.1-2003(2008) Unified Inch Screw Threads, UN and UNR Thread Form

5. ASME B1.20.1-1983 Pipe Threads, General Purpose, Inch

6. ASME B40.100-2013 Pressure Gauges and Gauge Attachments

B. American Society for Nondestructive Testing (ASNT)

1. ASNT SNT-TC-1A-2011 Qualification of Nondestructive Testing Personnel

C. ASTM International (ASTM)

1. ASTM A27/A27M-10 Steel Castings, Carbon, for General Application

2. ASTM A182/A182M-13a Forged or Rolled Alloy and Stainless Steel Pipe Flanges, Forges Fittings, and Valves and Parts for High-Temperature Service

3. ASTM A312/A312M-13b Seamless, Welded, and Heavily Cold Worked Austenitic Stainless Steel Pipes

4. ASTM A380/A380M-13 Cleaning, Descaling, and Passivation of Stainless Steel Parts, Equipment, and Systems

5. DELETED

48 13 31 - 3

d. Relief valve setting: 1,050 psig.

e. Turbine start:900 psig.

f. Lag pump start: 950 psig.

g. Lag pump stop: 1000 psig.

B. Requirements:

1. Design and furnish new governor oil pumping unit.

2. DELETED

3. Threads and fasteners shall conform to ASME B1.1.

4. Fittings from a single manufacture.

5. Fittings, devices, and products manufactures shall match the bearing oil pumping unit, see Section 48 13 32 – Bearing Oil Pumping Unit.

6. Fittings in accordance to ASME B1.20.1.

7. Install both the bearing and governor oil pumping units in 10-foot 6-inch by 5-foot by 7-foot tall space shown on marked up informational drawings 17-D-2201 and 17-D-2202.

8. New location may require other components to be relocated.

9. Design to pump to oil storage tanks located on El. 4189.25 in the South-East Corner.

10. Replace and move all remaining gauges and instruments from back wall below wicket gates to opposite wall, as approved by COR.

11. Accumulator tanks will remain on floor El. 4161.15.

12. Bearing oil pumping unit will remain on floor El. 4161.15.

13. Isolate governor oil pumping unit and bearing oil pumping unit sumps.

14. Governor oil pumping unit equipment shall be of a type having an established reputation for satisfactory and reliable service.

15. Two-motor driven pumps, pressure tanks, sump tank, oil piping, double the quantity of oil required to fill accumulator tanks, and parts and accessories required to make a complete unit for regulating the speed and controlling the gate and blade opening of the turbine.

16. Electrial power supplied to the pumping unit shall be 480 VAC, three phase, 60-hertz.

17. Provide wicket gate position control valve.

18. Provide runner blade control valve.

19. Velocity of oil in the piping between actuator and servomotors: maximum 15 feet per second.

48 13 31 - 6

v. Red running indicating light.

vi. One Normally Open and One Normally Closed contactor auxiliary contact.

vii. Located in a NEMA 4 enclosure mounted on or near the pumping units.

e) Duplex filter with directional valve.

7) Drain and filling connections:

a) Filling connection shall have a valve controlling the inflow located within the cabinet and discharge above the oil level.

b) Drain connection at bottom of sump, 2-inch lockable valve.

8) Heaters:

a) Ambient temperature around the Governor and powerplant could be as low as 32 degrees Fahrenheit (0 degrees Celsius).

b) Provide heaters to prevent condensation forming and water mixing with the oil.

c) Size and locate heaters to keep homogenous oil temperature.

d) Immersion type heaters.

e) Suitable to operate on a 480-volt nominal circuit.

f) A thermostat and a combination magnetic starter with unfused disconnect switch shall be provided to control heaters.

i. 120-volt control starter.

ii. 480/120-volt transformer with one secondary fuse shall be provided in the starter enclosure.

iii. Equip starter with overload elements in all three phases.

iv. Located in a NEMA 4 enclosure mounted on or near the pumping units.

g) Add an adjustable temperature switch to monitor the oil temperature and provide a high temperature alarm and shutdown to the unit control system.

c. Equip breather connection on oil sump with a metallic-type oil vapor filter.

d. Test for leaks before painting.

31. Oil Pumps:

a. Pump requirements:

1) Provide two duplicate motor-driven oil pumps.

2) DELETED

48 13 31 - 11

1) Splicing of wires is not permitted.

2) Connections in terminal blocks.

3) Provide terminal blocks in accessible locations within the cabinet.

d. Wiring: formed neatly into flat or rectangular groups and shall be supported properly.

1) At a minimum of 10 percent extra terminals shall be provided in each group.

C. NDE welds by PT.

D. Shop Erection and Tests:

1. Assemble governor and auxiliary equipment completely assembled in the shop and tested.

2. Test sump for leaks prior to painting.

3. Set applicable valves, switches, and other equipment as much as practicable in the shop.

E. Unit Stresses:

1. General:

a. Factors of safety and adequate shock-absorbing features shall be used throughout the designs and especially in the design of all parts subject to stresses or shock, including alternating- and vibrating-type stresses and shock.

b. Shock-absorbing features include provisions which prevent components from loosening.

c. DELETED

2. DELETED

48 13 31 - 13

B. Non-destructive Examination Personnel:

1. Qualified in accordance with applicable method of the ASNT SNT-TC-1A or

ASME BPVC-V.

1.06 SHIPMENT, STORAGE, AND HANDLING

A. Prevent damage to governor oil system during loading, unloading, and storage.

B. Protect from corrosion, deformation, and other types of damage.

C. Securely plugged or tightly covered plugs to prevent the governor system from having any internal contamination during transportation.

1. This includes inlets, outlets, drain holes and any other port holes.

D. Protect surfaces as necessary to preserve the finish and against contaminants.

E. Protect equipment with adequate cradles to prevent damage.

PART 2 PRODUCTS

2.01 MATERIALS

A. Commercially available pumps and motors.

B. Commercially available gauges.

C. Pressure switches, temperature switches, and level switches: Manufactured by Barksdale Incorporated.

1. Contain required number of electrically-separate contacts having ample current-carrying and interrupting capacity for the intended application but in no case shall rating be less than the rating required by NEMA ICS 5 designation P600 for contacts used in direct current circuits or A600 for contacts used in alternating current circuits.

D. Oil:

1. Hydraulic Grade ISO VG 68.

E. Sump Tank:

1. Plate Steel

F. Seamless Piping:

1. ASTM A312 Grade 316L, standard schedule.

G. Fittings and Other Connections:

48 13 31 - 14

1. ASTM A182 Grade 316L.

H. RTD:

1. 100ohm, 3 wire, Dual Element platinum.

2.02 FABRICATION

A. Design and Fabrication: Unless otherwise provided, welded parts shall conform to the following requirements:

1. DELETED

2. DELETED.

B. Welding:

1. For welding purposes, the oil sump and its associated equipment shall be considered as a pressure vessel.

2. Full penetration major stress carrying welds.

3. Butt Welds:

a. Full penetration.

b. Examine 100 percent by UT methods.

4. Fully examine other welds by PT or MT methods.

C. Paint in accordance with Section 09 96 20 – Coatings.

PART 3 EXECUTION

3.01 INSTALLATION

A. Oil Pumps and Motors:

1. Install new oil pumping units in 10-foot 6-inch by 5-foot by 7-foot tall space shown on marked up informational drawings 17-D-2201 and 17-D-2202.

2. New location may require other components to be relocated.

48 13 32 - 1

SECTION 48 13 32

BEARING OIL PUMPING UNIT

PART 1 GENERAL

1.01 PAYMENT

A. Bearing Oil Pumping Unit:

1. Payment: Lump sum prices offered in Schedules 1 and 2.

1.02 REFERENCE STANDARDS

A. American Society of Mechanical Engineers (ASME)

1. ASME BPVC-V-2013 Boiler and Pressure Vessel Code - Section V - Nondestructive Examination

2. DELETED

3. ASME BPVC-IX-2013 Boiler and Pressure Vessel Code – Section IX – Welding, Brazing, and Fusing Qualifications

4. ASME B1.1-2003(2008) Unified Inch Screw Threads, UN and UNR Thread Form

5. ASME B1.20.1-1983 Pipe Threads, General Purpose, Inch

6. ASME B40.100-2013 Pressure Gauges and Gauge Attachments

B. American Society for Nondestructive Testing (ASNT)

1. ASNT SNT-TC-1A-2011 Qualification of Nondestructive Testing Personnel

C. ASTM International (ASTM)

1. ASTM A27/A27M-10 Steel Castings, Carbon, for General Application

2. ASTM A182/A182M-13a Forged or Rolled Alloy and Stainless Steel Pipe Flanges, Forges Fittings, and Valves and Parts for High-Temperature Service

3. ASTM A312/A312M-13b Seamless, Welded, and Heavily Cold Worked Austenitic Stainless Steel Pipes

4. ASTM A380/A380M-13 Cleaning, Descaling, and Passivation of Stainless Steel Parts, Equipment, and Systems

5. DELETED

48 13 32 - 2

6. ASTM A967/A967M-13 Chemical Passivation Treatments for Stainless Steel Parts

7. ASTM B111/B111M-11 Copper and Copper-Alloy Seamless Condenser Tubes and Ferrule Stock

8. ASTM D6439-11 Cleaning, Flushing, and Purification of Steam, Gas and Hydroelectric Turbine Lubrication Systems

D. American Welding Society (AWS)

1. AWS D1.1/D1.1M-10 Structural Welding Code – Steel

E. National Electrical Manufacturers Association (NEMA)

1. NEMA 250-2008 Enclosures for Electrical Equipment (1000 Volts Maximum)

2. NEMA ICS 5-2000(2008) Industrial Control and Systems General Requirements

3. NEMA MG 1-2011 Motors and Generators

1.03 SYSTEM DESCRIPTION

A. Background:

1. Bearing oil pumping unit is located on floor El. 4161.15 below the wicket gates which leak excessively which makes it difficult to maintain equipment.

2. Original Bearing Oil Pumping Unit: 300 gallons.

3. Current bearing oil pumping unit footprint is approximently 73 inches by 58 inches. Currently the governor oil pumping unit and bearing oil pumping units are connected and share oil.

4. Motors:

a. 1 AC motor 3 hp, 3-phase, 60-hertz, 460 volts, 1800 rpm.

b. 1 DC motor 3 hp, 125 volts, 1750 rpm.

5. Pumps: Quantity 2, 22 gallons per minute.

B. Requirements:

1. Design and furnish new bearing oil pumping unit.

2. DELETED

3. Threads and fasteners shall conform to ASME B1.1.

4. Fittings from a single manufacture.

5. Fittings, devices, and products manufactures shall match the governor oil pumping unit, see Section 48 13 31 – Governor Oil Pumping Unit.

48 13 32 - 6

e) Suitable to operate on a 480-volt circuit.

f) Thermostat and a combination magnetic starter with unfused disconnect switch shall be provided to control the heaters.

i. 120-volt control starter.

ii. 480/120-volt transformer with one secondary fuse shall be provided in the starter enclosure.

iii. Equip starter with overload elements in all three phases.

iv. Located in a NEMA 4 enclosure mounted on or near the pumping units.

g) Add an adjustable temperature switch to monitor the oil temperature and provide a high temperature alarm and shutdown to the unit control system.

c. Equip breather connection on the oil sump with a metallic-type oil vapor filter.

d. Test for leaks before painting.

26. Bearing Oil Pumps:

a. Pump requirements:

1) Provide two motor-driven oil pumps.

a) Primary pump driven by AC motor.

b) Backup pump driven by DC motor.

2) Each pump shall be self-priming.

b. Motor requirements:

1) Conform to NEMA MG1, including characteristics, tests and ratings unless otherwise specified.

2) One motor for each pump.

3) AC motor:

a) Premium efficiency, squirrel-cage induction type.

b) Direct connected and rated 460 volts, 3-phase, 60 cycles.

4) DC motor: 125 VDC, wound field type.

5) Coordinate with the pump to match the characteristic requirements, torque requirements to provide proper operation of the unit during sequence starting, acceleration, and normal running.

6) Indoor service, totally enclosed fan closed (TFEC) drip-proof type enclosure.

48 13 32 - 11

b. Shock-absorbing features include provisions which prevent components from loosening.

c. DELETED

d. Furnish design calculations and complete information as to the maximum unit stresses used in the design.

2. DELETED

3. DELETED

1.04 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 48 13 32-1, Drawings:

1. Detailed drawings of bearing oil pumping unit including associated equipment , fabrication details, and finished weight.

2. Location drawing for bearing oil pumping unit inclucding piping schematics.

3. Inspection test plan.

4. Manufacturing schedule.

5. Schematic and wiring diagrams for motor staters and all control components.

6. Cable schedule.

C. RSN 48 13 321-2, Material Certification:

1. Material certification.

2. Data sheets for commercially available components.

D. RSN 48 13 32-3, Inspection Report:

48 13 32 - 13

B. Commercially available gauges.

C. Pressure switches, temperature switches, and level switches:

1. Contain required number of electrically-separate contacts having ample current-carrying and interrupting capacity for the intended application but in no case shall rating be less than the rating required by NEMA ICS 5 designation P600 for contacts used in direct current circuits or A600 for contacts used in alternating current circuits.

D. Oil:

1. ISO VG 68.

E. Sump Tank:

1. Plate Steel.

F. Seamless Piping:

1. ASTM A312 Grade 316L, standard schedule.

G. Fittings and Other Connections:

1. ASTM A182 Grade 316L.

2.02 FABRICATION

A. Design and Fabrication: Unless otherwise provided, welded parts shall conform to the following requirements:

1. DELETED

B. Welding:

1. For welding purposes the oil sump and its associated equipment shall be considered as a pressure vessel.

2. Full penetration.

3. Butt Welds:

a. Full penetration.