(x)

R14PS00485

x x

7 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Boise ID 83706-1234 1150 N. Curtis Road, Ste. 100

R10

Acquisition Management Division Regional Office Pacific Northwest Region Bureau of Reclamation

01/08/2015000008

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

11/04/2014

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

A. Project Title: Allen E. Inman Powerplant Unit 8 and Unit 9 Turbine Overhaul, Minidoka

Project, Idaho

B. The time and date for receipt of offers remains at 2:00 pm, Mountain Time, January 22, 2015.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Rebecca L. Thomson

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation R14PS00485 Allen E. Inman Powerplant Unit 8 and Unit 9 Turbine Overhaul

Amendment 008

C. Acknowledgment: See block 11 above regarding how to acknowledge this amendment. The acknowledgment must be received at the place designated for receipt of offers (see block 8 of "Solicitation, Offer and Award" Standard Form 1442). ALL AMENDMENTS MUST BE ACKNOWLEDGED. However, offerors are notified that acknowledgement of either amendment 0002 or 00003 is acceptable (offerors need only acknowledge one or the other of these 2 amendments and not both).

D. Offer Modification: See block 11 above if you have submitted your offer and now desire to modify or withdraw it.

E. Third Party: If you have given your copy of the solicitation to someone else, please forward this amendment accordingly.

NOTE: The following changes are hereby incorporated into the solicitation. Single-sided replacement pages are provided following this Standard Form 30 and changes are shown with left side bar or shaded. Offerors who’ve prepared 2-sided copies of the solicitation may wish to attach the one-sided revised pages to the original version in order to preserve the reverse side of the original page.

F. In Table of Contents, the following pages are deleted and the attached revised pages are substituted therefore:

Remove Pages Insert Revised Pages i i viii viii

G. In Section B, Supplies or Services and Price/Costs, the following pages are deleted and the attached revised pages are substituted therefore:

Remove Pages Insert Revised Pages B-4 B-4 B-7 B-7

H. In Section C, Description/Specifications/Statement of Work, the following pages are deleted and the attached revised pages are substituted therefore:

Remove Pages Insert Revised Pages 48 13 31-17 48 13 31-17

I. In Section I, Contract Clauses, the following page is deleted and the attached revised pages are substituted therefore:

Remove Page Insert Revised Pages I-159 I-159

J. In Section J, List of Documents, Exhibits, and Other Attachments, the following pages are deleted and the attached revised pages are substituted therefore:

Remove Page Insert Revised Pages J-1 J-1

General Wage Decision General Wage Decision ID140045, dated 6/27/2014 ID150045, dated Jnauary 2, 2015 (Pgs 1-5)

Attachments

Solicitation No. R14PS000485

Amendment 0008 i

PART I THE SCHEDULE

SECTION A SOLICITATION/CONTRACT FORM ..................................................................... A-1

SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS ...................................................B-1

SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK ........................... C-1

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 14 10 Use of Site 01 14 30 Outages 01 31 19 Project Management and Coordination 01 31 30 Internet Based Project Management Work Flow System 01 32 10 Construction Program 01 33 00 Submittals 01 35 10 Material Safety Data Sheets 01 35 20 Safety and Health 01 35 21 Removal from Work 01 35 22 First Aid 01 35 30 Contractor’s Onsite Safety Personnel 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 51 00 Temporary Utilities 01 54 20 Use of Government Crane 01 55 00 Vehicular Access and Parking 01 56 10 Protection of Existing Installations 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 60 00 Product Requirements 01 74 10 Cleaning and Waste Management 01 78 30 Project Record Documents

DIVISION 09 - COATINGS

09 96 20 Coatings

DIVISION 26 – ELECTRICAL

26 05 20 Conductors and Cables 26 05 33 Electrical Conduit and Cable Tray

DIVISION 48 - ELECTRICAL POWER GENERATION

48 13 03 Pre-Teardown Readings and Measurements 48 13 04 Disassembly

Amendment 0008 viii(Revised)

I.119. 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT

(FIXED-PRICE) (APR 2012)-ALTERNATE I (SEP 1996) ........................................ I-148

I.120. 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)................... I-152 I.121. 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984) ........................ I-153 I.122. 52.253-1 COMPUTER GENERATED FORMS (JAN 1991) ...................................... I-153

I.123. 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE

MAINTENANCE (NOV 2014) .................................................................................... I-153

I.124. 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED

DOMESTIC CORPORATIONS (DEC 2014) .............................................................. I-154

I.125. 52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC

2014) ............................................................................................................................. I-155

I.126. 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS

AND CERTIFICATIONS (DEC 2014) ........................................................................ I-159

PART III LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J LIST OF ATTACHMENTS ......................................................................................... J-1

PART IV REPRESENTATIONS AND INSTRUCTIONS

SECTION K REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS

OF OFFERORS OR RESPONDENTS ....................................................................... K-1

K.1. 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC

2014) ............................................................................................................................... K-1

K.2. 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL

2013) ............................................................................................................................... K-5

K.3. NOTICE TO HUBZONE SMALL BUSINESS CONCERNS REGARDING

WAIVER OF PRICE EVALUATION PREFERENCE ADJUSTMENT -

BUREAU OF RECLAMATION - PN REGION (APR 2001) ....................................... K-6

K.4. 52.204-17 OWNERSHIP OR CONTROL OF OFFEROR (NOV 2014) ....................... K-6

K.5. 52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC

CORPORATIONS-REPRESENTATION (DEC 2014) ................................................. K-7

SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR

RESPONDENTS ............................................................................................................L-1

L.1. 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA

INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND

COMMERCIAL ITEM DESCRIPTIONS, FPMR PART 101-29 (AUG 1998) ............. L-1

L.2. 52.211-3 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA

INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND

COMMERCIAL ITEM DESCRIPTIONS (JUN 1988) .................................................. L-1

L.3. 52.211-6 BRAND NAME OR EQUAL (AUG 1999) (DEVIATION) ........................... L-1

Solicitation No.R14PS00485

Amendment No. 008

(Revised) B-4

OPTIONAL SCHEDULE 1A – Optional Items for First Outage

CLIN Section Supplies or Services Quantity and Unit Unit Price

Amount

1A-1 48 13 10 Hone runner blade servomotor cylinder

For the lump sum of $

1A-2 48 13 10 Machine and Chrome runner blade servomotor piston rod

For the lump sum of $

1A-3 48 13 16 Rebabbitt and machine turbine thrust shoes

For the lump sum of $

1A-4 48 13 16 Rebabbitt and machine turbine counter thrust shoes

For the lump sum of $

1A-5 48 13 16 Rebabbitt and machine turbine guide bearing

For the lump sum of $

1A-6 48 13 17 Rebabbitt Upstream Guide Bearing

For the lump sum of $

1A-7 48 13 17 Rebabbitt Downstream Guide Bearing

For the lump sum of $

1A-8 48 13 17 Refurbish Generator Shaft Journals

For the lump sum of $

1A-9 48 13 30 Hone Wicket Gate Servomotor Cylinder Bore

For the lump sum of $

1A-10 48 13 30 Machine and Chrome Wicket Gate Servomotor Piston Rod

For the lump sum of $

TOTAL FOR OPTIONAL SCHEDULE 1A .................................................. $__________

(Revised) B-7

OPTIONAL SCHEDULE 2A – Optional Items for Second Outage

CLIN Section Supplies or Services Quantity and Unit Unit Price

Amount

2A-1 48 13 10 Hone runner blade servomotor cylinder

For the lump sum of $

2A-2 48 13 10 Machine and Chrome runner blade servomotor piston rod

For the lump sum of $

2A-3 48 13 16 Rebabbitt and machine turbine thrust shoes

For the lump sum of $

2A-4 48 13 16 Rebabbitt and machine turbine counter thrust shoes

For the lump sum of $

2A-5 48 13 16 Rebabbitt and machine turbine guide bearing

For the lump sum of $

2A-6 48 13 17 Rebabbitt Upstream Guide Bearing

For the lump sum of $

2A-7 48 13 17 Rebabbitt Downstream Guide Bearing

For the lump sum of $

2A-8 48 13 17 Refurbish Generator Shaft Journals

For the lump sum of $

2A-9 48 13 30 Hone Wicket Gate Servomotor Cylinder Bore

For the lump sum of $

2A-10 48 13 30 Machine and Chrome Wicket Gate Servomotor Piston Rod

For the lump sum of $

TOTAL FOR OPTIONAL SCHEDULE 2A ................................................... $___________

Revised 48 13 17 - 4

e. If bearings are acceptable for reuse, scrape and polish bearings to remove minor scoring and grooves.

f. Furnish and install new RTD’s.

3. Rebabbitting: (Optional)

a. Clean, etch, flux, tin, rebabbitt in accordance with American Babbitt industry standards and or DOD-STD-2188.

b. Statically or centrifugally cast Babbitt in accordance with industry standards.

c. Babbitt, ASTM B3.

d. Machine to original drawing dimensions.

e. VT, PT, and UT inspection of babbitt.

f. Penetrate (PT) testing of edge bonding.

g. Inspect the entire surface of the bearing lining of each shoe using pulsed reflection ultrasonic inspection techniques per DOD-STD-2183.

h. Minimum bonding requirements:

1) No single un-bonded area of Babbitt greater than 1-square inch.

2) Acceptable un-bonded areas spaced at least 4.0 inches apart.

3) No individual area of un-bond have a major dimension greater than 1-inch total un-bonded area of to not exceed 10 percent of the babbitted surface of each shoe.

i. Machining: Dimensions lacking tolerances shall be held to ASME B4.1 Grade 8 or better.

B. Generator Shaft Journals:

1. Inspection:

a. Visual inspection including as found dimensions check sheet.

b. Disposition report of shaft diameter at the bearing journal.

c. Inspect running and mating surfaces for flatness, wear or deterioration.

2. Rehabilitation (Optional):

a. Machine outside running surface parallel to the inside bearing bore within

0.001 inches.

b. Grind the journal surfaces to a 16 micro-inch surface finish or better.

PART 3 EXECUTION

Not Used

Amendment 0008

I-159(Revised)

(i) Antiretaliation. The Contractor shall not discharge or in any other manner discriminate against any worker because such worker has filed any complaint or instituted or caused to be instituted any proceeding under or related to compliance with the E.O. or this clause, or has testified or is about to testify in any such proceeding.

(j) Subcontractor compliance. The Contractor is responsible for subcontractor compliance with the requirements of this clause and may be held liable for unpaid wages due subcontractor workers.

(k) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (k) in all subcontracts, regardless of dollar value, that are subject to the Service Contract Labor Standards statute or the Wage Rate Requirements (Construction) statute, and are to be performed in whole or in part in the United States.

I.126. 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

Amendment 0008

J-1(Revised)

PART III LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J LIST OF ATTACHMENTS

1.Department of Labor, Wage Decision Number ID150045 Dates 01/02/2015 (Pages 1 thru 5)

2.Past Performance Questionnaire

3.Bid Bond

4.Drawings

WA Rate ID45.txt General Decision Number: ID150045 01/02/2015 ID45

Superseded General Decision Number: ID20140045

State: Idaho

Construction Type: Heavy HEAVY CONSTRUCTION, Including water and sewer line construction and heavy construction projects on treatment plants and industrial (power plants, manufacturing plants, processing plants, etc.) sites

County: Cassia County in Idaho.

Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/02/2015

* ELEC0449-004 06/01/2014

Rates Fringes

ELECTRICIAN......................$ 27.33 12.45

ENGI0370-034 01/01/2014

Rates Fringes

POWER EQUIPMENT OPERATOR:

Bulldozer, Scraper (over 80 yds to 100 yds)

GROUP 8....................$ 28.19 10.50

Drill (bit 8 in and over), Heavy Duty Mechanic, Scrapers (over 40 yds to 60 yds)

GROUP 7....................$ 27.96 10.50

Drilling (bit under 8in), Scraper (up to and including 40 yds)

GROUP 6....................$ 27.59 10.50

Roller

GROUP 3....................$ 26.94 10.50

Scraper (over 100 yds)

GROUP 10...................$ 28.67 10.50

ZONE PAY:

Zone 1 0 - 30 miles: free Zone 2 30 - 60 miles: $25.00/per day Zone 3 More than 60 miles: $30.00/per day.

If a project is located in more than one zone the lower zone rate shall apply

ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST

OFFICES:

BOISE: 304 N. 8TH STREET

TWIN FALLS: 253 2ND AVE. WEST

POCATELLO: CLARK STREET

IDAHO FALLS: 875 NORTH CAPITAL AVE.

BOOM PAY: All Cranes and Concrete Pump Boom Trucks 100 ft to 150 ft $.15 over scale 150 ft to 200 ft $.30 over scale Over 200 ft $.45 over scale

IRON0732-003 06/01/2013

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 26.00 17.70+a a: PAID HOLIDAYS: New Years Day, Memorial Day, July 4th, Labor Day, Veteran's DAy, Thanksgiving Day, Day following Thanksgiving, and Christmas Day.

LABO0155-008 01/01/2014

Rates Fringes

LABORER

Asphalt Including Raker, Shoveler, Spreader, and Distributor Group 3....................$ 25.23 11.45 Flagger Group 1....................$ 25.03 11.45

SUID2010-038 08/08/2012

Rates Fringes

CARPENTER (Form Work Only).......$ 28.00 0.00

CARPENTER, Excludes Form Work....$ 28.00 0.00

CEMENT MASON/CONCRETE FINISHER...$ 17.16 5.67

IRONWORKER, REINFORCING..........$ 27.22 16.70

LABORER: Common or General......$ 22.13 11.98

LABORER: Pipelayer..............$ 16.39 0.00

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 21.06 0.00

OPERATOR: Bobcat/Skid

Steer/Skid Loader................$ 17.00 0.00

OPERATOR: Concrete Batch Plant............................$ 24.94 11.96

OPERATOR: Crane.................$ 27.59 9.60

OPERATOR: Forklift..............$ 21.98 0.00

OPERATOR: Grader/Blade..........$ 25.17 9.44

OPERATOR: Loader (Front End)....$ 21.33 4.25

PAINTER: Roller and Spray.......$ 17.06 0.65

TRUCK DRIVER: Dump Truck........$ 17.11 0.00

TRUCK DRIVER: Lowboy Truck......$ 21.00 12.10

TRUCK DRIVER: Water Truck.......$ 23.89 9.52

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

�