R-7257 Long Beach Airport Gateway Sign Project - SPECS.pdf

PDF 19 MB Posted

Attached to
LONG BEACH AIRPORT GATEWAY SIGN (R-7257)
Solicitation number
AP-25-548
Issued by
California

About this file

Summary of Long Beach Airport Gateway Sign Project (R-7257)

This is a detailed project specification and bid package issued by the City of Long Beach Airport Department for the Long Beach Airport Gateway Sign construction project. The work consists primarily of removing existing landscaping and installing a new gateway sign approximately 12 feet high by 125 feet long near the intersection of N Lakewood Boulevard and E Spring Street, along with a concrete foundation, new electrical systems for lighting, irrigation, and new landscaping. A mandatory pre-bid conference is scheduled for January 7, 2025, at 10:00 a.m. via Microsoft Teams, with attendance required for bid eligibility. Bids will be accepted until 11:00 a.m. on February 4, 2025, through the City's online portal at https://longbeachbuys.com. The project specification documents include nine line items in the base bid, with item nine (Landscaping) set at an allowance of $25,000. The contractor must possess a combination of California Class A General Engineering Contractor's license and California C-10 Electrical Contractor's license at the time of award and throughout the contract duration. Bidders must demonstrate a minimum of two similar signage projects completed since January 1, 2017, and site examination is the bidder's responsibility, with no formal walkthrough provided by the City.

The project is subject to the City's Small Business Enterprise (SBE) Program with a stated goal of 9.65 percent, a Citywide Project Labor Agreement (PLA) applicable to projects exceeding $750,000 for non-street projects, prevailing wage rate requirements under California Labor Code Section 1720 et seq., and Department of Industrial Relations (DIR) compliance and monitoring. Bid security in the amount of at least 10 percent of the bid must be submitted with the electronic bid submission, with the original bid bond delivered to the City Clerk by the bid deadline. The selected contractor must execute a faithful performance bond and labor and materials bond each in an amount not less than 100 percent of the contract price within 15 calendar days of the Notice of Award. The project includes requirements for certified payroll submission, apprenticeship employment compliance, equal employment opportunity compliance, Equal Benefits Ordinance compliance, Iran Contracting Act compliance (for bids of $1,000,000 or more), and compliance with California's prevailing wage and public works requirements. The contract documents establish liquidated damages provisions, and the contractor shall remain responsible for all work-related losses and damage not covered by collectible commercial insurance, excluding losses caused by earthquake, flood, or City negligence.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Long Beach Working Together to Serve

Long Beach Airport

LONG BEACH AIRPORT GATEWAY SIGN

in the City of Long Beach

Contract Documents Plans and Specifications

R-7257 3701010013

December 2024

Airport Department Long Beach, California

MANDATORY PRE-BID CONFERENCE:

JANUARY 7, 2025, at 10:00 A.M.

VIRTUAL MEETING VIA MS TEAMS

(see Division A – Notice Inviting Bids)

THIS PAGE INTENTIONALLY LEFT BLANK

C I T Y O F L O N G B E A C H

PLANS AND SPECIFICATIONS No. R-7257

FOR

LONG BEACH AIRPORT GATEWAY SIGN

IN THE CITY OF LONG BEACH

For:

Airport Department City of Long Beach

4100 E. Donald Douglas Dr.

Long Beach, CA 90808 Phone: (562) 570-2607

Facsimile: (562) 570-2601

December 16 4

Marsha M. Yasuda, Deputy

LONG BEACH AIRPORT GATEWAY SIGN IN THE CITY OF LONG BEACH

Long Beach Airport Page i R-7257

City of Long Beach Table of Contents

CONTRACT DOCUMENTS

TABLE OF CONTENTS

DIVISION A – NOTICE INVITING BIDS

Notice Inviting Bids

DIVISION B – INSTRUCTION TO BIDDERS

Instructions to Bidders

DIVISION C – BID DOCUMENTS

Bid Form Bidder Information / Signature Page Certification of Site Examination Contractor’s Minimum Qualifications and Experience Statement Bidders Statement on Previous Contracts Subject to EEO Clause List of Sub-Contractors Bidders Bond Non-collusion Declaration Debarment, Suspension, Ineligibility Certification Workers Compensation Certification Information to Comply with Labor Code Section 2810 Certification of Compliance with The Equal Benefits Ordinance Equal Benefits Ordinance Disclosure Form Certification of Nonsegregated Facilities Iran Contracting Act of 2010 Compliance Affidavit Small Business Enterprise (SBE) Program Forms

DIVISION D – POST-BID DOCUMENTS

Specimen Contract Bond for Faithful Performance Labor and Materials Bond Insurance Forms/Endorsement Forms Bid Protest Procedures

DIVISION E – FEDERAL, STATE AND LOCAL REQUIREMENTS

Federal: Not Used State: Not Used Local: Small Business Enterprise (SBE) Program Requirements Local: Equal Benefits Ordinance Statement Local: New PLA_Rev1 Local: Construction & Demolition Ordinance Local: City of Long Beach Standard Plans – Available at http://www.longbeach.gov/pw/resources/standard-plans/

DIVISION F – PERMITS AND ATTACHMENTS

Permit Information Geotechnical Engineering Report http://www.longbeach.gov/pw/resources/standard-plans/

Long Beach Airport Page ii R-7257

DIVISION G – BMP, BEST MANAGEMENT PRACTICES

DIVISION H – GENERAL REQUIREMENTS

Standard Specifications ............................................................................................... H-1 1-2 Definitions ................................................................................................... H-2 1-3 Abbreviations .............................................................................................. H-3 1-3.2 Common Usage ...................................................................................... H-3 1-4 Units of Measure ......................................................................................... H-5 Section 2 – Scope and Control of the Work ................................................................. H-5 2-3 Subcontracts ............................................................................................... H-5 2-4 Contract Bonds ........................................................................................... H-5 2-5 Plans and Specifications ............................................................................. H-5 2-5.3 Submittals ............................................................................................... H-5 2-5.4 Record Drawings .................................................................................... H-8 2-9 Surveying .................................................................................................... H-8 2-10 Authority of Board and Engineer ............................................................... H-9 2-13 Web Based Project Management Software ............................................ H-10 Section 3 – Changes in Work .................................................................................... H-11 3-2 Changes Initiated by the Agency .............................................................. H-11 3-3 Extra Work ................................................................................................ H-12 Section 4 – Control of Materials ................................................................................. H-13 4-1 Materials and Workmanship ...................................................................... H-13 Section 5 – Utilities .................................................................................................... H-14 5-1 Location .................................................................................................... H-14 5-3 Removals .................................................................................................. H-14 5-4 Relocation ................................................................................................. H-14 5-7 Unknown Facilities .................................................................................... H-15 5-8 Facilities Requiring Special Precautions ................................................... H-15

5-9 General Requirements When Working Around Long Beach Energy Resources ....................................................................................................... H-15

Section 6 – Prosecution, Progress, and Acceptance of the Work .............................. H-16 6-1 Construction Schedule .............................................................................. H-16 6-1.2 Commencement of Work ....................................................................... H-20 6-1.3 Preconstruction Conference ................................................................... H-21 6-1.4 Notices .................................................................................................. H-21 6-1.5 Bi-weekly Update Meetings .................................................................... H-22 6-7 Time of Completion ................................................................................... H-23 6-8 Completion, Acceptance, and Warranty .................................................... H-24 6-9 Liquidated Damages ................................................................................. H-24 6-11 Claims Resolution ................................................................................... H-25 Section 7 – Responsibilities of the Contractor ........................................................... H-29 7-1 The Contractor’s Equipment and Facilities ................................................ H-29 7-2 Labor ......................................................................................................... H-29 7-3 Liability and Worker’s Compensation Insurance ....................................... H-30 7-5 Permits ...................................................................................................... H-34 7-8 Work Site Maintenance ............................................................................. H-34

Long Beach Airport Page iii R-7257

7-9 Protection and Restoration of Existing Improvements .............................. H-37 7-15 Taxes ...................................................................................................... H-39 7-16 Indemnification ........................................................................................ H-40 Section 8 – Facilities for Agency Personnel ............................................................... H-42 Section 9 – Measurement and Payment .................................................................... H-42 9-3 Payment .................................................................................................... H-42

DIVISION I – TECHNICAL/CSI REQUIREMENTS

Section 01 11 00 – Summary of Work ......................................................................... I-1 Section 01 33 00 - Submittals ...................................................................................... I-3 Item C-105 Mobilization/Demobilization ....................................................................... I-5 Item C-102 Temporary Air and Water Pollution, Soil Erosion, and Siltation Control .. I-10 Item P-151 Clearing and Grubbing ............................................................................ I-16 Section 31 00 00 - Earthwork ..................................................................................... I-20 Section 02 41 13 – Selective/Site Demolition ............................................................ I-29 Section 10 14 00 – Signage ....................................................................................... I-34 Section 03 01 30 – Cast-in-Place Concrete ............................................................... I-48 Section 26 01 00 Electrical General Provisions ......................................................... I-75 Section 26 05 00 Basic Electrical Materials and Methods .......................................... I-87 Section 26 05 13 Conductors ..................................................................................... I-92 Section 26 05 26 Grounding ...................................................................................... I-99 Section 26 05 33 Raceways .................................................................................... I-103 Section 26 10 00 Electrical Distribution .................................................................... I-112 Section 26 50 00 Lighting ........................................................................................ I-118 Section 32 80 00 Irrigation System .......................................................................... I-123

DIVISION A

NOTICE INVITING BIDS

Long Beach Airport A-1 R-7257

City of Long Beach Division A – Notice Inviting Bids

DIVISION A

NOTICE INVITING BIDS

FOR

RECEIPT OF BIDS: Bids will be accepted on behalf of the City, Owner of the Work, until 11:00 a.m. on February 4, 2025, for the Long Beach Airport Gateway Sign, via the City’s online portal https://longbeachbuys.buyspeed.com/bso/ or https://longbeachbuys.com keyword R-7257.

MANDATORY ATTENDANCE AT ONLINE PRE-BID CONFERENCE: The City will conduct a mandatory pre-bid conference at 10:00 a.m. on January 7, 2025 to review bid submission processes, PLA, SBE, and Labor Compliance requirements and to present the scope of work to be performed under these specifications. The pre-bid conference will be conducted virtually via MS Teams.

• MS Teams Meeting Link: Join the meeting

• Meeting ID: 224 129 203 326

• Join by Phone: +1-213-279-1690

• Phone Conference ID: 106 058 433

Note: Meeting link for meeting is provided above – full URL for reference:

https://teams.microsoft.com/l/meetup-join/19%3ameeting_MzIxY2RmZTctNTU4OS00MTM1LWFhNjEtOTM5OTgwYTE2NGY4%40thread.v2/0?

context=%7b%22Tid%22%3a%22313f11c3-4268-4f6a-8d3b-c7e650183e78%22%2c%22Oid%22%3a%22b3d47fac-f9a6-4456-9b2e-cc673ec08410%22%7d

Attendance is mandatory at the pre-bid conference. Bidders that do not attend the meeting will have their bids disqualified.

WORK SITE WALK-THROUGH:

The Work Site located south of the intersection of N Lakewood Boulevard and E Spring Street as shown on the next page is open to the public; therefore, there will be no on-site job walk-through to be conducted by the City. Bidders may view the Work Site at any time at their own discretion. Bidders shall accept the conditions and necessary work regardless of whether the Bidder visited the Work Site. Bidders shall be responsible for inspecting the Work Site. Bidders shall be responsible to fully understand the requirements contained in the bid specifications prior to submitting a bid.

Bidders shall examine the locations, physical conditions and surroundings of the Work Site to determine the extent to which these factors will influence or affect performance of services. Failure to inspect the Work Site shall not relieve the Bidder from fulfilling the obligations of the Contract. The City shall assume that Bidders have investigated and are satisfied with the expected conditions and the requirements of these specifications.

https://longbeachbuys.buyspeed.com/bso/ https://longbeachbuys.com/ https://teams.microsoft.com/l/meetup-join/19%3ameeting_MzIxY2RmZTctNTU4OS00MTM1LWFhNjEtOTM5OTgwYTE2NGY4%40thread.v2/0?context=%7b%22Tid%22%3a%22313f11c3-4268-4f6a-8d3b-c7e650183e78%22%2c%22Oid%22%3a%22b3d47fac-f9a6-4456-9b2e-cc673ec08410%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_MzIxY2RmZTctNTU4OS00MTM1LWFhNjEtOTM5OTgwYTE2NGY4%40thread.v2/0?context=%7b%22Tid%22%3a%22313f11c3-4268-4f6a-8d3b-c7e650183e78%22%2c%22Oid%22%3a%22b3d47fac-f9a6-4456-9b2e-cc673ec08410%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_MzIxY2RmZTctNTU4OS00MTM1LWFhNjEtOTM5OTgwYTE2NGY4%40thread.v2/0?context=%7b%22Tid%22%3a%22313f11c3-4268-4f6a-8d3b-c7e650183e78%22%2c%22Oid%22%3a%22b3d47fac-f9a6-4456-9b2e-cc673ec08410%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_MzIxY2RmZTctNTU4OS00MTM1LWFhNjEtOTM5OTgwYTE2NGY4%40thread.v2/0?context=%7b%22Tid%22%3a%22313f11c3-4268-4f6a-8d3b-c7e650183e78%22%2c%22Oid%22%3a%22b3d47fac-f9a6-4456-9b2e-cc673ec08410%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_MzIxY2RmZTctNTU4OS00MTM1LWFhNjEtOTM5OTgwYTE2NGY4%40thread.v2/0?context=%7b%22Tid%22%3a%22313f11c3-4268-4f6a-8d3b-c7e650183e78%22%2c%22Oid%22%3a%22b3d47fac-f9a6-4456-9b2e-cc673ec08410%22%7d

Long Beach Airport A-2 R-7257

DESCRIPTION OF WORK: The Work to be done consists primarily of removal of existing landscaping, installation of new gateway sign approximately 12’ high by 125’ long near the intersection of N Lakewood and E Spring Street, installation of a concrete foundation for the sign, installation of new electrical for the lighting, new irrigation, and new landscaping.

CONTRACTOR'S LICENSE: The Contractor and subcontractor shall possess a combination of valid California Class A, General Engineering Contractor’s license and California C-10 Electrical Contractor’s License, at the time of the award and for the duration of the Work. The City may deem any Bidder who fails to possess the required licenses to be non-responsive.

MINIMUM QUALIFICATIONS: Please note that for this Work, minimum qualifications apply. Contractor’s Minimum Qualifications are described in Division C.

PROJECT LABOR AGREEMENT (PLA): This Work is covered by a Citywide PLA entered into by the City of Long Beach with the Los Angeles/Orange Counties Building and Construction Trades Council and the signatory Craft Unions. The PLA establishes the labor relations Policies and Procedures for the City, the Contractor and subcontractors awarded contracts for the Work and for the craft persons employed by

Long Beach Airport A-3 R-7257 the Contractor or subcontractor while engaged in the Work. See Division E for the applicable PLA.

PLANS AND SPECIFICATIONS: Plans and specifications are posted on the City’s website at the URL noted in “Receipt of Bids” above and available for free download, however, you must be registered (registration is free and may be accomplished at the same URL) and logged in to view or download the documents.

Although the City used to make available hard copies for purchase, this service is not being offered at this time. Project Plans and Specifications are available through download only from Long Beach Buys.

BID SECURITY: Bidders must scan and upload with their bid documents a certified check or bank draft payable to the City of Long Beach, drawn on a solvent bank in the United States of America, or a satisfactory bond in an amount not less than 10 percent of the Bid. The original of the above instrument shall be submitted to the City Clerk by mail in a sealed envelope and must be received and time/date stamped by the City Clerk’s Office no later than the time and date stated for receipt of bids. The outside of the envelope shall clearly state “Bid Security for R-7257 LONG BEACH AIRPORT GATEWAY SIGN. DO NOT OPEN WITH REGULAR MAIL.” The City Clerk’s Office is located at 411 W. Ocean Blvd, 1st Floor, Long Beach, CA 90802. Bidders may proceed to Window 12 without pulling a service ticket.

The bid security shall serve as a guarantee that the Bidder, if awarded the Contract, will execute and deliver to the City Engineer, no later than 15 calendar days after the date shown on the “Notice of Award,” the following items:

1. The Contract for doing the work, and

2. A corporate surety bond in favor of the City of Long Beach in an amount not less than 100 percent of the Contract price for the faithful performance of the Contract, and

3. A corporate surety bond in an amount not less than 100 percent of the Contract price for the payment of all labor and material claims, and

4. Evidence of required insurance coverage.

Failure to submit the items noted above when specified may result in the City, in its sole discretion, declaring the Bid Security forfeited and depositing same into the City Treasury.

The City will retain the Bid security accompanying all Bids until it awards the Contract.

The City will retain the Bid security submitted with the Bid of the Bidder to whom an award of Contract is made, and the Bid security of the next higher Bid, until the Contract between the Bidder to whom award of the Contract is made and the City has been executed.

RETENTION: In the event the contract to be awarded hereunder, including Specifications and other documents incorporated therein by reference, provides for the withholding of monies by the City to ensure performance of such contract, the Contractor may: a) deposit with the City as a substitute for said monies, securities listed

Long Beach Airport A-4 R-7257 in Section 16430 of the California Government Code or bank or savings and loan certificates of deposit, or both, equivalent to the amount withheld; or b), request payment of retentions earned directly to the escrow agent at the expense of the contractor, provided Contractor requests, in writing, to make such substitution within 5 days of the date of the Notice of Award of the Contract and bears all expenses in connection therewith. Either option shall be in accordance with Public Contract Code Section 22300.

CALIFORNIA WAGE RATE REQUIREMENTS: This project is a public work under Labor Code § 1720 et seq. Pursuant to Division 2, Part 7, Chapter 1 of the Labor Code of the State of California, the Director of Public Works of the City by and on behalf of the City Council has obtained from the Director of the Department of Industrial Relations of the State of California the general prevailing rate of per diem wages, and the general prevailing rate of holiday and overtime work in the locality in which the public work is to be performed for each craft, classification or type of workers needed to perform the Work. Copies of prevailing rate of per diem wages are on file in the office of the City Engineer, 5th floor, City Hall, 411 West Ocean Boulevard, Long Beach, California 90802, and shall be made available upon request. Copies may also be obtained on the California Department of Industrial Relations website http://www.dir.ca.gov/dlsr. This project will be subject to the 2024-2 prevailing wage rate, as determined by the Director of the Department of Industrial Relations for the State of California. The Contractor to whom the Contract is awarded, and its subcontractors is directed to pay not less than the general rate of per diem wages for each craft, classification, or type of worker needed to execute the contract. Contractor is required to post a copy of the determination of the director of the prevailing rate of per diem wages at each job site.

Contractors are required to pay at least the California minimum wage for the basic hourly rate in all cases where the published prevailing wage rate is below the California minimum wage. Any and all employer payments required by the prevailing wage determinations must also be paid. If the California minimum wage is increased in the future to an amount above that shown in the prevailing wage determination, the basic hourly rate in that determination automatically increases to the new minimum wage.

DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) COMPLIANCE: This project is subject to the following: No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section

1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Contractors are further cautioned that certified payrolls shall be submitted electronically directly to the Department of Industrial Relations.

http://www.dir.ca.gov/dlsr

Long Beach Airport A-5 R-7257

CERTIFIED PAYROLL SUBMISSION TO THE CITY OF LONG BEACH: Pursuant to the provisions of Labor Code Section 1776, Contractor shall keep and shall cause each subcontractor performing any portion of the work under this Contract to keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by Contractor or subcontractor in connection with the work. Such payroll records for Contractor and all subcontractors shall be certified and shall be available for inspection at all reasonable hours at the principal office of Contractor pursuant to the provisions of Section 1776 of the Labor Code. Contractor's failure to furnish such records to City or City’s authorized Labor Compliance representative in the manner provided herein for notices shall entitle City to withhold the penalty prescribed by law from progress payments due to Contractor.

Each contractor and every subcontractor and supplier shall be required to submit certified payrolls and labor compliance documentation electronically at the discretion of and the manner specified by the City of Long Beach. Electronic submittal will be a web-based system, accessed on the World Wide Web by a web browser. Each contractor and subcontractor will be given a Log On identification and password to access the City of Long Beach reporting system. The foregoing is in addition to, and not in lieu of, any other requirements or obligations established and imposed by any department of the City with regard to submission and retention of certified payroll records for Contractor and subcontractors.

APPRENTICESHIP EMPLOYMENT: The Contractor shall comply with Section 1777.5 of the Labor Code concerning the employment of apprentices by the Contractor or any subcontractor under the Contractor and, by submitting a Bid and executing the Contract, the Contractor stipulates that it shall so comply. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs.

PENALTIES: Contractor and subcontractors are subject to penalties, including, but not limited to, under Labor Code §§ 1775, 1776, 1777.7 and 1813, for failure to comply with Sections 13.28 through 13.31 and/or Labor Code § 1720 et seq.

(SEAL) /s/ MONIQUE DE LA GARZA

CITY CLERK, CITY OF LONG BEACH, CALIFORNIA

/s/ THOMAS B. MODICA

DATE CITY MANAGER

DIVISION B

INSTRUCTION TO BIDDERS

Long Beach Airport B-1 R-7257

City of Long Beach Division B – Instruction to Bidders

DIVISION B

INSTRUCTIONS TO BIDDERS

Please read these instructions carefully. If you do not submit a complete Bid, the City may determine that your Bid is non-responsive, in which case the City will reject your Bid.

ATTENDANCE AT PRE-BID MEETING: Bidders are strongly encouraged to send an individual who is responsible for the bid, and not a runner. Bid submission processes and how to access the bidding system will be discussed at the pre-bid meeting.

SUBMISSION OF BID: The bid shall be submitted online at https://longbeachbuys.com or https://longbeachbuys.buyspeed.com/bso/ at keyword R-7257. Bidders must be registered on the City’s portal to access the bidding page and to download the plans and specifications. All documents to be submitted with the bid are contained in Division C of this Specification (collectively “Electronic Bid Forms”); these documents shall be scanned and uploaded via the City’s secure online bidding system. Entry of bid amounts will be accomplished electronically. Bids prices submitted on a paper bid form will not be accepted.

The originals of the Bidder’s Bond, and any other document which may require notarization, must be placed in a sealed envelope, clearly marked on the outside with

“R-7257 LONG BEACH AIRPORT GATEWAY SIGN PROJECT, DO NOT OPEN WITH

REGULAR MAIL,” and these originals must be received by the City Clerk at the address shown in the Notice Inviting Bids by the time and date stated therein. These originals may be mailed or sent via package delivery service to City of Long Beach, 411 W. Ocean Blvd., Attn: City Clerk, Long Beach, CA 90802 but the City is not responsible for lost or misdirected mail. The City Clerk’s time-stamp clock is the official time for receipt of documents.

SMALL BUSINESS ENTERPRISE (SBE) PROGRAM: Bidders are advised that this work is subject to the requirements of the City’s SBE Program. Bidders must meet the goal or submit with their bid evidence of a good faith effort to do so. See Divisions C and E of Specifications.

PROJECT LABOR AGREEMENT (PLA): This Work is covered by a Citywide Project Labor Agreement (PLA) entered into by the City of Long Beach with the Los Angeles/Orange Counties Building and Construction Trades Council and the signatory Craft Unions. The PLA establishes the labor relations Policies and Procedures for the City, the Contractor and subcontractors awarded contracts for the Work and for the craft persons employed by the Contractor or subcontractor while engaged in the Work.

The work covered by this Agreement shall be limited to any and all demolition, construction and rehabilitation work pursuant to prime multi-trade and specialty contracts and all subcontracts, of whatever tier, entered into by the City that exceed $750,000 for non-street/right of way projects and $1,000,000 for street/right of way projects.

https://longbeachbuys.com/ https://longbeachbuys.buyspeed.com/bso/

Long Beach Airport B-2 R-7257

The goal of the PLA is to provide that the Work bring full employment and economic benefit to the City and its residents. With the PLA, the parties have established a framework for fair wages, hours and working conditions through which these goals may be achieved, and which will permit the utilization of the most modern, efficient and effective procedures for construction, assure a sufficient supply of skilled craft persons, and reduce or eliminate the causes of disruptions or interference with the Work.

The PLA contains a local hiring goal of 40%, calculated based on total hours worked.

The local hire provision requires best efforts to utilize qualified workers residing in first tier zip codes (which include all of the City of Long Beach), then in second tier zip codes (which reflect the Gateway Cities), and finally in Los Angeles and Orange Counties. In addition, there is a provision with a goal of 10% to hire Transitional Workers and Veterans. Where Project Work is funded in full or in part by State of California Tideland funds, the term Local Resident, as used herein, shall mean an individual whose primary place residence is within the Counties of Los Angeles or Orange. The City of Long Beach will utilize a PLA Administrator who will work with the contractors, residents, Long Beach City College, Pacific Gateway, and the Trades to oversee the provisions of the Agreement. Additionally, the general contractor will be required to hire a "Jobs Coordinator" to provide additional outreach efforts connecting Long Beach residents to job opportunities. The term Jobs Coordinator means an independent third-party individual, entity, or employee with whom the prime contractor enters into a contract or employs to facilitate implementation of the targeted hiring requirements of the PLA.

This Work will provide many opportunities for local residents and local small business enterprises to participate. It is the City’s policy that contractors will cooperate with all efforts of the City, the PLA Administrator, the Jobs Coordinator (if applicable), and other organizations retained by the City to encourage and assist in the participation of local residents and local small businesses in the Work.

Contractor will be required to sign a Letter of Assent to acknowledge and agree to comply with all provisions of the PLA. See Division E of the specifications for the applicable PLA and Letter of Assent

EXAMINATION OF SITE AND WORK: Each Bidder must fully inform itself of the conditions relating to the Work and the employment of labor for the Work. A Contractor’s failure to do so will not relieve it of the obligation to furnish all material and labor necessary to complete the Work.

TIME FOR COMPLETION: See Division H, Section 6-7.

CONTACT: Before the Bid opening, prospective Bidders shall direct any communications regarding this Work to:

2nd Floor Administration Office 4100 E. Donald Douglas Drive Long Beach CA 90808 Attention: Sokunthea Kol E-mail: sokunthea.kol@longbeach.gov

Long Beach Airport B-3 R-7257

In accordance with the Americans with Disabilities Act of 1990 (ADA), the information contained in this Notice and in the Plans and Specifications is available in an alternative format by written request to Airport Department at the above address or by telephoning

(562) 570-2639.

Communications may be written or oral, but the City is not bound by any oral interpretation of the Contract Documents made by any City employee, nor does the City guarantee the accurate transcription of oral questions. The last day to submit questions is by 4:00 p.m. on Tuesday, January 14, 2025.

PROPRIETARY INFORMATION: Responses to the Notice Inviting Bids becomes the exclusive property of the City of Long Beach. All Bids submitted in response to the Notice Inviting Bids are a matter of public record and shall be regarded as public records. Exceptions will be those elements in each Bid that are defined by the Bidder as business or trade secrets and are marked as “Trade Secrets,” “Confidential,” or “Proprietary.”

The City shall not be liable or responsible in any way for disclosure of any records not marked as “Trade Secrets,” “Confidential,” or “Proprietary.” The City shall not be liable or responsible in any way for disclosure of any records so marked if disclosure is deemed to be required by law or by a court order.

BIDS SHALL REMAIN OPEN: The Bidder shall guarantee the Total Bid Price for 90 working days after the Bid opening.

INTERPRETATION AND MISUNDERSTANDINGS OF PLANS AND DOCUMENTS:

Bidders may submit to the Engineer written requests for interpretation or correction of the Plans, Specifications, or other Contract Documents. Bidders shall not make such requests later than 10 working days prior to the date of Bid opening. Bidders submitting such requests are responsible for their timely delivery. The Engineer will interpret or correct the Contract Documents only by a written Addendum, and such Addenda will be posted to the web address noted in Division A. The City is not bound by any oral interpretation of the Contract Documents made by any City employee.

If Bidder fails to raise any issue regarding such interpretation or correction or if the Engineer fails to respond to a request, Bidder will be deemed to have accepted all risks associated with that issue. Bidder specifically waives the right to request a Change Order, equitable adjustment, or to request additional time, or to seek recovery in quantum merit in conjunction with any such issue. Bidder further waives the right to assert arguments of estoppel or implied or express warranty of design with regards to any such issue.

ITEM EQUIVALENCY: Any Bidder desiring to bid an "approved equal" item shall submit a request to do so to the Engineer in writing no later than 10 working days prior to the date of the Bid opening. The request shall include all data necessary to substantiate that the item is equal. The Engineer will notify the Bidder, in writing, of approval or disapproval of the proposed item no later than 3 working days prior to the date of the Bid opening. Submit written approvals with your Bid.

Long Beach Airport B-4 R-7257

EQUAL EMPLOYMENT OPPORTUNITY: The City of Long Beach is an equal opportunity employer and requires all Bidders to comply with policies and regulations concerning equal employment opportunity.

IRAN CONTRACTING ACT: In accordance with California Public Contracting Code Section 2200-2208, all bidders submitting proposals for, entering into, or renewing contracts with the City and estimated at $1,000,000 or more are required to complete, sign and submit the “Iran Contracting Act of 2010 Compliance Affidavit” contained in Division C.

TAXES: Bidders shall not mention Sales Tax, Use Tax, or any other tax in their Bids.

All Bid amounts will be deemed to include such taxes.

BID PREPARATION: The unit prices for each Bid Item shall be properly entered electronically in the online Bid Schedule as directed above and in Division A. Bidders shall complete all items of the Bid. If the Bidder fails to enter a unit price and enters only an item total, then the City will divide the item total by the estimated quantity to arrive at a unit price, and the Bidder shall be bound by that unit price. If the unit price is less than one cent, Bidders shall include the proper number of zeros.

Bidders shall not modify the Bid in any way. The City will not consider substitutions except as described in “Item Equivalency”.

Bidders shall provide a Bid for the base Bid as directed by instructions on the Bid Document.

The electronic bidding system will total the amount bid. The TOTAL AMOUNT BID is informational only and may be used by the City for comparison in determining the apparent low Bid at the time of Bid opening. The sum of the mathematically correct extended totals for each item under the ITEM TOTAL column shall be deemed the Bidder’s intended Bid. Any errors shall, at the option of the City, constitute grounds for the City’s rejection of the Bid.

Bidders are cautioned that the electronic bidding system will cease allowing entry at the time stated for bid opening, regardless of when entry was begun. Bidders are reminded to begin bid submission with sufficient time to complete the entries.

The City will not consider oral, telephonic, fax, or paper Bids.

Bidders shall sign the Bid properly, in longhand.

The City will not consider any Bid that does not meet these requirements.

LISTING SUBCONTRACTORS: Submit the list of subcontractors on this Project that is required by the Subletting and Subcontracting Fair Practices Act (Public Contract Code Section 4100, et. seq.). Failure to list a subcontractor for an item of work at time of bid is an acknowledgement that the bidder will perform such work with its own forces.

ADDENDA ACKNOWLEDGEMENT: All Addenda issued before the time Bids are due shall form a part of the Contract Documents. It is the Bidders’ responsibility to determine what Addenda are issued. Bidders may do so by accessing the website

Long Beach Airport B-5 R-7257 shown in Division A. The City may deem any Bid that fails to acknowledge all Addenda to be non-responsive. Bidders must acknowledge the Addenda in writing on the form “Addenda Acknowledgement / Signature” in Division C.

BID SECURITY: Bidders shall include with their Bids in the manner described above the security shown in the Notice Inviting Bids. The City will reject any Bid not accompanied by such Bid security.

DELIVERY OF BID: Bidders shall input their bids online via the City’s bidding portal.

No paper bids will be accepted.

WITHDRAWAL OF BIDS: Bidders may withdraw their Bids before the time set for the Bid opening in the Notice Inviting Bids. Bidders may not withdraw their Bids after that time without forfeiture of the Bid security. Withdrawal of the Bid will not prejudice any Bidder’s right to submit a new Bid if there is time to do so.

LATE BIDS: The City will reject, and the bidding system will not allow, any Bid received after the time set for the Bid opening whether or not the Bids are opened exactly at the time set in the Notice Inviting Bids

TELEPHONES: The City does not provide telephones for use by Bidders.

BID OPENING: All Bids timely received will be subject to further evaluation with respect to:

• The responsiveness of the Bid

• Determination that Bidder is responsible

AWARD OF CONTRACT AND OWNER’S RIGHTS RESERVED: If the City awards the Contract, it will award the Contract to the lowest responsible Bidder as determined solely by the City. The City Engineer reserves the right to reject any or all Bids, and, to the extent not prohibited by law, to waive any minor irregularity or informality in any Bid that does not give the Bidder a competitive advantage over other Bidders and to take the Bids under advisement for the Bid guarantee period shown above, as may be necessary in the best interests of the City. The City reserves the right to request clarification of any bid term from Bidders.

End of Division B - Instructions to Bidders

DIVISION C

BID DOCUMENTS

NOTE: ALL DOCUMENTS IN DIVISION C

MUST BE RETURNED WITH BID SUBMITTAL

Long Beach Airport C-1 R-7257 City of Long Beach Division C – Bid Documents

BIDDER'S NAME: ______________________

BID TO THE CITY OF LONG BEACH

In the City of Long Beach

In accordance with the Notice Inviting Bids for this Work in the City of Long Beach, California, to be opened on February 4, 2025 at 11:00 a.m., we offer to furnish all necessary labor, tools, materials, appliances and equipment for and perform all Work mentioned in the Notice Inviting Bids, in full compliance with Plans & Specifications No.

R-7257 at the prices listed below.

We certify that we have examined the site and that the Bid is complete. By signing the Bid, we certify that the Contractor will not submit a claim based on failure to examine the site thoroughly.

BASE BID – LONG BEACH AIRPORT GATEWAY SIGN

ITEM

NO.

ITEM DESCRIPTION

ESTIMATED

QUANTITY

UNIT

UNIT PRICE

(IN

FIGURES)

ITEM TOTAL

(IN FIGURES)

1.

C-105:

Mobilization/Demobilization (Limited to 6% of Base Bid)

1 LS

Input

Electronically Calculated online

2.

C-102: Temporary Air and Water Pollution, Soil Erosion and Siltation Control

1 LS

Input

Electronically Calculated online

3. Selective/Site Demolition 1 LS Input

Electronically Calculated online

4.

Procurement and Installation of Gateway Sign

1 LS

Input

Electronically Calculated online

5. Gateway Sign Foundation 1 LS Input

Electronically Calculated online

6. Electrical for Sign Power 1 LS Input

Electronically Calculated online

7.

Gateway Sign Lighting System

1 LS

Input

Electronically Calculated online

8. Irrigation System 1 LS Input

Electronically Calculated online

9. Landscaping 1 ALLOW $25,000 $25,000

TOTAL BASE BID (Items 1-9) $Calculated online

Long Beach Airport C-2 R-7257

We understand that these quantities are estimates only and are given solely for the purpose of facilitating the comparison of Bids, and that the Contractor’s compensation will be computed on the basis of the actual quantities in the completed Work.

BIDS ARE TO BE SUBMITTED ELECTRONICALLY AS DESCRIBED IN DIVISION B.

Long Beach Airport C-3 R-7257

ADDENDA ACKNOWLEDGEMENT / SIGNATURE

This Bid is submitted with respect to the changes to the Plans & Specifications included in the following addenda numbers:

1 2 3 4 5 6 7 (Initial above all appropriate numbers)

Respectfully submitted, Signature** Legal Name of Company

Print Name / Title

Names of Other General Partners

Names of Other Partners State of Incorporation

State Where Registered as LLC City of Long Beach Business License

Number

Business Address (Actual Address -Not a City of Long Beach Business License Post Office Box) Expiration Date

Telephone Number / Fax Number Address on City Business License

Email Address

Contractor’s License Number

________ If Bidder is an individual, set forth his/her signature.

________ If Bidder is a joint venture, set forth the name of the joint venture with the signature of an authorized representative of each venture.

________ If Bidder is a general partnership, set forth the signature of the general partner.

________ If Bidder is a limited partnership, provide names of other partners.

________ If Bidder is a limited liability company, set forth legal name of company with signature of a member or manager authorized to bind the company.

________ If the Bidder is a corporation set forth the legal name of the corporation with the signature of an officer of the corporation.

Long Beach Airport C-4 R-7257

The following information will be used for statistical analysis only.

Is the Bidder a Minority-Owned Business? ______ Which racial minority? __________ Is the Bidder a Women-Owned Business? _______

Where did your company first hear about this City of Long Beach Airport project?_____

Long Beach Airport R-7257 City of Long Beach CERTIFICATION OF SITE EXAMINATION

CITY OF LONG BEACH

CERTIFICATION OF SITE EXAMINATION

Each Bidder shall fully inform itself of the conditions relating to the Work and the employment of labor on the Work. Failure to do so will not relieve the Contractor of the obligation to furnish all materials and labor necessary to comply with the Contract Documents.

Each Bidder shall examine the Work site. Bidders shall attend a mandatory pre-bid inspection, conducted by the City, as specified in the Notice Inviting Bids. Failure to attend the mandatory pre-bid inspection shall be cause for the City to reject the Bid.

I certify that I have examined the site and the Bid is complete. On behalf of the

Contractor, I certify that the Contractor will not submit a claim based on failure to examine the site thoroughly.

Date of Site Examination Contractor

Printed Name of Contractor’s Representative

Signature of Representative

Date

Long Beach Airport Page-1 R-7257

City of Long Beach CONTRACTOR QUALIFICATIONS

CONTRACTOR’S MINIMUM QUALIFICATIONS

AND EXPERIENCE STATEMENT

IN THE CITY OF LONG BEACH

The Work is located on a very active airport and the Contractor shall be required to coordinate the Contractor’s activities with multiple airport tenants. Typical airport operations include terminal construction, commercial airlines, cargo aircraft, general aviation, military aircraft, student pilots, helicopter traffic, and corporate aircraft. Support activities that routinely occur on the Airport include, but are not limited to, fire protection equipment, safety vehicles, fueling, baggage handling, and other construction projects.

This Work requires conformance with the specifications for construction at airports.

The specifications are generally more stringent than typical local agency specifications.

The City has established minimum qualifications and experience requirements for the Contractor. Each bidder shall submit a “Contractor’s Minimum Qualifications and Experience Statement”. The statement shall be completed on the following form. The statement shall be included with the Bid and failure to include the statement with the Bid shall render the Bid non-responsive. Failure to submit complete and accurate statements of experience shall render the Bid non-responsive. Submission of inaccurate or misleading information on the statements of experience shall render the Bid non-responsive.

The experience of the listed subcontractor may have been obtained while in the role of prime contractor, while subcontracting to the Contractor, or while subcontracting to any other contractor. The Contractor shall clearly indicate the company/firm that performed the previous work for which experience is claimed and the role in which the previous work was performed (prime contractor or subcontractor).

Long Beach Airport Page-2 R-7257

CONTRACTOR EXPERIENCE

The Contractor or subcontractor shall have documented experience in signage work for commercial projects similar in scale and complexity those required for this project.

Installer must be approved by manufacturer/fabricator with documented experience installing for commercial projects similar in scale, complexity, and quality comparable to those indicated for this project. The Contractor or subcontractor listed to meet the experience requirement shall have completed two (2) similar projects, in size and scope, in accordance with the respective specifications since January 1, 2017, prior to the deadline for submission of bids.

C O

N T

R A

C T

O R

E X

P E

R

IE

N

E

P R

O J

E C

T

Project Title:

Start Date & Substantial Completion Date:

Type of Work:

Airport/ Facility Name:

Sponsor (Owner) Name:

Sponsor Address:

Sponsor City, State, Zip

Sponsor Telephone Number:

Sponsor Representative:

Company/Firm that performed the Work:

Work performed as: ____Prime Contractor _____Subcontractor

Name of Prime Contractor:

Prime Contractor Telephone Number:

Prime Contractor Representative:

Total Contract Amount:

Signage Portion Contract Amount

Long Beach Airport Page-3 R-7257

CONTRACTOR EXPERIENCE

N T

R A

C T

O R

E X

P E

R

IE

N

P R

O J

E C

T

Project Title:

Start Date & Substantial Completion Date:

Type of Work:

Airport/Facility Name:

Sponsor (Owner) Name:

Sponsor Address:

Sponsor City, State, Zip

Sponsor Telephone Number:

Sponsor Representative:

Company/Firm that performed the Work:

Work performed as: ____Prime Contractor _____Subcontractor

Name of Prime Contractor:

Prime Contractor Telephone Number:

Prime Contractor Representative:

Total Contract Amount:

Signage Portion Contract Amount:

Long Beach Airport Page-4 R-7257

NOTE: Failure to complete all portions of this form may render the Bidder’s Bid as non-responsive and subject to rejection.

Signature Date

Name and Title of Signing Officer

Company Name

Business Address

Telephone Fax

BIDDER’S STATEMENT ON PREVIOUS CONTRACTS

SUBJECT TO EEO CLAUSE

The Bidder shall complete the following statement by checking the appropriate blanks:

The Bidder has ___________ has not___________ participated in a previous contract subject to the equal opportunity clause prescribed by Executive Order 11246, as amended, of September 24, 1965.

The Bidder has__________ has not__________ submitted all compliance reports in connection with any such contract due under the applicable filing requirements; and that representations indicating submission of required compliance reports signed by proposed subcontractors will be obtained prior to award of subcontracts.

If Bidder has participated in a previous contract subject to the equal opportunity clause and has not submitted compliance reports due under applicable filing requirements, the Bidder shall submit a compliance report on Standard Form 100, “Employee Information Report EEO-I” prior to award of the contract (*).

NOTE: Failure to complete the blanks may be grounds for rejecting the bid.

(Name and Title of Signer)

Signature Date

Company Name

Business Address

Long Beach Airport

Rev 03/24/23

LIST OF SUBCONTRACTORS

In accordance with the requirements provided in the "Subletting and Subcontracting Fair Practices Act" Division 2 Part 1, Chapter 4 of the California Public Contract Code, the Bidder shall set forth hereon the name, the location of the place of business, Department of Industrial Relations registration number, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one half of 1 percent of the prime contractor's total bid or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one half of 1 percent of the prime contractor's total bid or ten thousand dollars ($10,000), whichever is greater. The prime contractor shall set forth thereon the portion of the work (type and dollar value) that will be done by each subcontractor. The prime contractor shall list only one subcontractor for each portion as defined by the prime contractor in his or her bid. Information requested, other than the sub contractor's name, location of business, contractor license number and the portion of work that will be done by each subcontractor may be submitted by the prime contractor within 24 hours after the deadline for submission of bids.

Name Type of Work

Address

City Dollar Value of Subcontract $

Phone No.

License No. DIR Registration No. ___________________________________

Name Type of Work

Address

City Dollar Value of Subcontract $

Phone No.

License No. DIR Registration No. ___________________________________

Name Type of Work

Address

City Dollar Value of Subcontract $

Phone No.

License No. DIR Registration No. ___________________________________

Name Type of Work

Address

City Dollar Value of Subcontract $

Phone No.

License No. DIR Registration No. ___________________________________

Name Type of Work

Address

City Dollar Value of Subcontract $

Phone No.

License No. DIR Registration No. __________________________________

City of Long Beach R-7257

Contractor directs the City’s attention to Continuous Bidder’s Bond (CBB) # CC-LM-C, on file in the office of the City Clerk of the City of Long Beach.