Division C Bid Documents Summary

This is a bid package for the City of Long Beach for the Long Beach Airport Gateway Sign project, solicitation number R-7257. The work involves procurement and installation of a gateway sign at Long Beach Airport, including site demolition, sign foundation, electrical power installation, lighting systems, irrigation systems, and landscaping. The project is divided into nine line items, with Item 9 (Landscaping) having an allowance of $25,000. The bid opening is scheduled for February 4, 2025 at 11:00 a.m. A mandatory pre-bid inspection was required, and the bidder, McAuliffe Construction, certified site examination on January 31, 2025. The contract is for the complete furnishing and installation of materials and labor in accordance with Plans & Specifications No. R-7257. All documents in Division C must be returned with the bid submittal, and bids are to be submitted electronically as described in Division B.

The base bid total is calculated online with most items requiring electronic input. McAuliffe Construction submitted a bid with a combined Long Beach Small Business Enterprise (LBSBE) goal of 9.65 percent, committing to subcontract with VSBE, LSBE, and SBE certified businesses including McM Concrete ($145,360), third floor north architectural signage ($12,000), Prime Electrical Contractor ($99,750), and Nolan Excavation ($40,302), totaling $297,412 in subcontracted work representing 30.4 percent of the $979,525 base bid. The bid includes a performance bond (ACC006005375) from Allegheny Casualty Company in the amount of ten percent of the aggregate bid, workers' compensation certification, and compliance with federal debarment, Equal Benefits Ordinance, and Iran Contracting Act requirements. Two subcontractors—TFN Architectural Signage, Inc. and third floor north architectural signage—were listed as having prior experience on the Long Beach Xchange project (2017-2018) and Santa Monica Business Park project (2024), respectively.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIVISION C

BID DOCUMENTS

NOTE: ALL DOCUMENTS IN DIVISION C

MUST BE RETURNED WITH BID SUBMITTAL

THIS PAGE INTENTIONALLY LEFT BLANK

Long Beach Airport C-1 R-7257 City of Long Beach Division C – Bid Documents

BIDDER'S NAME: ______________________

BID TO THE CITY OF LONG BEACH

LONG BEACH AIRPORT GATEWAY SIGN

In the City of Long Beach

In accordance with the Notice Inviting Bids for this Work in the City of Long Beach, California, to be opened on February 4, 2025 at 11:00 a.m., we offer to furnish all necessary labor, tools, materials, appliances and equipment for and perform all Work mentioned in the Notice Inviting Bids, in full compliance with Plans & Specifications No.

R-7257 at the prices listed below.

We certify that we have examined the site and that the Bid is complete. By signing the Bid, we certify that the Contractor will not submit a claim based on failure to examine the site thoroughly.

BASE BID – LONG BEACH AIRPORT GATEWAY SIGN

ITEM

NO.

ITEM DESCRIPTION

ESTIMATED

QUANTITY

UNIT

UNIT PRICE

(IN

FIGURES)

ITEM TOTAL

(IN FIGURES)

1.

C-105:

Mobilization/Demobilization (Limited to 6% of Base Bid)

1 LS

Input

Electronically Calculated online

2.

C-102: Temporary Air and Water Pollution, Soil Erosion and Siltation Control

1 LS

Input

Electronically Calculated online

3. Selective/Site Demolition 1 LS Input

Electronically Calculated online

4.

Procurement and Installation of Gateway Sign

1 LS

Input

Electronically Calculated online

5. Gateway Sign Foundation 1 LS Input

Electronically Calculated online

6. Electrical for Sign Power 1 LS Input

Electronically Calculated online

7.

Gateway Sign Lighting System

1 LS

Input

Electronically Calculated online

8. Irrigation System 1 LS Input

Electronically Calculated online

9. Landscaping 1 ALLOW $25,000 $25,000

TOTAL BASE BID (Items 1-9) $Calculated online

McAuliffe Construction

Input Online

Ismael Maldonado

Long Beach Airport C-2 R-7257

We understand that these quantities are estimates only and are given solely for the purpose of facilitating the comparison of Bids, and that the Contractor’s compensation will be computed on the basis of the actual quantities in the completed Work.

BIDS ARE TO BE SUBMITTED ELECTRONICALLY AS DESCRIBED IN DIVISION B.

Long Beach Airport C-3 R-7257

ADDENDA ACKNOWLEDGEMENT / SIGNATURE

This Bid is submitted with respect to the changes to the Plans & Specifications included in the following addenda numbers:

1 2 3 4 5 6 7 (Initial above all appropriate numbers)

Respectfully submitted, Signature** Legal Name of Company

Print Name / Title

Names of Other General Partners

Names of Other Partners State of Incorporation

State Where Registered as LLC City of Long Beach Business License

Number

Business Address (Actual Address -Not a City of Long Beach Business License Post Office Box) Expiration Date

Telephone Number / Fax Number Address on City Business License

Email Address

Contractor’s License Number

________ If Bidder is an individual, set forth his/her signature.

________ If Bidder is a joint venture, set forth the name of the joint venture with the signature of an authorized representative of each venture.

________ If Bidder is a general partnership, set forth the signature of the general partner.

________ If Bidder is a limited partnership, provide names of other partners.

________ If Bidder is a limited liability company, set forth legal name of company with signature of a member or manager authorized to bind the company.

________ If the Bidder is a corporation set forth the legal name of the corporation with the signature of an officer of the corporation.

DM DM - - - - -

Argo Engineering dba McAuliffe Construction

Daniel McAuliffe

CA

CA

28351 Agoura Road, Suite B Agoura Hills, CA 91301

TBD

TBD

TBD805-857-4974

danny@mcauliffeconstruction.com

X

1049734

Daniel E McAuliffe Jr, President

Long Beach Airport C-4 R-7257

The following information will be used for statistical analysis only.

Is the Bidder a Minority-Owned Business? ______ Which racial minority? __________ Is the Bidder a Women-Owned Business? _______

Where did your company first hear about this City of Long Beach Airport project?_____

NANA

NA

We are registered on Long Beach Buys and received the notification via email.

Long Beach Airport R-7257 City of Long Beach CERTIFICATION OF SITE EXAMINATION

CITY OF LONG BEACH

CERTIFICATION OF SITE EXAMINATION

Each Bidder shall fully inform itself of the conditions relating to the Work and the employment of labor on the Work. Failure to do so will not relieve the Contractor of the obligation to furnish all materials and labor necessary to comply with the Contract Documents.

Each Bidder shall examine the Work site. Bidders shall attend a mandatory pre-bid inspection, conducted by the City, as specified in the Notice Inviting Bids. Failure to attend the mandatory pre-bid inspection shall be cause for the City to reject the Bid.

I certify that I have examined the site and the Bid is complete. On behalf of the

Contractor, I certify that the Contractor will not submit a claim based on failure to examine the site thoroughly.

Date of Site Examination Contractor

Printed Name of Contractor’s Representative

Signature of Representative

Date

1/31/2025 McAuliffe Construction

Ismael Maldonado

1/31/2025

Long Beach Airport Page-1 R-7257

City of Long Beach CONTRACTOR QUALIFICATIONS

CONTRACTOR’S MINIMUM QUALIFICATIONS

AND EXPERIENCE STATEMENT

LONG BEACH AIRPORT GATEWAY SIGN

IN THE CITY OF LONG BEACH

The Work is located on a very active airport and the Contractor shall be required to coordinate the Contractor’s activities with multiple airport tenants. Typical airport operations include terminal construction, commercial airlines, cargo aircraft, general aviation, military aircraft, student pilots, helicopter traffic, and corporate aircraft. Support activities that routinely occur on the Airport include, but are not limited to, fire protection equipment, safety vehicles, fueling, baggage handling, and other construction projects.

This Work requires conformance with the specifications for construction at airports.

The specifications are generally more stringent than typical local agency specifications.

The City has established minimum qualifications and experience requirements for the Contractor. Each bidder shall submit a “Contractor’s Minimum Qualifications and Experience Statement”. The statement shall be completed on the following form. The statement shall be included with the Bid and failure to include the statement with the Bid shall render the Bid non-responsive. Failure to submit complete and accurate statements of experience shall render the Bid non-responsive. Submission of inaccurate or misleading information on the statements of experience shall render the Bid non-responsive.

The experience of the listed subcontractor may have been obtained while in the role of prime contractor, while subcontracting to the Contractor, or while subcontracting to any other contractor. The Contractor shall clearly indicate the company/firm that performed the previous work for which experience is claimed and the role in which the previous work was performed (prime contractor or subcontractor).

Long Beach Airport Page-2 R-7257

CONTRACTOR EXPERIENCE

The Contractor or subcontractor shall have documented experience in signage work for commercial projects similar in scale and complexity those required for this project.

Installer must be approved by manufacturer/fabricator with documented experience installing for commercial projects similar in scale, complexity, and quality comparable to those indicated for this project. The Contractor or subcontractor listed to meet the experience requirement shall have completed two (2) similar projects, in size and scope, in accordance with the respective specifications since January 1, 2017, prior to the deadline for submission of bids.

C O

N T

R A

C T

O R

E X

P E

R

IE

N

E

P R

O J

E C

T

Project Title:

Start Date & Substantial Completion Date:

Type of Work:

Airport/ Facility Name:

Sponsor (Owner) Name:

Sponsor Address:

Sponsor City, State, Zip

Sponsor Telephone Number:

Sponsor Representative:

Company/Firm that performed the Work:

Work performed as: ____Prime Contractor _____Subcontractor

Name of Prime Contractor:

Prime Contractor Telephone Number:

Prime Contractor Representative:

Total Contract Amount:

Signage Portion Contract Amount

Long Beach Xchange “LBX”

July 2017 June 2018 signage and wayfinding

N/A

Burnham USA Equities, Inc.

TFN Archictectural Signage, Inc.

X

1100 Newport Center Drive, Suite 200

Newport Beach, CA 92660

949-760-9150

Stephen Thorp

$1,100,000

N/A

N/A

N/A

Long Beach Airport Page-3 R-7257

CONTRACTOR EXPERIENCE

O

N T

R A

C T

O R

E X

P E

R

IE

N

E

P R

O J

E C

T

Project Title:

Start Date & Substantial Completion Date:

Type of Work:

Airport/Facility Name:

Sponsor (Owner) Name:

Sponsor Address:

Sponsor City, State, Zip

Sponsor Telephone Number:

Sponsor Representative:

Company/Firm that performed the Work:

Work performed as: ____Prime Contractor _____Subcontractor

Name of Prime Contractor:

Prime Contractor Telephone Number:

Prime Contractor Representative:

Total Contract Amount:

Signage Portion Contract Amount:

Santa Monica Business Park SMBP

Jan 2024 August 2024

Wayfinding and Exterior Signage

N/A

Del Amo Construction, Inc.

310-378-6203

Boston Properties BXP

2800 28th St, Ste 170

Santa Monica, CA 90405

TFN Architectural Signage, Inc.

X

Parker Cole

$406,610

N/A

424-330-3533

Kara Russell

Long Beach Airport Page-4 R-7257

NOTE: Failure to complete all portions of this form may render the Bidder’s Bid as non-responsive and subject to rejection.

Signature Date

Name and Title of Signing Officer

Company Name

Business Address

Telephone Fax

2/10/25

Daniel E McAuliffe Jr, President

McAuliffe Construction

28351 Agoura Rd, Suite B, Agoura Hills, CA 91301

(805) 664-8189

BIDDER’S STATEMENT ON PREVIOUS CONTRACTS

SUBJECT TO EEO CLAUSE

The Bidder shall complete the following statement by checking the appropriate blanks:

The Bidder has ___________ has not___________ participated in a previous contract subject to the equal opportunity clause prescribed by Executive Order 11246, as amended, of September 24, 1965.

The Bidder has__________ has not__________ submitted all compliance reports in connection with any such contract due under the applicable filing requirements; and that representations indicating submission of required compliance reports signed by proposed subcontractors will be obtained prior to award of subcontracts.

If Bidder has participated in a previous contract subject to the equal opportunity clause and has not submitted compliance reports due under applicable filing requirements, the Bidder shall submit a compliance report on Standard Form 100, “Employee Information Report EEO-I” prior to award of the contract (*).

NOTE: Failure to complete the blanks may be grounds for rejecting the bid.

(Name and Title of Signer)

Signature Date

Company Name

Business Address

Long Beach Airport City of Long Beach

R-7257

2/10/25

McAuliffe Construction

28351 Agoura Rd, Suite B, Agoura Hills, CA 91301

X

X

Daniel McAuliffe, President

Rev 03/24/23

LIST OF SUBCONTRACTORS

In accordance with the requirements provided in the "Subletting and Subcontracting Fair Practices Act" Division 2 Part 1, Chapter 4 of the California Public Contract Code, the Bidder shall set forth hereon the name, the location of the place of business, Department of Industrial Relations registration number, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one half of 1 percent of the prime contractor's total bid or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one half of 1 percent of the prime contractor's total bid or ten thousand dollars ($10,000), whichever is greater. The prime contractor shall set forth thereon the portion of the work (type and dollar value) that will be done by each subcontractor. The prime contractor shall list only one subcontractor for each portion as defined by the prime contractor in his or her bid. Information requested, other than the sub contractor's name, location of business, contractor license number and the portion of work that will be done by each subcontractor may be submitted by the prime contractor within 24 hours after the deadline for submission of bids.

Name Type of Work

Address

City Dollar Value of Subcontract $

Phone No.

License No. DIR Registration No. ___________________________________

Name Type of Work

Address

City Dollar Value of Subcontract $

Phone No.

License No. DIR Registration No. ___________________________________

Name Type of Work

Address

City Dollar Value of Subcontract $

Phone No.

License No. DIR Registration No. ___________________________________

Name Type of Work

Address

City Dollar Value of Subcontract $

Phone No.

License No. DIR Registration No. ___________________________________

Name Type of Work

Address

City Dollar Value of Subcontract $

Phone No.

License No. DIR Registration No. __________________________________

Long Beach Airport City of Long Beach R-7257

McM Concrete C8 Structural Concrete & Reinforcing

157,360

1130112 DIR website inoperable

28351 Agoura Rd

Agoura Hills

323.484.7435

656202 third floor north architectural signage

527 Fee Ana St

Placentia

714.556.0990

C45 Signage

282,604

DIR website inoperable

1050238

Prime Electrical Contractor

99,750

C10 Electrical

6053 Comstock Ave

Whittier

323.542.1748

Nolan Excavation

8502 E Chapman Ave

Orange

720.291.2453

945793

40,302

C12 Earthwork & Struct. Ex

DIR website inoperable

DIR website inoperable

NONCOLLUSION DECLARATION TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID

The undersigned declares:

I am the _______________ of __________________, the party making the foregoing bid.

The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on ________________________ [Date], at ________________________[City], ___________________ [State].

Revised 1-1-12 iaw SB944 R-7257

2/10/25

Agoura Hills California

President McAuliffe Construction

Rev 10-24-13

R-7257

2/10/25

President

WORKERS’ COMPENSATION CERTIFICATION

In accordance with California Labor Code Sections 1860 and 3700, I certify that I am aware of the provisions of Section 3700 which requires every employer to be insured against liability for worker’s compensation or to undertake self-insurance in accordance with said provisions before commencing the performance of the Work of this contract.

Contractor’s Name:

Signature of Contractor, or a corporate officer of Contractor, or a general partner of Contractor

Title: _______________________

Date: ______________________

Long Beach Airport City of Long Beach

R-7257

McAuliffe Construction

President

INFORMATION TO COMPLY WITH LABOR CODE SEC. 2810

To comply with Labor Code Sec. 2810, Contractor shall complete and submit this Information Sheet which shall be incorporated into and be a part of the Contract:

1)

A.

B.

C.

D.

2)

A.

B.

C.

D.

E.

3)

4)

5)

6)

7)

8)

Workers’ Compensation Insurance:

Policy Number: _ ________________________________

Name of Insurer (NOT Broker): _________________________________

Address of Insurer: __________________________________________

Telephone Number of Insurer: __________________________________

For vehicles owned by Contractor and used in performing work under this Contract:

VIN (Vehicle Identification Number): _ _________

Automobile Liability Insurance Policy Number: _ __________

Name of Insurer (NOT Broker): _________________________________

Address of Insurer: ___________________________________________

Telephone Number of Insurer: __________________________________

Address of Property used to house workers on this Contract, if any: __________

Estimated total number of workers to be employed on this Contract: __________

Estimated total wages to be paid those workers: __________________________

Dates (or schedule) when those wages will be paid: _______________________

(Describe schedule: For example, weekly or every other week or monthly)

Estimated total number of independent contractors to be used on this Contract:_

Taxpayer’s Identification Number: _ ________________________

Long Beach Airport City of Long Beach

R-7257

Technology Insurance Company Inc

59 Maiden Lane, New York, NY 10038

212-220-7120

Infinity Select Insurance Company

2201 4th Avenue North, Birmingham, AL 35203

(866) 860-9348

N/A

$400,000 weekly

CERTIFICATION OF COMPLIANCE WITH THE

EQUAL BENEFITS ORDINANCE

Section 1. CONTRACTOR/VENDOR INFORMATION

Name: _____________________________ Federal Tax ID No.: _ _

Address: ________________________________________________________

City:________________________________State: _______ZIP: ____________

Contact Person: ______________________Telephone: ___________________

Email: ______________________________Fax: ________________________

Section 2. COMPLIANCE QUESTIONS

A. The EBO is inapplicable to this Contract because the Contractor/Vendor has no employees. _____Yes _____No

B. Does your company provide (or make available at the employees’ expense) any employee benefits? _____Yes _____No

(If “yes,” proceed to Question C. If “no,” proceed to section 5, as the EBO does not apply to you.)

C. Does your company provide (or make available at the employees’ expense) any benefits to the spouse of an employee?

_____Yes _____No

D. Does your company provide (or make available at the employees’ expense) any benefits to the domestic partner of an employee?

______Yes _____No (If you answered “no” to both questions C and D, proceed to section 5, as the EBO is not applicable to this contract. If you answered “yes” to both Questions C and D, please continue to Question E. If you answered “yes” to Question C and “no” to Question D, please continue to section 3.)

E. Are the benefits that are available to the spouse of an employee identical to the benefits that are available to the domestic partner of an employee?

_____Yes ____No

(If “yes,” proceed to section 4, as you are in compliance with the EBO. If “no,” continue to section 3.)

Long Beach Airport City of Long Beach

R-7257

McAuliffe Construction 28351 Agoura Rd, Suite B

Agoura Hills CA 91301

Danny McAuliffe 805-664-8189 danny@mcauliffeconstruction.com N/A

X

X

X

Section 3. PROVISIONAL COMPLIANCE

A. Contractor/Vendor is not in compliance with the EBO now but will comply by the following date:

_____By the first effective date after the first open enrollment process following the contract start date, not to exceed two years, if the Contractor/Vendor submits evidence of taking reasonable measures to comply with the EBO;

or

_____At such time that the administrative steps can be taken to incorporate nondiscrimination in benefits in the Contractor/vendor’s infrastructure, not to exceed three months; or

_____Upon expiration of the contractor’s current collective bargaining agreement(s).

B. If you have taken all reasonable measures to comply with the EBO but are unable to do so, do you agree to provide employees with a cash equivalent? (The cash equivalent is the amount of money your company pays for spousal benefits that are unavailable for domestic partners.)

____Yes ____ No

Section 4. REQUIRED DOCUMENTATION

At time of issuance of purchase order or contract award, you may be required by the City to provide documentation (copy of employee handbook, eligibility statement from your plans, insurance provider statement, etc.) to verify that you do not discriminate in the provision of benefits.

Section 5. CERTIFICATION

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that I am authorized to bind this entity contractually. By signing this certification, I further agree to comply with all additional obligations of the Equal Benefits Ordinance that are set forth in the Long Beach Municipal Code and in the terms of the contract or purchase order with the City.

Executed this ____ day of ____________, 20__, at _______________, _______

Name: _________________________ Signature: _______________________

Title: __________________________ Federal Tax ID No.: _______

Long Beach Airport City of Long Beach

R-7257

10th February 25 Agoura Hills CA

Daniel E McAuliffe Jr

President 4

EBO Disclosure Form (1/10) 1

EQUAL BENEFITS ORDINANCE DISCLOSURE FORM

As a condition of being awarded a contract with the City of Long Beach (“City”), the selected Contractor/Vendor (“Contractor”) may be required during the performance of the Contract, to comply with the City’s nondiscrimination provisions of the Equal Benefits Ordinance (“EBO”) set forth in the Long Beach Municipal Code section 2.73 et seq. The EBO requires that during the performance of the contract, the Contractor shall provide equal benefits to its employees with spouses and employees with domestic partners. Benefits include but are not limited to, health benefits, bereavement leave, family medical leave, membership and membership discounts, moving expenses, retirement benefits and travel benefits. A cash equivalent payment is permitted if an employer has made all reasonable efforts to provide domestic partners with access to benefits but is unable to do so. A situation in which a cash equivalent payment might be used if where the employer has difficulty finding an insurance provider that is willing to provide domestic partner benefits.

The EBO is applicable to the following employers:

For-profit employers that have a contract with the City for the purchase of goods, services, public works or improvements and other construction projects in the amount of $100,000 or more

For-profit entities that generate $350,000 or more in annual gross receipts leasing City property pursuant to a written agreement for a term exceeding 29 days in any calendar year

Contractors who are subject to the EBO must certify to the City before execution of the contract that they are in compliance with the EBO by completing the EBO Certification Form, attached, or that they have been issued a waiver by the City.

Contractors must also allow authorized City representatives access to records so the City can verify compliance with the EBO.

The EBO includes provisions that address difficulties associated with implementing procedures to comply with the EBO. Contractors can delay implementation of procedures to comply with the EBO in the following circumstances:

1) By the first effective date after the first open enrollment process following the contract start date, not to exceed two years, if the Contractor/Vendor submits evidence of taking reasonable measures to comply with the EBO; or

R-7257

EBO Disclosure Form (1/10) 2

2) At such time that the administrative steps can be taken to incorporate nondiscrimination in benefits in the Contractor/Vendor’s infrastructure, not to exceed three months; or

3) Upon expiration of the Contractor’s current collective bargaining agreement(s).

Compliance with the EBO

If a Contractor has not received a waiver from complying with the EBO and the timeframe within which it can delay implementation has expired but it has failed to comply with the EBO, the Contractor may be deemed to be in material breach of the Contract. In the event of a material breach, the City may cancel, terminate or suspend the City agreement, in whole or in part. The City also may deem the Contractor an irresponsible bidder and disqualify the Contractor from contracting with the City for a period of three years. In addition, the City may assess liquidated damages against the Contractor which may be deducted from money otherwise due the Contractor. The City may also pursue any other remedies available at law or in equity.

By my signature below, I acknowledge that the Contractor understands that to the extent it is subject to the provisions of the Long Beach Municipal Code section 2.73, the Contractor shall comply with this provision.

Printed Name:__________________________ Title:___________________

Signature:_____________________________ Date:___________________

Business Entity Name:____________________________________________

R-7257

2/10/25

Daniel E McAuliffe Jr President

CERTIFICATION OF NONSEGREGATED FACILITIES

The federally-assisted construction contractor certifies that she or he does not maintain or provide, for his employees, any segregated facilities at any of his establishments and that she or he does not permit his employees to perform their services at any location, under his control, where segregated facilities are maintained. The federally-assisted construction contractor certifies that she or he will not maintain or provide, for his employees, segregated facilities at any of his establishments and that she or he will not permit his employees to perform their services at any location under his control where segregated facilities are maintained. The federally-assisted construction contractor agrees that a breach of this certification is a violation of the Equal Opportunity Clause in this contract.

As used in this certification, the term "segregated facilities" means any waiting rooms, work areas, restrooms, and washrooms, restaurants and other eating areas, timeclocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directives or are, in fact, segregated on the basis of race, color, religion, or national origin because of habit, local custom, or any other reason. The federally-assisted construction contractor agrees that (except where she or he has obtained identical certifications from proposed subcontractors for specific time periods) she or he will obtain identical certifications from proposed subcontractors prior to the award of subcontracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity Clause and that she or he will retain such certifications in his files.

Certification – The information above is true and complete to the best of my knowledge and belief.

(Name and Title of Signer)

Signature Date

Company Name

Business Address

Long Beach Airport City of Long Beach

R-7257

2/10/25

McAuliffe Construction

28351 Agoura Rd, Suite B Agoura Hills, CA 91301

Daniel E. McAuliffe Jr, President

Rev 0 of 05/25/16 R-7257

IMJ Commercial Solutions LLC

Ismael Maldonado, Principal

REQUIRED OF ALL PROPOSERS/BIDDERS

(This will become part of the contract for the selected Proposer/Bidder) selected Proposer/Bidder’s performance will be monitored throughout the duration of the contract, and the business enterprise achievement levels will be calculated at the end of the contract term.

Any reduction, increase, or other change to the SBE, BE, LSBE Subcontract amounts without prior written approval of is considered an nauthorized ubcontractor ubstitution, and the Proposer/Bidder may be subject to a penalty. A subcontract dollar value increased or reduced solely as the result of a Change Order issued by to add or delete from the original scope of work shall not be subject to a penalty for an nauthorized ubcontractor ubstitution.

Proposers/Bidders must list all ubcontractors on and include all requested information.

PENALTIES:

Violation of the Program and may result in financial penalties may withhold 1 % of

REPORTING REQUIREMENTS:

The selected Proposer/Bidder shall submit to the SBE, E, subcontractors utilized during the reporting period. will not process or pay selected Proposer/Bidder’s subsequent invoices if the Subcontractor Utilization Reports are not submitted

The Contractor must submit the Final Subcontracting Report ithin fifteen (15) calendar days after a request for the report by .

CERTIFICATION

The Bidder/Proposer certifies that he/she has read and understood the Program and further certifies that, if awarded the Contract, he/she shall fully comply with Program.

Company Name, Address and Phone Number

Signature of Officer or other Authorized Representative Date

Print Name and Title of Officer or Other Authorized Representative

Project Title

TThis has the following :

If awarded the contract, the selected Proposer/Bidder commits to achieving the

LONG BEACH AIRPORT GATEWAY SIGN

R-7257 9.65

McAuliffe Construction 3435 E Thousand Oaks CA 91359

2/9/2025

Ismael Maldonado, General Superintendent

Long Beach Airport Gateway Sign R-7257

Completed by: Contact (please print or type) Phone #

Signature Date Email

#: Project Name: Date:

Combined SBE/VSBE/LSBE Goal % Assigned to Contract:

Prime mount

Prime Contractor :

Business Name, City, State, Contact Person, Phone #

Indicate

“SBE”,

Indicate if

Suppl er Brief Description of Work $ Value of contract % of Total

Prime

Ex #1: ABC Land Surveyors Long Beach, CA Mr. Joe Smith,

(562) 555-1212 SBE 1st tier sub Land surveying $100,000 20%

R-7257 LONG BEACH AIRPORT GATEWAY SIGN

McAuliffe Construction Thousand Oaks, CA Danny McAuliffe 805-857-4974

LBSBE Prime General Contract 100%

McM Concrete Agoura Hills , CA Bruce Arikawa 805-432-0297

VSBE

LBSBE 1st tier sub Concrete & Reinforcing

Hof & Yates Rebar Long Beach , CA Chad Hofheinz 562-595-7444

$145,360 14.8%

LSBE

LBSBE

Supplier Steel Reinforcing $12,000 1.2%

Prime Electrical Contractor Whittier , CA Edgar Morales 323-542-1748

LBSBE 1st tier sub Electrical $99,750 10.2%

Nolan Excavation Orange , CA Jeremy Nolan 714-920-1572

SBE 1st tier sub Earthwork $40,302 4.1%

297,412 30.4

9.65 979,525

McAuliffe Construction

2/9/25

X X

Ismael Maldonado 323.219.5307

2/9/25 ismael@mcauliffeconstruction.com

979,525

INSTRUCTIONS FOR COLB :

SECTION

SECTION 2:

List all SBE/VSBE/LSBE subcontractors, vendors, suppliers, and other businesses that will render materials or services under this contract. If the prime contractor is an

SBE/VSBE/LSBE, list the prime first.

For a to be counted toward meeting the SBE/VSBE/LSBE goals, the must be SBE certified on the City’s online vendor database

The City does NOT issue VSBE certifications; VSBE eligibility will be reviewed and determined upon submittal of the Commitment Plan.

LBSBE Goal % attained

File details come from the government source that posted it. Updated .