QWO combined drawings.pdf
PDF 7 MB Posted
- Solicitation number
- 6973GH-26-R-00078
About this file
This file is a PDF portfolio cover page containing technical instructions for viewing the document. The image displays the Adobe Acrobat/Reader logo on a red and white binder-style cover, with accompanying text instructing users to open the PDF portfolio using Acrobat X or Adobe Reader X, or a later version. A "Get Adobe Reader Now!" button is provided for users who need to download the required software. No contract-related information, solicitation details, technical requirements, or other substantive contract opportunity data is present on this page.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
5 5
EXISTING 8" CMU TYP.
EXISTING 8" CMU TYP.
BUILDING FLOOR PLAN
NOT TO SCALEA001
7BATHROOM
13 13 13
131313
06/02/2025
MGR: ENGINEERING - FORT WORTH
LONDON
QWO-18061596-A001
ARSR
QWO ARSR - LONDON, OHIO
REMOVE EXTERIOR SIDING & REFURB INTERIOR
q w o -1
-a
.d g
INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
C O
N S
T R
U
IO
THIS DRAWING PRODUCED ON THE AGL REGION CAD SYSTEM
PROJECT ENGINEER
18061596
OH
RESTROOM
REPLACE DAMAGED TILES WHERE THE WALL WILL BE REMOVED. CONTRACTORS TO REPLACE BY MATCHING MATERIAL AND SIZING.
REPLACE DAMAGED ACOUSTIC CEILING PANELS UP TO 50%. CONTRACTORS TO REPLACE BY MATCHING MATERIALS AND SIZING.
ADD PANIC HARDWARE TO THE DOORS AS INDICATED.
NEW 8' X 4' CANOPY TO BE INSTALLED ABOVE THE DOORWAY OF THE OFFICE ON THE NORTH SIDE OF BUILDING
EMERGENCY EXIT LIGHT SHALL BE INSTALLED AND WIRED IN BY THE CONTRACTORS AT THE EGRESS DOOR OF THE OFFICE
UNDER CABINET LIGHTING MUST BE INSTALLED IN THE NEW BREAK ROOM.
REMOVAL. ADDITIONAL WIRING MAY BE REQUIRED.
PROPOSED AC CONTROL LOCATION. CONTRACTOR MUST COORDINATE NEW LOCATION WITH SSCM, SITE TECH., AND RE PRIOR TO
TILES NEAR THE RADIO RACK EQUATING TO APPROXIMATELY 12 SQ FT, (3) 2' x 2' TILES.
REPAIR/REPLACE FLOORING, WALLS, AND CEILINGS THROUGHOUT THE FACILITY. THIS CONSIST OF ABATING EXISTING ASBESTOS
REMOVE EXISTING LIGHT SWITCH AND REPLACE IT WITH A NEW 2 WAY LIGHT SWITCH IN THE RESTROOM.
ARSR BUILDING. REFERENCE QWO-18061596-A005 FOR WINDOW AND DOOR SCHEDULES.
REPLACE THE OFFICE WINDOW AND BOTH INSIDE AND OUTSIDE OFFICE DOORS LOCATED ON THE NORTH SIDE OF THE
INSTALLED TO REPLACE THE EXISTING FAN THAT IS REMOVED.
REPLACE THE ENTIRE RESTROOM AND INSTALL A NEW TANKLESS WATER HEATER TANK NEAR THE SINK. A NEW FAN SHALL BE
NEW LED RESTROOM LIGHTS SHALL BE INSTALLED BY CONTRACTORS TO REPLACE THE EXISTING LIGHTS.
NOTES:
BREAK
ROOM
OFFICE
EQUIPMENT
ENGINE
GENERATOR
EXISTING SPACE HEATERS
4-INCH METAL STUDS AT 16" ON CENTER
FIBERGLASS BATT INSULATION
1/2 -INCH DIAMETER ASTM F1554 STEEL SECURITY BARS AT WINDOW PER FAA ORDER 1600.69D
CUT AND FIT 8-INCH MASONRY INFILL AROUND VENT PIPE
NEW 8-INCH MASONRY INFILL
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
B
A
8 1234567
DRAWING NO
DESIGNED
REVIEWED BY
/2
:2
:5
M P lo tt e d b y
V
-C
-E
APPROVED
8 234567
IS
qwo-18061596-a001
2025-06-24T13:36:38-0500
FEKADU M WAKTOLA
2025-06-24T13:24:01-0500
ALAN RAY STRINGFELLOW
QWO-18061596-A002
PLANS AND ELEVATIONS
BREAK ROOM LAYOUT
NOTTO SCALEA002
EAST VIEW OF BREAK ROOM
NOT TO SCALEA002
NORTH VIEW OF BREAK ROOM
NOT TO SCALEA002
10 11
11 10 11
TWH-
:1
:3 lo tt e
KEY NOTES:
WITH RE AND SSCM, IF A HAND HOLD WITH COVER IS DESIRED OR REQUIRED.
COMBO FITTING WITH CLEAN-OUT ACCESS LOCATED ON SOUTH SIDE. CONTRACTOR MUST COORDINATE
WITH THE RE AND SSCM, IF A VENT COVER IS DESIRED OR REQUIRED.
STATE AND/OR LOCAL CODES. COORDINATEEXTEND ABOVE THE EXISTING IN-SITU ROOF, AS DIRECTED BY
INTERFERE WITH EITHER THE ROOF SOFFIT OR THE NEW GUTTERS BEING PLACED. VENT STACK MUST
GREATER THAN 4'-0" ON CENTER. CONTRACTOR MUST ROUTE VENT PIPE SUCH THAT IT DOES NOT
STAND-OFF SUPPORT BRACKETS WITH MASONRY (I.E., TAP CON OR EQUIVALENT) AS INDICATED, WITH NO
VERTICAL ABS SEWER VENT PIPE ATTACHED TO EXISTING IN-SITU 8-INCH EXTERIOR WALL WITH 1 1/2"
SIDE OF THE EXISTING IN-SITU SEPTIC TANK.
ARSR BUILDING. CONTRACTOR MUST PLACE PIPE WITH A SLIGHT DOWNWARD SLOPE TOWARDS THE SOUTH
BLACK ABS SEWER PIPE LEADING TO IN-SITU SEPTIC TANK, LOCATED AT THE NORTHEAST CORNER OF THE
REQUIREMENTS. CONTRACTOR MUST SECURE THE CONDUIT.
UNDER CABINET LED LIGHTING, INSIDE 3/4" EMT CONDUIT, PER FAA STANDARDS AND MEETING ANY NEC
WATER LINE
ELECTRICAL RECEPTICLE
SWITCH TO TURN UNDER CABINET LED LIGHTING ON/OFF.
QUANTITY AND COMUNICATE WITH THE RE AND SSCM, IF THE FAA'S PERCENTAGE IS EITHER LOW OR HIGH.
ESTIMATES APPROXIMATELY 10% MAY NEED TO BE REMOVED AND REPLACED. CONTRACTOR TO TRACK
SSCM TO DETERMINE WHICH TILES NEED TO BE REMOVED AND REPLACED. FOR BIDDING PURPOSES, THE FAA
EXISTING IN-SITU CEILING GRID AND 2' x 2' CEILING TILES. CONTRACTOR MUST COORDINATE WITH RE AND
NEW VINYL BASE BOARD MUST BE PROVIDED FOR EQUIPMENT ROOM, BREAK ROOM, AND OFFICE.
FAA AND NEC STANDARDS.
MUST CONFIRM WHICH PANELS ARE TO BE USED FOR THE KITCHEN AND PROPERLY LABEL THE CIRCUITS PER
NEUTRAL, AND GROUND). SPARE BREAKERS MUST BE LOCATED IN AN ESSENTIAL PANEL. THE CONTRACTOR
AND SSCM. WITHIN THE 3/4" EMT CONDUIT, THERE MUST BE (3) #12 AWG WIRES, ONE FOR EACH (HOT, FAA IS ASKING THE CONTRACTOR TO COORDINATE THE METHOD OF ATTACHMENT WITH THE RE, SITE TECH.
KITCHEN. THE ELECTRIC TANKLESS WATER HEATER IS SHOWN TO BE HARD-WIRED, HOWEVER THE
NEW RECEPTACLES, SWITCHES, AND UNDER-CABINET LED LIGHTS ARE TO BE INSTALLED IN THE NEW
SOURCE, ROUTING, AND LABELING WITH THE RE, SSCM, AND SITE TECH.
INSTALLED IN ACCORDANCE WITH FAA AND NEC STANDARDS. THE CONTRACTOR MUST COORDINATE THE
SPECIFICATIONS), IN 3/4" EMT CONDUIT (FASTENERS AT NO GREATER THAN 36-INCHES ON CENTER, AND
INTENTION THAT ALL ELECTRICAL WIRING BE VISIBLE, SURFACE MOUNTED, LABELED (REFERENCE
INSTALLED IN ACCORDANCE WITH FAA AND NEC STANDARDS (NEC 70, TABLE 210.8A). IT IS THE FAA'S
SWITCHES, RECEPTACLES, ETC. NEED TO BE RATED FOR 120V. ALL RECEPTICLES MUST BE GFCI AND
TANKLESS WATER HEATER, TO BE INSTALLED BELOW THE KITCHEN'S SINK. THE REST OF THE KITCHEN'S
HOW OF THIS TASK. THE KITCHEN WILL REQUIRE ONE 240V DEDICATED CIRCUIT FOR THE ELECTRIC
THE KITCHEN. THIS WILL INVOLVE THE RE, SSCM, AND THE SITE TECH. TO DETERMINE THE WHERE AND
THE CONTRACTOR MUST DISCUSS AND COORDINATE THE ELECTRICAL NEEDS FOR THE NEW LOCATION OF
EXISTING 8-INCH IN-SITU CMU, UNLESS DIRECTED OTHERWISE BY THE RE AND SSCM.
LABELED (REFERENCE SPECIFICATIONS), ROUTED, AND MAY BE SURFACE MOUNTED AND FASTENED TO THE
FORMAT FOR DOCUMENTATION AND REVIEW BY THE RE, SSCM, PEL, AND CO. THE WATER LINE MUST BE
AFTERWARDS, THE CONTRACTOR MUST SUBMIT HIS/HER THOUGHTS, MATERIALS, ETC. IN WRITTEN
DISCUSS HIS/HER PROPOSED THOUGHTS, MATERIALS, ETC. WITH THE RE, SSCM, AND SITE TECH.
AT THE SOUTHEAST CORNER) OF THE BUILDING'S EQUIPMENT ROOM. THE CONTRACTOR WILL NEED TO
GROUND WELL LOCATED SOUTH OF THE BUILDING, IS ROUTED INTO THE BUILDING'S BATHROOM (LOCATED
ETC. WITH THE RE, SSCM, AND SITE TECH. IT IS OUR UNDERSTANDING THAT THE WATER COMES FROM A
TANKLESS WATER HEATER. THE CONTRACTOR MUST DISCUSS HIS/HER PROPOSED THOUGHTS, MATERIALS, THE CONTRACTOR MUST LOCATE AND ROUTE WATER TO THE NEW KITCHEN'S SINK AND TO THE ELECTRIC
KITCHEN SINK.
REQUIRED TO ACCOMPLISH THE INSTALLATION OF THE NEW DRAIN LINE FROM THE RELOCATED NEW
GRADE (TO AT LEAST 95% STANDARD PROCTOR) AND REPLACE ANY ASPHALT THAT MAY HAVE BEEN
REPORT HIS/HER FINDINGS TO THE PEL AND CO. ONLY AFTER THIS, CAN THE CONTRACTOR BACKFILL THE
INSTALLED THE CONTRACTOR MUST NOTIFY THE RE, SUCH THAT HE/SHE CAN OBSERVE, DOCUMENT, AND
AND CORE/DRILL A HOLE IN THE SOUTH SIDE OF THE SEPTIC TANK FOR THE NEW DRAIN-LINE. ONCE
OBSTRUCTIONS LEADING TO THE SEPTIC TANK. THE CONTRACTOR MAY NEED TO REMOVE SOME ASPHALT
CORNER OF THE ARSR BUILDING. THE CONTRACTOR MUST VERIFY THAT THERE ARE NO UNDERGROUND
EXISTING IN-SITU SEPTIC TANK LOCATED AT THE NORTHEASTAND HAVE A GRADUAL SLOPE TOWARD THE
VENT/DRAIN STACK MUST TRANSITION TO A HORIZONTAL CONFIGURATION ONCE IT ENTERS THE SUBGRADE
OFFICER (CO). THE WORK MUST NOT COMMENCE WITHOUT WRITTEN APPROVAL BY THE CO. THE
PROPOSED ALTERNATE TO BE SUBMITTED, REVIEWED, AND APPROVED BY THE RE, PEL, AND CONTRACTING
DISCUSSES HIS/HER PROPOSED ALTERNATE CONFIGURATION WITH THE RE, AND DOCUMENTS THE
MUST BE INSTALLED AS SHOWN, UNLESS THE CONTRACTOR PROPOSES AN ALTERNATE CONFIGURATION, EAST WALL, AS SHOWN IN THESE DOCUMENTS. THE NEW VERTICAL VENT/DRAIN STACKEXTERIOR OF THE
NEW DRAIN WILL CONNECT DIRECTLY INTO A NEW VERTICAL VENT/DRAIN STACK TO BE INSTALLED AT THE
OBSTRUCTIONS, AND COORDINATE WITH THE RE PRIOR TO ANY DRILLING/CORING OF THE CMU WALL. THE
HEIGHT AND LOCATION OF THE NEW WALL PENETRATION, MAKE SURE THERE ARE NO EXISTING
IN-SITU 8-INCH CONCRETE MASONRY UNIT (CMU) WALL. THE CONTRACTOR MUST VERIFY THE PROPOSED
THE NEW KITCHEN SINK'S DRAIN LINE MUST BE INSTALLED SUCH THAT IT PENETRATES THE EXISTING
PROJECT SPECIFICATIONS.
THE CABINETS AND COUNTER TOP WILL ALL BE COVERED IN PLASTIC LAMINATE, AS INDICATED IN THE
INFORMATION.
WATER HEATER INSTALLED BELOW THE SINK. REFER TO THE PROJECT SPECIFICATIONS FOR ADDITIONAL
(SURFACE MOUNTED), A KITCHEN TYPE FAUCET, REFRIGERATOR, MICROWAVE, AND AN ELECTRIC TANKLESS
THE NEW KITCHEN WILL HAVE ALL NEW CABINETS (UPPER AND LOWER), A STAINLESS STEEL KITCHEN SINK
IN SECTIONS 1 AND 2 ON QWO-18061596-A003, AS WELL AS IN THE SPECIFICATIONS.
ADDITIONAL KITCHEN CABINET INFORMATION IS SHOWN2 AND 3, ALSO ON THIS SHEET FOR DIMENSIONS.
LOCATION AND CONFIGURATION OF THE NEW KITCHEN IS AS SHOWN ON THIS SHEET. REFERENCE SECTIONS
3/A002
/A
PAINT WALL(S) WHITE PER SPECIFICATIONS
FAUCET (REFERENCE SPECIFICATIONS)
BRAIDED HOSES TO FAUCET
2-WAY HOT WATER VALVE
3-WAY COLD WATER VALVE
240 VOLT
KEYNOTES:
qwo-18061596-a002
2025-06-24T13:36:46-0500
FEKADU M WAKTOLA
2025-06-24T13:24:06-0500
ALAN RAY STRINGFELLOW
FITTING
COMBO
SANITARY TEE
ABS PIPE
1-1/2" BLACK
PLASTIC
THIN-WALLED
ABS: 3" BLACK
AT 4'-0" MAX., O.C.
WALL BRACKET
MASONRY ANCHORS
(2) 3/8" TAP CON
8" CMU
EXISTING
SPRAYER, REFERENCE SPECIFICATIONS
KITCHEN FAUCET WITH PULL DOWN
PVC P-TRAP
STANDARD
SPECIFICATIONS
KITCHEN SINK, REFERENCE
TOP MOUNT STAINLESS STEEL
PLASTIC LAMINATE
TO BE COVERED WITH
BOTTOM OF CABINET,
WALL
FLANGE AT
WITH CLIPS AT 3'-0" O.C.
3/4" ELECTRICAL CONDUIT
OR RECEPTICAL
ELECTRICAL SWITCH
OUTLET
240V GFCI
HEATER
WATER
TANKLESS
WITH SEMI-GLOSS IN REGAL WHITE
FINISHED WALL SURFACE WILL BE PAINTED
SCRIBE TO WALL
LED UNDERCABINET LIGHTS
QWO-18061596-A003
KITCHEN PLAN DETAILS
BASE CABINET WITH SINK & UPPER CABINET
NOT TO SCALEA003
BASE AND UPPER CABINET
NOT TO SCALEA003
CLAIRTY
HOSES NOT SHOWN FOR
SHUT OFF VALVES AND
REFERENCE SPECIFICATIONS
FOR TOP AND BOTTOM CABINETS,
DOOR FRONTS - PLASTIC LAMINATE
DRAWER ASSEMBLY
REFERENCE
TYP., U.N.O.,
PLASTIC LAMINATE
DRAWER ASSEMBLIES,
SHELVES, AND
CABINET INTERIORS,
BASEBOARD REFERENCE
FINISHED FLOOR
BACKSPLASH, REFERENCE
COUNTER TOP WITH INTEGRAL
DRAWER PULL
BOTTOM CABINETS
SYSTEM TYPICAL FOR TOP AND
ADJUSTABLE SHELF SUPPORT
DOOR PULL
:3 lo tt e qwo-18061596-a003
2025-06-24T13:36:53-0500
FEKADU M WAKTOLA
2025-06-24T13:24:11-0500
ALAN RAY STRINGFELLOW
QWO-18061596-A004
RESTROOM PLAN
MIRROR
PAPER TOWEL DISPENSER
WALL MOUNTED SINK
TOILET
ELONGATED
PIPE
PLUMBING
SIDE VIEW
NOT TO SCALEA004
FRONT VIEW
TOP VIEW
TOILET BOWL
ELONGATED
SINK VIEW
@ 12" O.C. MAX
METAL FASTENERS
ANCHORS TYP.
3/8" DIA. TAPCON
FASTEN TO CMU WALL
VALVE WITH FLANGES TO
ANCHORS TYP.
3/8" DIA. TAPCON
BRAIDED HOSE
lo tt e
ALL EXISTING PLUMBING IN THE SINK WILL BE REDONE AND THE FLOOR
UNDERNEATH THE SINK WILL REPAIRED.
THE EXISTING CABINET THAT IS UNDERNEATH THE CURRENT SINK WILL
BE REMOVED AND ALL HOLES/PENETRATIONS WILL BE REPAIRED. THE
WALL WILL BE PAINTED TO MATCH THE EXISTING WALL IN THE
RESTROOM.
THE EXISTING SINK WILL BE REPLACED WITH A WALL RECTANGULAR
STAINLESS STEEL WALL MOUNTED SINK WITH OPEN PLUMBING AT THE
BOTTOM. NEW PLUMBING WILL NEED TO BE INSTALLED BY
CONTRACTORS FOR THE SINK.
A NEW INSTANT TANKLESS WATER HEATER WILL BE INSTALLED IN THE
RESTROOM FOR THE SINK TO UTILIZE. NEW PLUMBING AND ELECTRICAL
WILL BE INSTALLED BY CONTRACTORS TO CONNECT THE INSTANT
TANKLESS WATER HEATER. LOCATION OF THE TANKLESS WATER
HEATER WILL BE DEPENDENT ON THE SSC.
A MIRROR WILL BE INSTALLED ABOVE THE SINK WITH A PAPER TOWEL
DISPENSER ON THE WALL NEXT TO IT. THE PAPER TOWEL DISPENSER
WILL BE SITTING 36' - 48" ABOVE THE GROUND WHILE THE MIRROR WILL
BE SITTING A MAXIMUM OF 40".
AN ELECTRIC OUTLET SHALL BE INSTALLED TO BE USED IN THE
RESTROOM FOR THE TANKLESS WATER HEATER.
NEW PLUMBING WORK TO BE INSTALLED FROM THE TANKLESS WATER
HEATER TO THE SINK.
ELECTRICAL CONDUIT FASTENED TO CMU WITH METAL FASTENERS
AND 3/8" DIA. TAPCON ANCHORS
THE EXISTING EXHAUST FAN WILL BE REPLACED WITH A NEW EXHAUST
FAN. THIS WILL BE CONNECTED TO THE NEW 2 WAY LIGHT SWITCH.
NEW RECEPTACLES, SWITCHES, AND LIGHTS IN THE RESTROOM WILL BE
CONNECTED TO AN EXISTING SPARE BREAKER. 3/4" EMT CONDUIT WILL BE
RAN FROM THE SWITCH TO THE SPARE BREAKER AND FROM A RECEPTACLE TO
THE POWER PANEL. EACH POWER PANEL WILL BE CONNECTED TOGETHER
WITH A 3/4'' EMT CONDUIT. WITHIN THE EMT CONDUIT (3) #12 AWG WIRE
WILL BE RAN, ONE FOR EACH (HOT, NEUTRAL, GROUND). SPARE BREAKERS
MUST BE IN AN ESSENTIAL PANEL BOARD. CONFIRM THE LOCATION OF THE
PANEL WITH SITE TECH/SSC/RE.
WITH THE NEW PLUMBING UNDER THE SINK BEING FIXED, A NEW
WATER LINE WILL BE INSTALLED TO THE TOILET.
RESTROOM NOTES
18 5/8" MIN
LEGEND
$$ TWO WAY SWITCH
qwo-18061596-a004
2025-06-24T13:37:00-0500
FEKADU M WAKTOLA
2025-06-24T13:24:16-0500
ALAN RAY STRINGFELLOW
QWO-18061596-A005
DOORS, WINDOW, AND WALL FINISH SCHEDULE
SINGLE
EXTERIOR SINGLE RABBET SECURITY FRAMES
DOOR SCHEDULE
DOOR TYPE
DOOR FRAME DETAIL
HARDWARE
PANIC
COMMENT
SIZE
MATERIAL FINISH UNDERCUT TYPE MATERIAL FINISH HEAD SILL JAMB
WIDTH HEIGHT THICKNESS
OFFICE A 3' - 0" 7' - 0" 0' - 1 3/4" HM FACTORY ENAMEL 1/2" 02 HM FACTORY ENAMEL F8/A623 A8/A623 D8/A623
KITCHEN A 3' - 0" 7' - 0" 0' - 1 3/4" HM FACTORY ENAMEL 1/2" 02 HM FACTORY ENAMEL F8/A623 A8/A623 D8/A623
OUTSIDE OFFICE A 3' - 0" 7' - 0" 0' - 1 3/4" HM FACTORY ENAMEL 1/2" 01 HM FACTORY ENAMEL F6/A623 A6/A623 D6/A623
REINSTALLED IN THE NEW DOOR.
EXISTING KEY CORE FOR THE EXTERIOR OFFICE DOOR MUST BE -
ALL DOOR FRAMES TO BE FACTORY FINISHED, ONE-PIECE TYPE-
NOTE:
BE IN ACCORDANCE WITH APPLICABLE CODES, REFER TO SPECIFICATIONS.THE SCHEDULED FLOOR FINISHES SHALL
FLAME SPREAD & SMOKE DEVELOPED INDEXES OF THE SCHEDULED WALL AND CEILING FINISHES AND CLASSIFICATION OF11.
FIRE EQUIPMENT SHALL BE PAINTED RED.
ALL SURFACE-MOUNTED CONDUIT SHALL BE PAINTED TO MATCH ADJACENT WALL. CONDUIT EXCLUSIVELY ALLOCATED TO10.
DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL SURFACES, OPERATING PARTS, LABELS OR WARNINGS.9.
MECHANICAL OR ELECTRICAL EQUIPMENT.
EPX UNLESS OTHERWISE REQUIRED BY CODE. COORDINATE WITH MECHANICAL / ELECTRICAL FOR FINISHES ON
ALL EXPOSED MECHANICAL AND ELECTRICAL EQUIPMENT AND ASSOCIATED SUPPORTING EQUIPMENT SHALL BE PAINTED8.
ON SCHEDULE. FIRE PROTECTION PIPING COLOR SHALL BE SAFETY RED.THE PAINT COLOR SHALL BE AS INDICATED
PAINT ALL EXPOSED STRUCTURAL STEEL ELEMENTS, MISCELLANEOUS STEEL, PIPING, HANGERS, VALVES AND CONDUIT.7.
AT GYPSUM BOARD SOFFITS AND BULKHEADS, PAINT ALL EXPOSED SURFACES.6.
ALL EXPOSED CONCRETE FLOORS SHALL BE SEALED WITH EPOXY, SEE SCHEDULE.5.
INTERIOR CAULKING SHALL MATCH ADJACENT WALL FINISH COLOR.4.
ALL METAL FABRICATIONS AND HANDRAILS SHALL BE PAINTED STI.3.
ALL DOOR FRAMES SHALL BE PAINTED AP3.2.
UNLESS NOTED OTHERWISE, ALL EXPOSED STRUCTURAL STEEL SHALL BE PAINTED EPX.1.
BUILDING FINISHES AND WINDOW SCHEDULE NOTES
EXISTING KEY CORE THE EXTERIOR OFFICE DOOR MUST BE REINSTALLED IN THE NEW DOOR.15.
REPLACE DOOR & FRAME IN PLACE.
SUBCONTRACTOR'S OPTION EITHER HAVE THE DOOR CERTIFIED FOR FIRE RATING ORHAVE FIRE RATING LABEL, AT THE
DOOR & FRAME THAT IS PART OF FIRE RATED CONSTRUCTION SHALL HAVE A FIRE RATING LABEL. IF DOOR DOES NOT14.
ALL EXISTING DOOR DIMENSIONS SHALL BE VERIFIED IN FIELD.13.
ALL NEW AND EXISTING DOOR HARDWARE SHALL BE IN ACCORDANCE WITH FEDERAL ACCESSIBILITY GUIDELINES.12.
DIRECTION OF EGRESS.
DOORS EQUIPPED WITH PANIC HARDWARE SHALL BE OPENABLE WITH A MAXIMUM FORCE OF 15 LBS AS APPLIED IN THE11.
AND OWNER BEFORE INSTALLATION.
ALL SCHEDULED DOORS, FRAMES, AND HARDWARE SHALL BE APPROVED DURING SHOP DRAWING REVIEW BY ENGINEER10.
1003.3.1.8)
MOVEMENT OF EQUIPMENT, MANUALLY OPERATED EDGE OR SURFACE MOUNTED BOLTS MAY BE USED. 2018 IBC, OPERATION. (EXCEPTION: WHERE A PAIR OF DOORS SERVING A ROOM NOT NORMALLY OCCUPIED IS NEEDED FOR THE
KNOB OR SURFACE MOUNTED HARDWARE. THE UNLATCHING OF ANY LEAF SHALL NOT REQUIRE MORE THAN ONE
BE USED. WHERE EXIT DOORS ARE USED IN PAIRS AND APPROVED AUTOMATIC FLUSH BOLTS SHALL HAVE NO DOOR
RESTRAIN THE DOOR OTHER THAN BY OPERATION OF THE LOCKING DEVICE SHALL NOTTHAT MAY BE USED TO CLOSE OR
MANUALLY OPERATED EDGE OR SURFACE MOUNTED FLUSH BOLTS AND SURFACE BOLTS OR ANY OTHER TYPE OF DEVICE9.
FRAMES.
THE SUBCONTRACTOR SHALL FIELD VERIFY DOOR ROUGH OPENINGS WALLS PRIOR TO FABRICATION OF DOORS AND8.
DOOR AND DOOR FRAME FINISH SHALL BE AS SPECIFIED.7.
ALL HARDWARE SHALL BE LEVER TYPE EXCEPT WHERE PANIC HARDWARE OCCURS.6.
CLOSERS, ETC.
ALL FIRE-RATED DOORS SHALL HAVE COMPLETE EQUALLY-RATED ASSEMBLIES INCLUDING FRAMES, SMOKE SEALS,5.
FOOT CANDLE AT FLOOR LEVEL.
EXITS SHALL BE ILLUMINATED AT ANY TIME BUILDING IS OCCUPIED, WITH LIGHT HAVING AN INTENSITY OF NOT LESS THAN 14.
PIN TYPE HINGES ACCESSIBLE FROM THE EXTERIOR SHALL HAVE NON-REMOVABLE PINS.3.
EXIT DOORS SHALL BE OPENABLE FROM INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT. 2.
BY IBC.
LOCKS SHALL BE KEY OPERATED FROM THE OUTSIDE, AND OPERATED FROM THE INSIDE USING A DEVICE NOT PROHIBITED1.
DOOR SCHEDULE NOTES
WINDOW SCHEDULE
MARK COUNT
R.O.
TYPE
FRAME GLAZING DETAILS
SILL HEIGHTWIDTH HEIGHT FINISH MATERIAL COLOR TYPE THICKNESS HEAD JAMB SILL
01 1 FIXED PVDF DBL GLAZED, BOTH PANELS LAMINATED 1" OVERALL ASSEMBLY D8/A644 A5/A644 A8/A644
NEAREST HORIZONTAL IMP BANDING
SILL HEIGHTS VARY, ALIGN WINDOWS WITH MOSTLOGICAL
ROOM FINISH SCHEDULE
ROOM NAME WALL FINISH BASE FINISH
FLOOR CEILING
NOTES & REMARKSMATERIAL FINISH FINISH HEIGHT
OFFICE GYP/PT -
EQUIPMENT ROOM GYP/PT
- ACP
RESTROOM GYP/PT
- ACP
FINISH LEGEND
SURFACE
KEY NAME DESCRIPTION MANUFACTURER SHEEN/MODEL STYLE/NUMBER COLOR SIZE NOTES & REMARKS
CEILING ACP
PANEL
2 X 2 SUSPENDED ACOUSTICAL CEILING
2.03ACOUSTICAL PANEL CEILINGS
SEE SPECIFICATIONS: SECTION 09 51 13 / - - WHITE 24"X24"
WALL AP2 ACRYLIC/LATEX PAINT - FIELD SHERWIN WILLIAMS EGGSHELL FINISH SW 7757 HIGH REFLECTIVE WHITE -
WALL AP3 ACRYLIC/LATEX PAINT - DOOR FRAMES/TRIM SHERWIN WILLIAMS SEMI-GLOSS FINISH SW 7060 ATTITUDE GRAY -
WALL GYP/PT GYPSUM BOARD/PAINTED SHERWIN WILLIAMS PROMAR® 200 HP ZERO VOC INTERIOR ACRYLIC WHITE
SINGLE
INTERIOR DOUBLE RABBET FRAMES
PAINTED FIRED GYP BOARD
PAINTED FIRED GYP BOARD
PER FLS, DOOR NEEDS TO BE FIRE RATED.
PER FLS, DOOR NEEDS TO BE FIRE RATED.
INSTALL ACCORDING TO 1600.69 SECTION 4-3-13. BHMA GRADE 1, LATCH GUARD,
MODIFY TO PREVENT REMOVAL OF HINGES, ETC.
3' - 0" 4' - 0" lo tt e qwo-18061596-a005
2025-06-24T13:37:07-0500
FEKADU M WAKTOLA
2025-06-24T13:24:21-0500
ALAN RAY STRINGFELLOW
BACKING PLATE DETAIL
NOT TO SCALEA006
INTERIOR NON-LOAD BEARING WALL
NOT TO SCALEA006
QWO-18061596-A006
PARTITION BACKING PLATE DETAILS
PARTITION SCHEDULE
METAL STUDS PER
(2)#10x1/2" SMS, 2 BAY MIN
SECURE TO STUDS W/
6"x16 GA STEEL PLATE
PLAN
PLATE
BACKING EQUIPMENT, MIRRORS, ETC. MOUNTING SCREWS
INSTALLATION INSTRUCTIONS
SCREWS PER MANUFACTURER'S
TYPE, SPACING, AND NUMBER OF THE TYPICAL
BULLITEN BOARDS
SHELVES, WALL HUNG MIRRORS,
WALL HUNG EQUIPMENT, LOCKERS,
CABINETS, WALL HUNG CABINETS,
LOWER AND UPPER KITCHEN
GAUGE, SPACING, AND HEIGHT LIMITATIONS
METAL STUD - SEE TABLE BELOW FOR SIZE,
FLOOR
GYPSUM BOARD TO EXISTING TOP OF CONCRETE
1 LAYER 5/8" HI-ABUSE/MOLD/MILDEW RESISTANT
INSULATION
GLASS FIBER BATT
CONTINUOUS INSULATION TO UNDERSIDE OF STRUCTURE
FASTENED TO DEFLECTION TRACK
GAUGE TO MATCH STUD; RUNNER IS NOT
DEFLECTION TRACK WITH DEEP LEG RUNNER;
WHERE OCCURS
SCHEDULED CEILING
FASTENERS AT FLUTE BOTTOM
SCHEDULE AND FINISH KEY
SCHEDULED FINISH; SEE FINISH
EXISTING IN-SITU SUSPENDED CEILING
BOTTOM OF EXISTING METAL DECK
ELEVATIONS = VARIES, F.V.
EXISTING METAL DECK
LIMITING HEIGHTS
10 PSF L/240
GA SPAN @ 16" OC
STC
RATING
FIRE
PARTITION
SIZE
STUD
TYP. 4" 49 - 20 16'-10"
- LIMITING HEIGHTS BASED ON SSMA VALUES, INTERIOR NON-LOAD BEARING
lo tt e qwo-18061596-a006
2025-06-24T13:37:13-0500
FEKADU M WAKTOLA
2025-06-24T13:24:25-0500
ALAN RAY STRINGFELLOW
FRAMING ELEVATION
NOT TO SCALEA007
DOUBLE STUD - BOTTOM TRACK
DOUBLE STUD - HEAD
SINGLE STUD - BOTTOM TRACK
DOUBLE STUD - HEAD
HEAD OPENING DETAIL
QWO-18061596-A007
PARTITION FRAMING DETAILS
TYPE C METAL STUDS
WHERE JAMB CONSISTS OF
AND BOLTED TO FLOOR
CLIP ANGLE WELDED TO JAMB
HEAD SMS, EACH SIDE
3/4" #10 LOW PROFILE PAN
2"
IN
IN
FLUSH WITH JAMB
DETAIL F4 EXCEPT CUT WEB
AT BOTTOM TRACK: SEE
SPAN: 8'-0" TO 12'-0"
FLUSH WITH JAMB
AT BOTTOM TRACK: CUT WEB
SPAN: 3'-6" TO 8'-0"
TRACK
NESTED INTO RUNNER
TYPICAL VERTICAL STUD
HEAD SMS, EACH SIDE
3/4" #10 LOW PROFILE PAN
MAX BETWEEN
CONDITIONS, AND 24" OC
ENDS, 1" AT JAMB
FASTENERS AT 2" FROM
POWDER DRIVEN
TO NESTED STUDS
RUNNER TRACK WELDED
SPAN = 8'-0" TO 12'-0"
TO NESTED STUDS
RUNNER TRACK WELDED
TYP.
1/8"
RUNNER TRACK
SPAN = 3'-0" TO 8'-0" SPAN = LESS THAN 3'-0"
1@8
1/8" 1@8
3 & 5/A007
2/A0074/A007
:0 lo tt e qwo-18061596-a007
2025-06-24T13:37:20-0500
FEKADU M WAKTOLA
2025-06-24T13:24:30-0500
ALAN RAY STRINGFELLOW
QWO-18061596-A008
CANOPY ELEVATION AND DETAILS
CMU WALL
EXISTING
ASTM F1554
ALL-THREAD
3/4" DIA.
3/4" X 4" X 4"
PLATE
3/8" X 4" X 4"
NEOPRENE
LENGTH REQ'D
3/8" X 6" X
NEOPRENE
C8X11.5
L3 X 3 X 1/4
C8X11.5 C8X11.5
ROOF DECK
GALVANIZED METAL
20 GA. TYPE B
L3 X 3 X 1/4 C8X11.5
1/4" BENT PLATE
1/4" BENT PLATE
CLEVIS NUMBER 2
2" RADIUS
1/2" X 4" X LENGTH ROD
C8 X 11.5
L3 X 3 X 1/4
A008
CANOPY ELEVATION
NOT TO SCALE A008
CANOPY PLAN (TYP)
NOT TO SCALEA008
CANOPY SECTION (TYP)
NOT TO SCALEA008
4' X 8' CANOPY
CLEVISCLEVIS
TURNBUCKLE TURNBUCKLE
3 3 lo tt e
3"
3/16"
1/4" / FT
1/4" / FT
THE CLEVIS WILL BE THE CLEVIS NUMBER 2.
UP THE CANOPY. THE TURNBUCKLE WILL BE 3/4" DIA. AND
A CLEVIS AND A TURNBUCKLE SHALL BE INSTALLED TO HOLD
FROM BACKING OFF
DAMAGE THREADS AFTER INSTALLATION TO PREVENT NUT
MITER CORNER AND GRIND WELD SMOOTH
GENERAL NOTES
qwo-18061596-a008
2025-06-24T13:37:29-0500
FEKADU M WAKTOLA
2025-06-24T13:24:35-0500
ALAN RAY STRINGFELLOW
SITE PLAN
NOT TO SCALEC001
QWO-18061596-C001
SITE PLAN
-c
FENCE
CHAIN-LINK
.50
ELE
VATIO
FL
OORBUIL
DIN
MASONRY
ONE
STORY
(ASPHALT)
AREA
PARKING
TO
RMLT
ITE
XENI
ROAD
(P
AVED)
0'- 0"
TANK
SEPTIC
OF LEASED AREA
BOUNDARY
POLE
COMPANY
POWER
TO FACILITY
ENTRY DRIVE
R/ W
TRANSFORMER POWER
POWER POLE
POWER COMPANY
E/G
SHED
STORAGE
POWER CABLES
PLATE LINE
AND BEACON ABOVE
CENTER OF RADAR
ABOVE
OUTLINE OF RADOME
TO FACILITY
FRONT GATE
STORAGE SHED
PREFABRICATED
LATERAL LINES
:0 lo tt e
-c qwo-18061596-c001
2025-06-24T13:36:08-0500
FEKADU M WAKTOLA
2025-06-24T13:23:39-0500
ALAN RAY STRINGFELLOW
/1
12'-8"
22'-7 1/2 "
/8
36'
73'-2"
90'-4"
7 1/2 "
/1
17'-2"
13 1514 16
35 3637
42434
5556575859
2' X 4')(APPROX.
EXPOSED ASBESTOS FLOORING TO BE ABATED
ASBESTOS FLOORING BELOW CABINET TO REMAIN
DEMO FLOOR PLAN
NOT TO SCALED001
4'-0 15/16 "
QWO-18061596-D001
DEMO FLOOR PLAN
-d lo tt e
WASH ROOM
PANEL A
PANEL B
TVSS ABOVE
TVSS BELOW
MPG
FIRE EXTINGUISHER
FIELD CABLE J-BOX
CABLE TRAY
2 COMPRESSORS (CARSR)
COMPRESSOR/DEHYDRATOR J-BOX
RMMS BOX
A2 APU LOWER SIGNALING CONDITIONING BOX
LIGHTNING PROTECTION PANEL (U10)
LOWER SIGNAL PULL BOX
LOWER POWER PULL BOX
MODE-S LIGHTNING PROTECTION
ACE CABINET
SINGLE GROUND
BUEC
EMPTY (EXPOSED ASBESTOS FLOORING)
A/C CONTROL
A/C INTAKE
ATCBI-6 CABINETS
UPS MONITOR
CEILING MOUNTED UNIT HEATER
NUMBERED LEGEND:
44 BATTERIES
PANEL MDPE
PANEL MCP
LOAD BANK CONTROL PANEL
CARSR POWER PANEL
ANCILLARY POWER PANEL
POWER PANEL ATCBI-6
TRANSFORMER T1 & T2
TRANSFORMER GROUND
RMI FILTER 1 & SCB-1
EMI FILTER 2 & SCB-2
HONEYWELL ALARM
DEMARC
TELCO
PANEL F
ERMS PIB
HONEYWELL CONTROL
ERMS P4B
T-STAT
COAT RACK
EYEWASH STATION
PANEL
CARSR RECEIVER CABINET (DMTI)(U1)
CARSR RECEIVER CABINET (DMTI)(U2)
TRANSMITTER CABINET (U3)
TRANSMITTER POWER SUPPLY CABINET (U4)
COMMUNICATIONS INTERFACE CABINET (U7)
TMCT A/B WORKSTATION (U8/U9)
APU (INDUCTOSYN) CABINET
MODEM RACK
ERMS P5
RMC CABINET
UPS MAINT. BYPASS SWITCH
LEGACY WAVEGUIDE
CARSR WAVEGUIDE
UPS CABINETS
UPS
ENGINE
GENERATOR
REMOVE ALL OUTSIDE SIDING
OPERATIONAL AT ALL TIMES.
TO REMAIN ENERGIZED AND FULLYSENSITIVE AND NEEDS
CONTRACTOR NEEDS TO BE AWARE THAT THE EQUIPMENT IS VERY
LOCATED AROUND OPERATIONAL AND ENERGIZED EQUIPMENT. THE
TECH. DURING ALL REMOVAL OF EXISTING IN-SITU WOOD PANELING
MUST COORDINATE WITH THE RE, SSCM, AND SITECONTRACTOR(S)
OR PENETRATION WILL NEED TO BE PATCHED AND PAINTED.
ALL WOODEN WALL PANELING SHALL BE REMOVED AND ANY HOLES
INTERIOR PARTITION WALLS AROUND OFFICE TO BE REMOVED.
OFFICE WINDOW AND DOORS TO BE REMOVED.
THE NAS.
OTHER CRITICAL EQUIPMENT AND/OR OPERATIONS RELATED TO
SERVICE IN A SAFE AND EFFICIENT MANNER SO AS NOT TO AFFECT
THE SITE TECH. TO ENSURE THE BATHROOM IS TAKEN OUT OF
REMOVED OR REMEDIATED. COORDINATE WITH THE RE, SSCM, AND
DRAINS, PIPING, VALVES, AND ELECTRICAL FOR THE BATHROOM ARE
CONTRACTOR WILL NEED TO ENSURE ALL WATER, SANITARY SEWER
MIRROR, TOILET, AND CERAMIC FLOOR TILE MUST BE REMOVED.
BATHROOM SINK, CABINET, LAVATORY, EXHAUST FAN, SHELVES,
AND WIRING.
SOFTENER TO BE REMOVED, ALONG WITH ASSOCIATED PLUMBING
EXISTING WATER HEATER, EXPANSION TANK, AND WATER
WIRING AND CONDUIT AS REQUIRED.
RE PRIOR TO REMOVAL. CONTRACTOR MAY NEED ADDITIONAL
COORDINATE A NEW LOCATIONS WITH THE SSCM, SITE TECH, AND
AC CONTROL MUST BE RELOCATED. CONTRACTOR(S) MUST
THE EXISTING IN-SITU KITCHEN MUST BE REMOVED
DESK MUST BE REMOVED AND RELOCATED
TOOLBOX MUST BE REMOVED AND RELOCATED
CABINETS MUST BE REMOVED AND RELOCATED.
KEY NOTES:
REMOVAL OF OUTSIDE SIDING
NEEDS TO BE REMOVED
SINK/ TOILET/ EQUIPMENT/ COUNTER THAT
DOORS THAT NEED TO BE REMOVED
WALLS THAT NEED TO BE REMOVED
WOOD PANELING THAT NEEDS TO BE REMOVED
LEGEND:
qwo-18061596-d001
2025-06-24T13:36:15-0500
FEKADU M WAKTOLA
2025-06-24T13:23:44-0500
ALAN RAY STRINGFELLOW
NORTH WALL
SCALE: 3/8" = 1' - 0"D002
EAST WALL
SOUTH WALL
WEST WALL
PLUMBING UNDER SINK
NOT TO SCALED002
PLUMBING UNDER SINK
6 6
QWO-18061596-D002
DEMO KITCHEN AND BATHROOM
KITCHEN
CURRENT RESTROOM LAYOUT DOES NOT HAVE ANY ROOM UNDERNEATH
THE SINK CABINET FOR ANY STORAGE. PLUMBING IS RAN THROUGH OUT
THE SINK CABINET.
PLUMBING IN THE CABINET SHALL BE REDONE AND THE FLOOR UNDER
THE SINK SHALL BE PATCHED UP DUE TO THE RUNNING OF PLUMBING
EVERYWHERE.
EXISTING WATER HEATER, EXPANSION TANK, AND WATER SOFTENER ARE
LOCATED IN THE EG ROOM. THESE ITEMS ARE UNPLUGGED AND HAVE NOT
BEEN IN USED. THESE WILL NOT BE NEEDED AND SHALL BE REMOVED
FROM THE PROPERTY BY CONTRACTOR.
SPACE SHALL BE MADE FOR A WATER HEATER IN THE RESTROOM NEXT
TO THE NEW SINK AND CABINET
STORAGE CABINETS IN THE CURRENT KITCHEN WILL BE REMOVED AND
RELOCATED, STORE, OR DISPOSE OF AS DIRECTED BY THE SSC.
ALL KITCHEN CABINETS, PAPER TOWEL DISPENSER, FAUCET, AND FRIDGE
WILL BE REMOVED AND DISPOSED OF BY CONTRACTORS.
DRAIN PIPES AND RO (REVERSE OSMOSIS) SYSTEM IN THE KITCHEN SINK
CABINET WILL BE REMOVED.
REMOVE MICROWAVE AND STOVE AND STORE OR DISPOSE OF AS
DIRECTED BY SSC.
WALL PANELING ALONG THE WALL OF THE ENTIRE ARSR WILL BE
REMOVED BY CONTRACTORS.
THE WATER FILTRATION SYSTEM LOCATED UNDER THE SINK HAS NOT
BEEN UTILIZED IN QUITE SOMETIME AND WILL BE REMOVED BY THE
CONTRACTOR.
TOILET AND SINK SHALL BE REMOVED AND REPLACED BY THE
CONTRACTORS.
EXISTING VERTICAL VENT PIPE TO REMAIN IN RESTROOM.
A NEW RESTROOM MIRROR WILL BE REPLACED.
THE DRAIN FOR THE KITCHEN SINK PENETRATES THE EAST WALL AND
TRAVELS ALONG THE EAST FACE OF THE BUILDING AND DRAINS ONTO THE
GRADE. THE EXTERIOR PVC PIPES APPEAR TO HAVE HEAT TRACE TO
PREVENT FREEZING DURING WINTER TIME. THIS SHALL BE REMOVED AND
REPLACED TO CONNECT WITH THE SEPTIC TANK BY THE CONTRACTOR.
CONTRACTOR NEEDS TO PROVIDE ABATEMENT PLAN. ALL EQUIPMENT
SHALL BE PROPERLY COVERED TO MITIGATE RISK RELATED TO DUST,
DEBRIS, AND CONTAMINATION. CONTRACTOR SHALL BE RESPONSIBLE
FOR ALL CLEAN UP OF DUST AND DEBRIS AT NO EXTRA CHARGE TO THE
GOVERNMENT.
EXHAUST FAN TO BE REMOVED AND REPLACED WITH A NEW FAN. WIRING
WILL BE RAN FROM THE NEW FAN TO THE NEW 2 WAY SWITCH BY THE
DOOR.
SCOPE OF WORK
lo tt e qwo-18061596-d002
2025-06-24T13:36:23-0500
FEKADU M WAKTOLA
2025-06-24T13:23:49-0500
ALAN RAY STRINGFELLOW
QWO-18061596-D003
EXTERIOR DEMO ELEVATION
NORTH ELEVATION
NOT TO SCALED003
SOUTH ELEVATION
WEST ELEVATION
EAST ELEVATION
1 1 1
EG ROOM
1 1
EQUIPMENT ROOM
EG ROOM
EQUIPMENT ROOM
EXTERIOR LIGHT
lo tt e
CONDITIONS.
THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL DIMENSIONS AND SITE
CONSTRUCTION STANDARD, 29 CFR 1926.62.
OF BY A OHIO LBP ABATEMENT CONTRACTOR. FOLLOW THE REQUIREMENTS OF THE OSHA LEAD IN
REMOVED IN ACCORDANCE WITH STATE AND FEDERAL REGULATIONS AND BE REMOVED AND DISPOSEDBE
LEAD PAINT FOUND AND WOULD NEED TO BE DEALT WITH ACCORDINGLY. LEAD BASE PAINT IS TO
REMOVE HEAT TRACE AND 2" PVC DRAIN PIPE
A NEW DOOR. FOR DOOR SCHEDULE, REFERENCE QWO-18061596-A005.
REMOVE EXISTING EXTERIOR DOOR, FRAME, AND HARDWARE OUTSIDE OF THE OFFICE AND REPLACE WITH
DOOR SCHEDULE, REFERENCE QWO-18061596-A005 AND SECURITY ORDER 1600.69D APPENDIX B-2 PART D.
PROVIDE AND INSTALL NEW OUTSIDE SECURITY BARS (BLACK IN COLOR) 1/2" STEEL. FOR WINDOW AND
WINDOW, FRAME, AND HARDWARE ON THE NORTH SIDE OF THE BUILDING WITH A SECURITY WINDOW.
REMOVE EXISTING SECURITY BARS OUTSIDE OF OFFICE WINDOW AND REPLACE THE EXISTING OFFICE
ARE DAMAGED. FOR NEW EXTERIOR SOFFIT, REFER TO SPECIFICATION SHEET.THAT
FACTORY INTEGRAL COLOR. INSPECT PLYWOOD SUBSTRATE WHEN REMOVING PANELS AND REPLACE ANY
REMOVE AND REPLACE OLD EXTERIOR SOFFIT WITH NEW EXTERIOR SOFFIT ACROSS THE ENTIRE FACILITY.
REFERENCE QWO-18061596-A005 FOR WALL PAINT FINISH.
FOLLOW THE REQUIREMENTS OF THE OSHA LEAD IN CONSTRUCTION STANDARD, 29 CFR 1926.62.
REGULATIONS AND BE REMOVED AND DISPOSED OF BY A OHIO LBP ABATEMENT CONTRACTOR.
LEAD BASED PAINT, THE PAINT MUST BE REMOVED IN ACCORDANCE WITH STATE AND FEDERAL
PATCHING AND RESEALING EXTERIOR PENETRATIONS, HOLES, AND CRACKS. WITH THE WALLS CONTAINING
MATERIALS FROM THE WALL PANELS WILL BE REMOVED USING A SCABBLER. MUST PAINT WALLS AFTER
SHALL BE USED TO REMOVE ALL PAINT AND EXCESS MATERIALS OFF OF THE CMU WALL. PAINT AND
REDUNDANT PENETRATIONS SUCH AS OLDER PIPES AND PENETRATIONS. A CONCRETE SCABBLER
PENETRATIONS, HOLES, OR CRACKS SHOULD BE COVER AND SEAL. THIS INCLUDES ANY NON-USED AND
VINYL SIDING MATERIAL AT EXTERIOR WALLS TO BE REMOVED ACROSS THE ENTIRE FACILITY. ANY
:KEY NOTES
qwo-18061596-d003
2025-06-24T13:36:30-0500
FEKADU M WAKTOLA
2025-06-24T13:23:53-0500
ALAN RAY STRINGFELLOW
PROJECT SITE
QWO-18061596-G001
COVER SHEET AND INDEX OF DRAWINGS
-g
AVIA
LA
TRAT
SI
NI
LONGITUDE : -83.48165 W
LATITUDE : 39.84600 N
LONDON, OH 43140
1365 OLD XENIA RD SW
T OF TRANSPO
T A
IC
OF
STATES
IT
P A
TM
EN
PLANS AND ELEVATIONS
KITCHEN PLAN DETAILS
RESTROOM PLAN
DOORS, WINDOW, AND WALL FINISH SCHEDULE
PARTITION BACKING PLATE DETAILS
PARTITION FRAMING DETAILS
INDEX OF DRAWINGS
DRAWING NUMBER DRAWING TITLE
QWO-18061596-G001 COVER SHEET, PROJECT SITE, AND INDEX OF DRAWINGS
QWO-18061596-G002 PROJECT GENERAL NOTES
QWO-18061596-D001 DEMO FLOOR PLAN
QWO-18061596-D002 DEMO KITCHEN AND BATHROOM
QWO-18061596-D003 EXTERIOR DEMO ELEVATIONS
QWO-18061596-C001 SITE PLAN
QWO-18061596-A001
QWO-18061596-A002
QWO-18061596-A003
QWO-18061596-A004
QWO-18061596-A005
QWO-18061596-A006
QWO-18061596-A007
QWO-18061596-A008 CANOPY ELEVATION AND DETAILS
lo tt e qwo-18061596-g001
2025-06-24T13:35:53-0500
FEKADU M WAKTOLA
2025-06-24T13:23:27-0500
ALAN RAY STRINGFELLOW
QWO-18061596-G002
PROJECT GENERAL NOTES
lo tt e
OF 29 CFR 1926.1101 & 29 CRF 1926.62.
MANNER BY A LICENSED OHIO HAZARDOUS MATERIAL CONTRACTOR. FOLLOW THE REQUIREMENTS
REGULATIONS. THE HAZARDOUS MATERIALS MUST BE REMOVED AND DISPOSED OF IN A LEGAL
REMOVED PRIOR TO CONSTRUCTION IN ACCORDANCE WITH BOTH STATE AND FEDERAL
SHOULD ANY ASBESTOS CONTAINING MATERIAL (ACM) OR LEAD PAINT BE FOUND, IT MUST BE
THE FAA IS TO TEST FOR ASBESTOS AND LEAD PAINT PRIOR TO THE START OF CONSTRUCTION. 13.
ACCORDANCE WITH FAA-STD-019G.
ALL NEW WINDOWS AND DOORS THAT ARE TO BE INSTALLED MUST BE BONDED AND GROUNDED IN 12.
ALL GROUNDING MUST BE SIZED IN ACCORDANCE WITH NFPA 70(NEC) 2023 AND FAA STD-019G.11.
MEANS OF EGRESS MUST NOT BE OBSTRUCTED THROUGHOUT THE PERIOD OF THE WORK.10.
DEMOLITION", AND 015000 "TEMPORARY FACILITIES AND CONTROLS".
ETC. FOLLOW SPECIFICATION SECTIONS 024116 "STRUCTURE DEMOLITION", 024119 SELECTIVE
MINIMUM DUST IS IN THE AIR, USING ATTACHMENTS ON THE VACUUM TO REDUCE DUST IN THE AIR, BE ENFORCED. THIS MAY INCLUDE COVERING UP ANY EQUIPMENT, VACUUMING TO MAKE SURE
WHEN WORKING INSIDE THE ARSR OR AROUND ANY ACTIVE EQUIPMENT, DUST MITIGATION MUST 9.
MUST BE PROPERLY STORED.
CONSTRUCTION AREAS MUST BE CLEANED DAILY. ALL DEBRIS MUST BE REMOVED. ALL TOOLS 8.
AND REPAIRED TO MATCH EXISTING AS CLOSE AS POSSIBLE. AT NO COST TO THE GOVERNMENT.
FINISHES AND SURFACES DAMAGED BY THE DEMOLITION OR CONSTRUCTION MUST BE PATCHED 7.
AND ACCOUNTABLE PROPERTY DISPOSAL.
COMPLETING NECESSARY INFORMATION IN THE AUTOMATED INVENTORY TRACKING SYSTEM (AITS)
DEBRIS, EQUIPMENT, AND ASSOCIATED CONDUIT AND CABLE. THE FAA IS RESPONSIBLE FOR
THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND OFF-SITE DISPOSAL OF ALL DEMO 6.
FOLLOW OSHA SAFETY REQUIREMENTS WHILE WORKING ON ELECTRICAL SYSTEMS.5.
PHASES OF CONSTRUCTION, AS REQUIRED BY LOCAL FAA PERSONNEL.
CONTRACTOR MUST MAINTAIN ALL SIGNAL, POWER, LIGHTING, AND ALARM CIRCUITS DURING ALL 4.
TO BE PLANNED 30 DAYS IN ADVANCE WITH THE SSCM AND RE.
ANY OUTAGE OVER 24-HOURS WILL BE CONSIDERED A STRATEGIC SHUTDOWN AND IS REQUIRED 3.
FOLLOW OSHA SAFETY REQUIREMENTS WHILE WORKING ON ELECTRICAL SYSTEMS.2.
ADVANCE.
ELECTRICAL SYSTEMS. ALL DEMOLITION WORK MUST BE COORDINATED WITH FAA PERSONNEL IN
FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO DEMOLITION OF BUILDING 1.
GENERAL DEMOLITION NOTES
1. CONSTRUCTION SITE ACCESS AND HAUL ROADS - ACCESS TO THE JOB SITE SHALL BE VIA
SPECIFIC ROUTE AS DIRECTED BY LOCAL FAA PERSONNEL. ANY DAMAGE TO HAUL ROADS,
RESULTING FROM THE EXECUTION OF THIS CONTRACT, MUST BE REPAIRED AT NO ADDITIONAL
COST TO THE GOVERNMENT. ALL VEHICLES AND TRAFFIC SHALL REMAIN WITHIN THE LIMITS OF
THE CONSTRUCTION AREA, STAGING AREA, OR HAUL ROUTES.
2. SECURITY CLEARANCE - ALL WORKERS/EMPLOYEES SHALL COMPLY WITH ALL VEHICULAR
SIGNAGE REQUIREMENTS AND ALL SECURITY CLEARANCE BADGING/ESCORTING REQUIREMENTS
OF THE CONSTRUCTION CONTRACT AND WITH LOCAL AUTHORITIES. REVIEW ALL EXISTING
UTILITIES IN THE AREA OF CONSTRUCTION WITH THE FAA, SSCM, SITE TECH., RE, AND ALL OTHER
INTERESTED STAKEHOLDERS PRIOR TO BEGINNING WORK.
3. THE STAGING AREA'S LOCATION, SIZE, ETC. MUST BE COORDINATED WITH THE FAA'S RESIDENT
ENGINEER (RE) AND THE SSCM. PROVISIONS MUST BE MADE FOR ANY REQUIRED UTILITIES. UPON
COMPLETION OF THE PROJECT, THE STAGING AREA; INCLUDING THE REPAIR OF EXISTING
FACILITIES, REMOVAL OF TEMPORARY UTILITIES, REGRADING, ADDING TOP SOIL, AGGREGATE AND
PLANTINGS MUST BE RESTORED TO THE ORIGINAL CONDITION, AT NO COST TO THE GOVERNMENT.
4. REFERENCE DRAWINGS MAY BE SHOWN FOR INFORMATION ONLY. WHERE THERE ARE CONFLICTS
NOTED BETWEEN THE CONSTRUCTION DRAWINGS AND THE REFERENCE DRAWINGS, THE
CONSTRUCTION DRAWINGS WILL GOVERN. THE RE MUST BE NOTIFIED (IN WRITING) OF ANY
CONFLICTS PRIOR TO THE CONTRACTOR PERFORMING ANY OF THE RELATED WORK.
5. WORK COORDINATION - DUE TO THE SENSITIVITY OF THE FACILITY, THE CONTRACTOR MUST
COORDINATE DAILY WITH FAA'S RE, AS WELL AS, WITH THE FACILITIES' SSCM TO ENSURE THAT ALL
WORK TO BE PERFORMED, WILL CAUSE NO INTERFERENCE TO EQUIPMENT, OR DISRUPTION TO
THE NATIONAL AIR SPACE (NAS).
6. LOCATIONS AND ELEVATIONS OF EXISTING IMPROVEMENTS MUST BE VERIFIED BY FIELD
MEASUREMENTS PRIOR TO CONSTRUCTION OF ANY NEW WORK.
7. ALL DIMENSIONS MUST BE VERIFIED IN THE FIELD. ANY DISCREPANCIES FOUND BETWEEN THE
DRAWINGS AND SPECIFICATIONS AND/OR IN-SITU SITE CONDITIONS, OR ANY INCONSISTENCIES, AMBIGUITIES, IN THE DRAWINGS OR SPECIFICATIONS MUST BE IMMEDIATELY REPORTED TO THE
RESIDENT ENGINEER (RE), WHO IN-TURN WILL CORRECT SUCH INCONSISTENCIES OR AMBIGUITIES
IN WRITING. THE CONTRACTOR MUST DO NO WORK EITHER BEFORE OR AFTER SUCH DISCOVERY
OF ANY DISCREPANCIES, INCONSISTENCIES, OR AMBIGUITIES WITHOUT RE'S AUTHORIZATION (IN
WRITING). ANY WORK DONE BY THE CONTRACTOR AFTER DISCOVERY OF SUCH DISCREPANCIES
WITHOUT THE RE'S PRIOR AUTHORIZATION, WILL BE CONSIDERED TO HAVE BEEN DONE, AT THE
CONTRACTOR'S OWN RISK.
8. THE CONTRACTOR MUST TAKE PRECAUTIONARY MEASURES TO PROTECT THE SITE, THE BUILDING, ALL NEW OR EXISTING UTILITIES, EQUIPMENT WITHIN AND AROUND THE BUILDING, EXISTING
PERMANENT STRUCTURES NOT OF RECORD, OR CURRENTLY SHOWN ON THE CONSTRUCTION
DOCUMENTS. ANY IN-SITU UTILITIES AND/OR STRUCTURES DAMAGED DURING THE COURSE OF
CONSTRUCTION MUST BE REPAIRED BY THE CONTRACTOR WITH EQUAL OR SUPERIOR QUALITY,
AT NO COST TO THE GOVERNMENT. THE CONTRACTOR MUST NOTIFY THE RE IMEADIATELY AFTER
THE INCIDENT AND PROVIDE THE RE WITH A FOLLOW-UP WRITTEN EXPLANATION. THE
CONTRACTOR WILL DESCRIBE THE INCEDENT, THE CAUSE, THE DAMAGE, AND WHAT REMEDIAL
MEASURES WILL BE TAKEN TO PREVENT A REACCURANCE.
GENERAL NOTES
1. BEFORE INITIATION OF ANY CONSTRUCTION ACTIVITIES, THERE MUST BE COORDINATION BETWEEN THE CONTRACTOR, SSCM, SITE TECH., AND THE RE. THE CONTRACTOR MUST MAKE ARRANGEMENTS WITH A THIRD-PARTY GPR UTILITY
LOCATING SERVICE TO ENSURE THAT THERE IS A THOROUGH IDENTIFICATION OF ALL UNDERGROUND UTILITIES, WHICH
IS PARAMOUNT TO MINIMIZING THE RISK OF ANY DISRUPTION(S) DURING CONSTRUCTION.
2. DEVELOP AND REGULARLY PRACTICE AN EMERGENCY RESPONSE PLAN FOR VARIOUS SCENARIOS INCLUDING FIRE, ACCIDENTS, AND/OR SECURITY BREACHES.
3. ESTABLISH CLEAR COMMUNICATION PROTOCOLS FOR EMERGENCIES, AS WELL AS, DAY-TO-DAY OPERATIONS.
4. REGULAR INSPECTION(S) AND MAINTENANCE OF CONSTRUCTION EQUIPMENT, TO ENSURE SAFE, RELIABLE OPERATION.
5. PROPER STORAGE OF MATERIALS TO PREVENT HAZARDS AND ENSURE COMPLIANCE WITH FAA SAFETY STANDARDS.
6. HAVE ON HAND EMERGENCY CONTACT INFORMATION FOR THE COTR , RE , AND SSCM IN THE EVENT OF A
CONSTRUCTION ACTIVITY THAT ADVERSELY IMPACTS THE OPERATIONAL SAFETY OF THE NAS.
7. IN THE EVENT OF AN EMERGENCY, CALL 911, UNLESS OTHERWISE DIRECTED, AT THE PRE-CONSTRUCTION MEETING.
8. THE SIZE AND LOCATION OF THE STAGING AREA MUST BE COORDINATED AND DETERMINED BY THE FAA'S SSCM . THIS
STAGING AREA MUST BE SECURED AT THE END OF EACH CONSTRUCTION DAY. MAKE PROVISIONS FOR ANY REQUIRED
UTILITIES, THE STAGING AREA AND LAY DOWN AREA MUST BE SECURED AT THE END OF EACH WORK DAY,COORDINATE
WITH LOCAL FAA PERSONEL FOR THE REMOVAL AND/OR STORAGE OF ANY EXISTING EQUIPMENT. RESTORE THE
STAGING AREA TO INCLUDE THE REPAIR OF EXISTING FACILITIES, REMOVAL OF UTILITIES, REGRADING, AND
RESTORATION TO PRE- CONSTRUCTION CONDITIONS. RESTORATION MUST BE TO THE SATISFACTION OF THE RE, SSCM, AND FAA.
9. SITE MUST BE SECURED AT ALL TIMES.
10. GATE ACCESS TO THE SITE WILL BE CONFIRMED AT THE PRE - OFFER MEETING. GATE ACCESS IS SUBJECT TO REVISION
DURING CONSTRUCTION BY THE FAA'S RE, AND SSCM, DUE TO OPERATIONAL REQUIREMENTS.
11. EQUIPMENT MUST BE PROVIDED DURING ALL PHASES OF CONSTRUCTION, TO MAINTAIN AND AVOID ANY BUILD-UP OF
DEBRIS ON SITE. THE REQUIRED CLEANING MEASURES MUST BE PRESENTED, AND DEEMED TO BE ACCEPTABLE TO BOTH
THE FAA'S RE AND THE FACILITY'S SSCM.
SECURITY AND SAFETY NOTES
1. ALL NON-CURRENT CARRYING METALLIC PARTS OF ELECTRICAL EQUIPMENT MUST BE BONDED TOGETHER AND MADE
ELECTRONICALLY CONTINUOUS IN ACCORDANCE WITH FAA-STD-019G.
2. ALL GROUNDING MUST BE SIZED IN ACCORDANCE WITH NFPA 70 (NEC) 2023 AND FAA-STD-019G .
3. GROUND CONNECTION TO ELECTRICAL EQUIPMENT ENCLOSURES, TRANSFORMERS, AND GENERATORS MUST BE
MADE WITH DESIGNATED APPROVED GROUNDING CONNECTIONS.
4. ALL CONDUIT (EMT) ENTERING ELECTRICAL EQUIPMENT MUST CONTAIN A UL LISTED INSULATED-THROAT OR A
GROUNDING BUSHING AT BOTH ENDS AND BE GROUNDED AT THE POINT OF ENTRY TO THE EQUIPMENT.
5. WHEN BONDING TO EQUIPMENT USING FIELD INSTALLED GROUND LUGS, SCRAPE THE PAINT OFF THE MOUNTING
SURFACE TO ENSURE A GOOD BOND (FOR EXAMPLE: WHEN BONDING TO THE E/G FRAME). APPLY A PROTECTIVE
COATING TO MATCH EXISTING FINISH OVER ANY EXPOSED METAL ONCE GROUNDING CONNECTION HAS BEEN
MADE.
GROUNDING NOTES
qwo-18061596-g002
2025-06-24T13:36:01-0500
FEKADU M WAKTOLA
2025-06-24T13:23:32-0500
ALAN RAY STRINGFELLOW
File details come from the government source that posted it. Updated .