Revised QWO ARSR SCHEDULE OF VALUES.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
Removal of Exterior Siding & Refurbishment of Interior at the London, OH ARSR (QWO)
Solicitation number
6973GH-26-R-00078
Issued by

About this file

This is a Schedule of Values spreadsheet for a firm-fixed-price construction contract to remove exterior siding and refurbish the interior of the London, Ohio ARSR (QWO) facility operated by the Federal Aviation Administration. The document provides a detailed cost breakdown template organized into two main phases: Design and Construction, with line items for labor, materials, equipment, and associated costs.

The Design phase includes labor categories such as contractor personnel, superintendent, project manager, office and field personnel across various trades (structural, civil, mechanical, carpenters, electricians, plumbers, painters, inspectors), plus overhead at 10%, expenses, and G&A costs. The Construction phase encompasses project management and quality assurance, general labor, equipment removal and reinstallation, ARSR main building renovation (including demolition of fixtures, walls, and existing vinyl siding; installation of new plumbing, bathrooms, doors, windows, and office space), demolition and replacement of an existing storage building (including asbestos abatement, electrical decommissioning, foundation work, and CMU repair), installation of a new automatic gate opener with electrical and security systems, construction of a new storage building with concrete foundation and electrical service, heavy machinery rental, grounding systems, fire stopping, and site rehabilitation. The spreadsheet includes rows for material costs (with 8.25% tax), labor costs, equipment costs, construction field overhead, profit and bonds, contingency, and a final project funding total. The solicitation (6973GH-26-R-00078) has a proposal due date of August 18, 2026 at 5:00 p.m. CT, with a mandatory site visit scheduled for August 5, 2026 at 9:00 a.m. local time, and all questions must be submitted by August 10, 2026.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QIC RCAG

QWO ARSR - LONDON, OH / REMOVE EXTERIOR SIDING AND REFURBISH INTERIOR
SUBJECT: SCHEDULE OF VALUES
ESTIMATOR:DATE:
DescriptionQuantityMaterial CostsLabor CostsEquipment CostsTotals
No.UnitPer UnitTotalPer UnitTotalPer UnitTotal
PRIME CONTRACTOR COSTS
DESIGN
A. Labor
Contractor (Owner)
Superintendent
Project Manager
Office Personnel
Field Personnel (Structural, Civil, Mechanical, etc.)
General Purpose Laborer(s)
Sanitary Laborer
Carpenter(s)
Carpenter Apprentice(s)
Electrician(s)
Electrician Apprentice(s)
Plumber(s)
Plumber's Apprentice(s)
Painter(s)
Painter(s) Apprentice(s)
Inspector(s)
Labor Subtotal
Overhead (10%)
Subtotal
B. Expenses
Miscellaneous Travel
Reg. Database

Subtotal

C.G & A

DESIGN ESTIMATED GRAND TOTAL

CONSTRUCTION
SCOPE
Project Documentation/Permitting/Environmental
Mobilization (includes porta potty, on site dumpster)
Demobilization
Proj Mgt
QA/QC/Superintendent (Inlcuding other expenses/Overhead)
General Laborers (Including other expenses/Overhead)

Remove, store, & reinstall equipment

ARSR Main Building
Demo fixtures within existing bathroom
Demo fixtures, cabinets(upper & lower) at existing make-shift kitchenin within existing bathroom
Demo existing demising wall in equipment room
Demo front office walls
Remove existing shelves, furniture, etc. as required to perform demolision and construction
Demo existing wood paneling in equipment room
Demo and remove existing vinyl siding around building
Remove and replace front entry door and window at building's office
Remove and replace CMU at existing openings
Rebuild new corner break room next to existing office
Rebuild office at front of building, reinstall electrical, fixtures, etc.
Install new plumbing lines along exterior of building
Install new bathroom fixtures, etc. at renovated bathroom
Install new door, window (with security bars), grounding, and new canopy
Storage Building (Existing to be demolished)
Asbestos abatement of existing storage shed's flooring
Decomision, demolision, and remove all electrical service, panels, cables, etc. back to the source
Saw cut existing asphalt above electrical service cables between storage building and point of service for storage building. Excavate asphalt, sub-grade, and existing (decommisioned) cable. In-fill excavation with select fill in 8-inch loose lifts, compact to 95% standard proctor, place new sub-base material to match existing adjacent sub-base material (type and thickness), replace with new asphalt to at least the same thickness as adjacent existing in-situ asphalt. Compact new asphalt to match final in-situ grad, slope, etc. to match existing asphalt
Demolish existing storage shed's siding, roofing, and superstructure
Demolish existing storage shed's concrete foundation
Partial demo of existing CMU, replace and in-fill holes/openings with new CMU, repoint CMU to match existing in-situ CMU
Automatic Gate Opener (new)
Run electrical and signal wiring from ARSR building to location of new gate opener
Excavate, prep soil, run conduit through form work, provide grounding to existing in-situ fence EES, place reinforcing, and pour concrete
Install new gate opener, modify existing sliding gate, connect security device(s), install card reader with keypad at gate, install keypad/push buttom in ARSR building's front office, test, train FAA personnel as to use of gate opener, provide O&M manual(s), provide warranty information to superintendent
Install new camera(s) as indicated per FAA Order 1600.69D
Storage Building (New)
Locate new location and excavate as required to place new concrete foundation
Locate and determine where and how electrical service will be connected
Place concrete form work, reinforcing, conduit, grounding, etc. for new storage building
Install superstructure for new storage building, install siding, roofing, windows, and doors
Install and connect all new electrical fixtures, etc.(all power must be installed using 3/4" EMT with only compression type fittings. Signal wiring may be installed using 1/2" EMT with only compression type fitting)

Heavy Machinery (Forklift/excavator/etc.)

Lull/Shipping/Freight

New Earth Electrode System & grounding

Fire stopping & Joint Sealants

Rehabilitation of gravel/road/site conditions

CONSRUCTION ESTIMATED GRAND TOTAL

Tax on Material(8.25%)
Subtotal:
Construction Field Overhead
Subtotal:
Profit & Bonds
CONSTRUCTION PROJECT TOTAL:
Contingency
PROJECT FUNDING TOTAL:
PREPARED BY:
SIGNATURE:
DATE: