QWO ARSR SCHEDULE OF VALUES.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Removal of Exterior Siding & Refurbishment of Interior at the London, OH ARSR (QWO)
Solicitation number
6973GH-26-R-00078
Issued by

About this file

This is a Schedule of Values spreadsheet for a firm-fixed-price construction contract to remove exterior siding and refurbish the interior at the London, Ohio ARSR (QWO) facility operated by the Federal Aviation Administration. The document provides a template for contractors to submit detailed pricing broken down by labor, material, and equipment costs across multiple work categories.

The construction scope encompasses design services (project manager, engineers, CADD technician), project documentation and permitting, mobilization and demobilization, demolition of the existing shelter and associated equipment, procurement and installation of a 12'x16' concrete shelter with full finishes and HVAC systems, installation of a 50-foot self-supporting tower, removal and reinstallation of RCAG equipment, LPG tank relocation with new foundation and grounding, new electrical equipment and waveguide bridge, perimeter fencing, temporary security measures, emergency power generation, fiber telecommunications equipment, fire stopping, and site restoration. The spreadsheet includes line items for overhead (10%), general and administrative costs, material taxes (8.25%), construction field overhead, profit and bonds, and contingency. Contractors must submit proposals by 5:00 p.m. CT on July 31, 2026, to Jason.A.Fox@faa.gov, and must be registered in the System for Award Management (SAM.gov) prior to the deadline. Questions regarding the scope of work must be submitted in writing by 5:00 p.m. CT on July 22, 2026.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QIC RCAG

QWO ARSR - LONDON, OH / REMOVE EXTERIOR SIDING AND REFURBISH INTERIOR
SUBJECT: SCHEDULE OF VALUES
ESTIMATOR:DATE:
DescriptionQuantityMaterial CostsLabor CostsEquipment CostsTotals
No.UnitPer UnitTotalPer UnitTotalPer UnitTotal
PRIME CONTRACTOR COST
DESIGN
A. Labor
Project Manager
Civil Engineer
Structural Engineer
Electrical Engineer
Environmental Engineer
CADD Technician
Labor Subtotal
Overhead (10%)
Subtotal
B. Expenses
Miscellaneous Travel
Reg. Database

Subtotal

C. G & A

DESIGN ESTIMATED GRANED TOTAL

CONSTRUCTION
SCOPE
Project Documentation/Permitting/Environmental
Mobilization (includes porta potty, on site dumpster)
Demobilization
Proj Mgt
QC/QA/Superintendent (Inlcuding other expenses/Overhead)
General Laborers (Including other expenses/Overhead)
Demolition of existing Shelter, Tower, Electrical Equipment, Security Fence, all grounding, TELCO, & Associated Accessories
Procure, furnish, and install 12'x16' concrete shelter (all finishes, lighting, dors, HVAC, etc.)
Remove, store, & reinstall RCAG equipment
Procure, furnish, and install 50' Self Supporting Tower
CMU wall for propane tank
Heavy Machinery (Forklift/excavator/etc.)
Crane/Shipping/Freight
Remove & Store LPG Tank, reinstall with new accessories, Demo TANK Foundation
Procure, furnish, and install new elevated platform for tank
New Earth Electrode System & grounding
New electrical equipment (not in shelter)
New metal handrailing for platform
New waveguide bridge
Procure, furnish, and install new perimeter fencing
Provide and install temp security fencing
Provide power and TELCO for temp trailer, provide & install 20KW emergency generator, ATS, and fuel tank
Provide and install new fiber TELCO equipment
Fire stopping & Joint Sealants
Rehabilitation of gravel/road/site conditions

CONSRUCTION ESTIMATED GRAND TOTAL

Tax on Material(8.25%)
Subtotal:
Construction Field Overhead
Subtotal:
Profit & Bonds
CONSTRUCTION PROJECT TOTAL:
Contingency
PROJECT FUNDING TOTAL:
PREPARED BY:
SIGNATURE:
DATE: