QUALIFICATION_SUBMITTAL_FORM.pdf
PDF 78 KB Posted
- Attached to
- Solid Waste Industrial Waste Treatment Facility (IWTF) Intake Pump Station (IPS) PID: 002423A
- Solicitation number
- 23-0273-ITB-CP
- Issued by
- Pinellas County, Florida
About this file
The Qualification Submittal Form is a document from the Florida Department of Transportation (FDOT) for contractors seeking to bid on a project related to the Solid Waste Industrial Waste Treatment Facility Intake Pump Station. The form is designed for contractors who are not currently pre-qualified with FDOT and requires detailed documentation to demonstrate project capabilities. Contractors must provide information on four similar past projects, including project descriptions, owner and project manager contact details, project award and final amounts, design estimates, change orders, and scheduled and actual completion dates. The form also requires contractors to specify their work type qualifications, which include categories such as Bascule Bridge, Fixed Bridge, Roofing, Bridge Repair, Marine, Building, Mechanical, Electrical, Water and Sanitary Sewer, and Road/Street/Storm Sewer.
The qualification process involves a comprehensive background check and review for non-pre-qualified contractors. Bidders must submit a bonding letter or parent guarantee indicating the maximum budget amount, complete a vendor information form, confirm project work types, provide detailed project experience, and include a minimum of three reference letters from companies for whom they have completed similar projects. The form includes a section for vendor information and officer/director details, requiring comprehensive company and leadership information. Failure to meet any of the specified conditions will result in disqualification from moving forward in the bidding process. The form is part of a structured pre-qualification process designed to ensure contractors have the necessary experience, financial stability, and technical capabilities to successfully complete the project.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALIFICATION SUBMITTAL FORM
STEP 1
Part A
If you are currently a pre-qualified construction contractor with FDOT in the applicable work type, please check box and fill out Vendor Information Form and return with signed Part A pages below.
I am Pre-qualified with FDOT in one or more of the work class(s) as referenced in the Special Conditions Section.
Signature by Contractor for Part A Only: ___________________________________________________
If you are not pre-qualified with FDOT, please complete PART B and include all Qualification Forms.
Part B
Applicable only for contractors who are not pre-qualified with FDOT in in one or more of the work class(s) as referenced in the Special Conditions Section.
The invitation to bid for this Project requires that this qualification submittal be included with the proposal and completed in its entirety.
A component of the Pre-Qualification of Bidder process is background check and review. If you are not currently pre-qualified with FDOT please provide the following documentation and include with Qualification Submittal Forms by Step One due date referenced in the Notice Section.
1. Provide a bonding letter from surety or a letter of parent guarantee indicating at a minimum the maximum amount of the budget estimate referenced in the Notice Section.
2. Please complete and return the Vendor Information Form.
3. Confirm Project Work Type(s) (outlined below – check appropriate box(es)
4. Provide your experience on Qualification Submittal Forms below outlining projects of a similar size and scope.
5. Provide a minimum of three reference letters from companies that you have performed projects of a similar size and scope.
Work Types your company is qualified to perform - *Check all boxes that apply
Project Work Types
Bascule Bridge Fixed Bridge Roofing
Bridge Repair Marine Well Drilling
Building Mechanical Water and Sanitary Sewer
Electrical Road, Street, Storm Sewer
**If any of the above conditions are not met, your company will be disqualified from moving forward with Step Two.**
Applicable only for contractors who are not pre-qualified with FDOT. The invitation to bid for this Project requires that this qualification submittal be included with the proposal and completed in its entirety.
NOTE: BIDDER SHALL SUBMIT QUALIFICATION SUBMITTAL ON THE FORM PROVIDED HEREIN
TO PROVIDE THE QUALIFICATION REQUIREMENTS AS SPECIFIED IN
Company Name: Please include below
Project 1 (of similar type) Description
Owner of Project - Contact Information
Name
Address
Telephone Number and Email Address:
Project Manager - Contact Information
Address
Telephone Number and Email Address:
Project Award Amount: $
Final Project Total Amount: $
Design Professional/Engineer Estimate:
$ Change Orders $
Scheduled Completion Date
Actual Completion Date
QUALIFICATION SUBMITTAL FORM (continued)
Project 2 (of similar type) Description
Project Manager - Contact Information
Address
Telephone Number and Email Address:
Project Award Amount: $
Final Project Total Amount: $
Design Professional/Engineer
Project 3 (of similar type) Description
Project Manager- Contact Information
Address
Telephone Number and Email Address:
Project Award Amount: $
Final Project Total Amount: $
Design Professional/Engineer
Project 4 (of similar type) Description
Project Manager- Contact Information
Address
Telephone Number and Email Address:
Project Award Amount: $
Final Project Total Amount: $
Design Professional/Engineer
Applicable only for contractors who are not pre-qualified with FDOT
The invitation to bid for this Project requires that this qualification submittal be included with the proposal and completed in its entirety.
Vendor Information Firm Name:
Street Address:
City:
State:
ZIP:
Additional Info:
Officer/Director Information
Officer/Director/Member:
Title:
DOB:
SSN:
Notes:
Officer/Director/Member
Additional Information: (On Vendor or Contract Requirements)
File details come from the government source that posted it. Updated .