Appendix_6-_WTE_Record_Dwgs_(For_Reference_Only).pdf

PDF 76 MB Posted

Attached to
Solid Waste Industrial Waste Treatment Facility (IWTF) Intake Pump Station (IPS) PID: 002423A
Solicitation number
23-0273-ITB-CP
Issued by
Pinellas County, Florida

About this file

The file "Appendix_6-WTE_Record_Dwgs(For_Reference_Only).pdf" appears to be a reference drawing for a Solid Waste Industrial Waste Treatment Facility (IWTF) Intake Pump Station (IPS) project for a county in Florida. The project involves upgrading the existing intake pump systems at the Bridgeway Acre Landfill's Industrial Water Treatment Plant (IWTP), which currently operates below full design capacity and has reached the end of its operational lifespan. The primary objective is to install new intake pump systems with enhanced safety features to improve water treatment operations and support the Waste-to-Energy Plant's cooling tower water supply.

The project is focused on addressing operational inefficiencies and infrastructure limitations within the county's water treatment infrastructure. While specific pricing details are not provided in the available documentation, the project aims to mitigate disruptions to water treatment processes by replacing outdated pump systems. The upgrade is critical for maintaining continuous water supply to the Waste-to-Energy Plant and ensuring reliable industrial water treatment capabilities. The reference drawings suggest a technical approach to modernizing the existing pump station infrastructure, with an emphasis on operational reliability and safety improvements.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .