Plans.pdf
PDF 10 MB Posted
- Attached to
- Solid Waste Industrial Waste Treatment Facility (IWTF) Intake Pump Station (IPS) PID: 002423A
- Solicitation number
- 23-0273-ITB-CP
- Issued by
- Pinellas County, Florida
About this file
These are engineering design plans prepared by Hazen and Sawyer for the Pinellas County Solid Waste Department's Industrial Water Treatment Plant (IWTP) Intake System Improvements project, located at the Bridgeway Acres Landfill in Clearwater, Florida. The project involves replacing the existing intake pump systems in Pond A with new pumps, piping, a floating intake system with a wedge wire screen, winch stations, pipe supports, electrical upgrades, and associated site improvements. The design documents include comprehensive civil, structural, mechanical, and electrical drawings detailing the project's scope, including site plans, demolition details, pump pad configurations, pipe routing, electrical one-line diagrams, and mechanical system layouts.
The project aims to upgrade the current intake system to restore full design capacity and extend operational lifespan, with an estimated construction budget reflected in the detailed engineering drawings. The design incorporates multiple technical considerations, including temporary cofferdams, slope stabilization, erosion control measures, and specific requirements for working in and around the existing pond environment. The plans specify use of materials such as stainless steel piping, ductile iron pipes, aluminum framing, and specialized structural supports. The project will require careful coordination with existing site utilities, environmental protection measures, and adherence to specific construction and safety guidelines outlined in the comprehensive set of engineering drawings.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lake
I-
PROJECT LOCATION
th
S t N
110th Ave N
GANDY BLVD N
PID 002423A
PINELLAS COUNTY SOLID WASTE
INDUSTRIAL WATER TREATMENT PLANT
INTAKE SYSTEM IMPROVEMENTS
NOVEMBER 2022
H :\4
-0
P in el la s C ou nt y
IW
TP
\D ra w in gs
\G
EN
\G -1
.d w g, N ov
1,
- 2 :2
7p m
HAZEN AND SAWYER
1000 NORTH ASHLEY DRIVE, SUITE 1000
TAMPA, FLORIDA 33602
AN
DR
EW
J ON COLEMAN
PROFESS I ONA L ENG I N
EE
R
F L O R I D A
L I C E NS E
STATE OF
No. 70650
DA
N I EL B . SCHMIDT
PROF ESS I ONA L ENG I N
EE
R
F L O R I D A
L I C E NS E
STATE OF
No. 40233
STATE OF
No. 67253
L I C E N S E
ED
WARD T.McMURR
YA
THE ABOVE NAMED PROFESSIONAL
ENGINEER SHALL BE RESPONSIBLE FOR
THE SHEETS BELOW IN ACCORDANCE WITH RULE
61G15-23.004, F.A.C. THIS SHEET HAS
BEEN DIGITALLY SIGNED AND SEALED
USING A DIGITAL SIGNATURE. PRINTED
COPIES OF THIS DOCUMENT ARE NOT
CONSIDERED SIGNED AND SEALED AND
THE DIGITAL SIGNATURE MUST BE
VERIFIED ON ANY ELECTRONIC COPIES.
THE ABOVE NAMED PROFESSIONAL
ENGINEER SHALL BE RESPONSIBLE FOR
THE SHEETS BELOW IN ACCORDANCE WITH RULE
61G15-23.004, F.A.C. THIS SHEET HAS
BEEN DIGITALLY SIGNED AND SEALED
USING A DIGITAL SIGNATURE. PRINTED
COPIES OF THIS DOCUMENT ARE NOT
CONSIDERED SIGNED AND SEALED AND
THE DIGITAL SIGNATURE MUST BE
VERIFIED ON ANY ELECTRONIC COPIES.
THE ABOVE NAMED PROFESSIONAL
ENGINEER SHALL BE RESPONSIBLE FOR
THE SHEETS BELOW IN ACCORDANCE WITH RULE
61G15-23.004, F.A.C. THIS SHEET HAS
BEEN DIGITALLY SIGNED AND SEALED
USING A DIGITAL SIGNATURE. PRINTED
COPIES OF THIS DOCUMENT ARE NOT
CONSIDERED SIGNED AND SEALED AND
THE DIGITAL SIGNATURE MUST BE
VERIFIED ON ANY ELECTRONIC COPIES.
TAMPA, FLORIDA 33602
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MEETING ALL CONDITIONS AND
REQUIREMENTS OF ALL PERMITS AND ALL GOVERNING FEDERAL, STATE, AND
LOCAL AGENCIES.
2. EXISTING UNDERGROUND FACILITIES, STRUCTURES, AND UTILITIES HAVE BEEN
LOCATED FROM ENGINEER PROVIDED RECORD DRAWINGS AND THEIR LOCATIONS
MUST ONLY BE CONSIDERED AS APPROXIMATE. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO FIELD VERIFY THE LOCATIONS OF ALL EXISTING UTILITIES
SHOWN ON THE PLANS AND ANY OTHER UTILITIES WHICH MAY NOT BE SHOWN
ON THE PLANS. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES IN THE
AREA AND COORDINATE WITH FLORIDA SUNSHINE ONE CALL AT LEAST 72 HOURS
PRIOR TO BEGINNING CONSTRUCTION. CALL FLORIDA SUNSHINE STATE ONE CALL
CENTER AT 1-800-432-4770. ALL COORDINATION AND REQUIRED UTILITY
COMPANY TEMPORARY PROTECTION SHALL BE AT THE CONTRACTOR'S EXPENSE.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE UNINTERRUPTION OF
SERVICE AND REPLACEMENT OF DAMAGED UTILITIES.
3. THE CONTRACTOR SHALL PROVIDE ALL DEWATERING EQUIPMENT NECESSARY TO
KEEP ALL EXCAVATIONS DRY AND SHALL PROVIDE ALL NECESSARY SHEETING,
SHORING, AND BRACING NECESSARY TO PROTECT ADJACENT STRUCTURES,
UTILITIES, AND PAVEMENT, OR TO MINIMIZE TRENCH WIDTH, ALL IN
ACCORDANCE WITH THE PLANS AND SPECIFICATIONS AND WHICH ARE REQUIRED
TO COMPLETE CONSTRUCTION.
4. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER'S CONSTRUCTION
MANAGER REGARDING ANY CONFLICTS OR DISCREPANCIES ARISING DURING
CONSTRUCTION.
5. ALL UTILITIES SHALL BE KEPT IN OPERATION EXCEPT WITH THE EXPRESS
WRITTEN CONSENT OF THE UTILITY ENGINEER. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO PRESERVE EXISTING UTILITIES AND ANY AND ALL DAMAGE
TO EXISTING UTILITIES AS A RESULT OF THE CONTRACTOR'S ACTIONS SHALL BE
REPAIRED AT THE CONTRACTOR'S EXPENSE.
6. CONNECTIONS TO EXISTING FACILITIES SHALL BE DONE IN THE PRESENCE OF
THE UTILITY ENGINEER AND THE CONSULTANT. THE CONTRACTOR SHALL GIVE AT
LEAST 2 WEEKS NOTICE TO ALL PARTIES CONCERNED PRIOR TO BEGINNING
WORK.
7. ALL ADDITIONAL EXCAVATION AND DEMOLITION MATERIAL SHALL BE DISPOSED
OF BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE ENGINEER AND IN
ACCORDANCE TO FEDERAL, STATE, AND ENGINEER REGULATION.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH THE FLORIDA
TRENCH SAFETY ACT, 90-96, LAWS OF FLORIDA, EFFECTIVE OCTOBER 1, 1990,
THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION EXCAVATION SAFETY
STANDARDS, 29 CFR 1926.650, SUBPART P, AS AMENDED. THE CONTRACTOR
SHALL INCLUDE IN THE TOTAL BID PRICE, ALL COSTS FOR COMPLIANCE WITH
THESE REGULATIONS.
9. ALL DISTURBED AREAS SHALL BE RESTORED TO THEIR ORIGINAL CONDITION OR
BETTER UNLESS OTHERWISE NOTED.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING OR REPLACING ANY
ITEMS DAMAGED BY THE CONTRACTOR SUCH AS DRIVEWAYS, MAILBOXES,
STREET SIGNS, FENCES, ETC., AS DEEMED NECESSARY BY THE
ENGINEER,AUTHORITY AND/OR CONSULTANT.
11. THE CONTRACTOR SHALL BE REQUIRED TO OBTAIN ALL APPLICABLE PERMITS,
INCLUDING TREE REMOVAL PERMITS (IF APPLICABLE).
12. THE CONTRACTOR'S WORK SHALL BE SCHEDULED BETWEEN 7:00 A.M. AND 5:00
P.M. WITH A MAXIMUM OF 10 HOURS PER DAY AND 5 DAYS PER WEEK. SHOULD
THE CONTRACTOR REQUIRE MORE WORK HOURS TO MAINTAIN THE CONTRACT
SCHEDULE OR TO COORDINATE A CONNECTION DURING LOW SEWAGE FLOWS, A
REQUEST SHALL BE SUBMITTED IN WRITING TO THE CONSULTANT STATING THE
REASONS WHY AND HOW MUCH TIME IS NEEDED. ALSO, THE CONTRACTOR SHALL
REQUEST IN WRITING TO THE CONSULTANT WITH A MINIMUM OF SEVENTY-TWO
(72) HOURS ADVANCE NOTICE, OF ANY PLANS FOR WORKING ON ANY WEEKEND
DAYS OR OBSERVED NATIONAL HOLIDAYS.
13. THE CONTRACTOR SHALL PROVIDE ACCESS FOR TRAFFIC AT ALL TIMES DURING
CONSTRUCTION.
14. NOTIFY THE CONSULTANT 48 HOURS PRIOR TO COMMENCEMENT OF
OPEN-CUTTING ANY ENGINEER ROAD.
15. THE CONTRACTOR SHALL COORDINATE AND SCHEDULE TIE-INS T0 MINIMIZE
DOWNTIME OF THE SYSTEM.
16. ALL EXCAVATED MATERIAL SHALL BE REMOVED FROM ROAD PAVEMENTS,
DRIVEWAYS, SIDEWALKS AND DRAINAGE SWALES AND EXISTING DRAINAGE
PATTERNS RESTORED AT THE COMPLETION OF WORK EACH DAY.
17. ALL FUGITIVE DUST SHALL BE CONTROLLED ON SITE. ONLY AREAS SCHEDULED
FOR IMMEDIATE CONSTRUCTION SHALL BE CLEARED OR STRIPPED OF
VEGETATION. WATERING, APPLICATION OF CALCIUM CHLORIDE OR OTHER PRIOR
APPROVED MEANS OF DUST CONTROL SHALL BE EMPLOYED TO PREVENT THE
EMANATION OF DUST FROM THE SITE. PERMANENT GRASSING, LANDSCAPING AND
OTHER SITE WORK SHALL BE INCORPORATED AS SOON AS POSSIBLE.
18. ALL WORK TO BE PERFORMED FOR THE COMPLETION OF THIS PROJECT SHALL BE
CONSTRUCTED ACCORDING TO THE BEST PRACTICES OF THE INDUSTRY AND IN
ACCORDANCE WITH APPLICABLE FEDERAL, STATE, ENGINEER AND/OR CITY
CODES, ORDINANCES, STANDARDS AND PERMIT CONDITIONS.
19. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING RECORD DRAWING
INFORMATION INCLUDING, BUT NOT LIMITED TO, FINISHED GRADE ELEVATIONS,
TIES TO SEWER LINES, VALVES, BENDS, AND ELEVATIONS OF PIPES WHERE
DEPTH OF COVER VARIES FROM DESIGN, STRUCTURE TOP AND INVERT
ELEVATIONS, PLUS LOCATIONS, DIMENSIONS AND ELEVATIONS OF ALL OTHER
CONSTRUCTION COMPONENTS WHICH VARY FROM THE DESIGN..
20. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS AND ASSUMES ALL RISK
FOR UNDERWATER CONSTRUCTION. POND IS KNOWN TO HAVE ALLIGATORS AND
OTHER WILDLIFE.
21. CONTRACTOR SHALL REFERENCE DRAWINGS FOR "EMBANKMENT STABILIZATION
BRIDGEWAY ACVES LANDFILL POND A (REBID 2)" FOR LOCATION OF SHEET PILE
WALL CONSTRUCTION AND TIE BACK LOCATIONS. CONTRACTOR SHALL VERIFY
TIEBACK LOCATIONS IN THE FIELD.
22. THERE IS AN EXISTING CLAY LINER BELOW THE BOTTOM OF THE POND WITH THE
TOP OF THE CLAY LINER AT APPROXIMATELY EL. -7.5 FEET BASED ON PREVIOUS
GEOTECHNICAL BORINGS PERFORMED AT THE SITE, LOCATED ON LAND, EAST OF
THE POND. (SEE GEOTECHNICAL REPORTS PROVIDED AS REFERENCE FILES TO
THESE CONTRACT DOCUMENTS) THIS CLAY LINER PROVIDES A CONFINING LAYER
FOR THE POND AND IT CANNOT BE PENETRATED. CONTRACTOR SHALL TAKE ALL
PRECAUTIONS NECESSARY TO AVOID ANY CONTACT OR DAMAGE TO THE EXISTING
POND CLAY LINER. CONTRACTOR SHALL VERIFY THE DEPTH BELOW THE POND
BOTTOM TO THE CLAY LINER AND SHALL ACCOUNT FOR THE LINER IN THE DESIGN
OF THE COFFERDAM SYSTEMS SHOWN ON SHEET C-2. IF PENETRATION INTO THE
CLAY LINER IS DEEMED TO BE NECESSARY, INSTALLATION AND REPAIR
PROCEDURES FOR THE TEMPORARY COFFERDAM SYSTEMS SHALL BE
COORDINATED WITH, AND APPROVED BY, FDEP.
23. CONTRACTOR SHALL ASSUME WATER LEVEL BASED ON CURRENT CONDITIONS
DURING PRE-BID SITE EVALUATION FOR BIDDING CONSTRUCTION EFFORTS THAT
INCLUDE TEMPORARY COFFERDAM SYSTEMS.
GENERAL & CIVIL NOTES: ENVIRONMENTAL PROTECTION NOTES:
1. CONTRACTOR SHALL OBTAIN NPDES PERMITS AS REQUIRED BY
PROPOSED SITE ACTIVITIES. THIS SHALL INCLUDE, BUT NOT BE
LIMITED TO THE CONTRACTOR SHALL DEVELOP AND IMPLEMENT A
STORMWATER POLLUTION PREVENTION PLAN IN COMPLIANCE WITH
NPDES STORMWATER PERMIT AND ENGINEER REQUIREMENTS.
2. CONTRACTOR SHALL COMPLETE AND SUBMIT TO THE ENGINEER (FOR
REVIEW AND COMMENT) A DETAILED PROJECT-SPECIFIC
PREVENTION, CONTROL AND ABATEMENT OF EROSION AND WATER
POLLUTION PLAN THAT ADDRESSES EROSION CONTROL,
SEDIMENTATION CONTROL AND DEWATERING FOR EACH PHASE OF
CONSTRUCTION. THE PROJECT-SPECIFIC PLAN SUBMITTED BY THE
CONTRACTOR MUST BE CONSISTENT WITH THE CONSTRUCTION
CONTRACT DOCUMENTS, APPLICABLE LOCAL, STATE, AND FEDERAL
REGULATIONS. THE PLAN SHALL DEMONSTRATE THE METHODOLOGY
FOR MINIMIZING THE AMOUNT OF AREA DISTURBED AND SOIL
EXPOSED AT ANY ONE TIME (PHASING) AND THE CORRESPONDING
EROSION CONTROL MEASURES.
3. ALL WATER COLLECTED AND PUMPED DURING DEWATERING
ACTIVITIES SHALL BE DISPOSED OF IN UNDISTURBED UPLAND AREAS
INTO DOUBLE STAKED HAY BALES. DISCHARGE LOCATIONS SHALL BE
OVER UNDISTURBED SOIL, A MINIMUM OF 75 FEET FROM THE
NEAREST WATER BODY, WETLAND AREA, OR INLET TO ALLOW FOR
MAXIMUM OVERLAND FILTRATION OF SOIL PARTICLES.
4. TEMPORARY STOCKPILES SHALL NOT BE LOCATED ADJACENT TO
UNDISTURBED WETLANDS WHERE SEDIMENTATION FROM
STOCKPILES MAY CAUSE DAMAGE TO WETLAND. ADDITIONALLY, SILT
BARRIERS SHALL CONTINUOUSLY AND FULLY ENCIRCLE ALL
STOCKPILES WHICH WILL REMAIN FOR LONGER THAN 24 HOURS TO
CONTAIN MATERIALS WITHIN A REASONABLY CONFINED AREA.
5. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RETURNED
TO THE EXISTING GRADE, PROFILE, AND CROSS SECTION UNLESS
OTHERWISE NOTED. MATCH EXISTING ELEVATIONS AT
BOUNDARIES/LIMITS OF CONSTRUCTION ACTIVITIES.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE MAINTENANCE
OF THE EXISTING DRAINAGE SYSTEM WITHIN THE LIMITS OF THE
PROJECT AREA, FOR THE DURATION OF THE PROJECT. NO
ADDITIONAL PAYMENT WILL BE MADE FOR THE WORK INVOLVED.
7. THE CONTRACTOR SHALL SUBMIT A NOTICE OF INTENT OF
CONSTRUCTION COMMENCEMENT AND NOTICE OF TERMINATION TO
APPLICABLE AGENCIES AND MONITOR CONSTRUCTION IN
ACCORDANCE WITH NPDES STORMWATER PERMIT REQUIREMENTS.
8. CONTRACTOR SHALL SUBMIT A COMPLETED AND SIGNED PINELLAS
ENGINEER HABITAT PERMIT APPLICATION, AND SUPPORTING
DOCUMENTS, TO INCLUDE THE CONTRACTOR-GENERATED PROJECT
SPECIFIC PREVENTION, CONTROL AND ABATEMENT OF EROSION AND
WATER POLLUTION PLAN (WHICH INCLUDES THE PROPOSED
CONSTRUCTION PHASING AND EROSION CONTROL LAY OUT FOR
PHASING), THE SWPPP, AND THE DEWATERING PLAN FOR INCLUSION
IN THE PINELLAS ENGINEER HABITAT PERMIT (LAND DEVELOPMENT
CODE CH. 166 ENVIRONMENTAL AND NATURAL RESOURCE
PROTECTION ARTICLE II HABITAT MANAGEMENT & LANDSCAPING
DIVISION 2: PERMITS). THE CONTRACTOR MUST NOT COMMENCE
EARTH-MOVING OR LAND CLEARING PRIOR TO A HABITAT PERMIT
BEING ISSUED. COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY
PRIOR TO ISSUANCE OF A HABITAT PERMIT IS A VIOLATION OF THE
PINELLAS ENGINEER LAND DEVELOPMENT CODE AND IS SUBJECT TO
ENFORCEMENT ACTION.
1. ALL DEMOLISHED MATERIALS SHALL REMAIN ON SITE AND THE
PROPERTY OF THE ENGINEER. CONTRACTOR TO COORDINATE WITH
THE ENGINEER FOR DESIRED LOCATION OF MATERIALS.
2. NO EXCAVATED MATERIALS SHALL LEAVE THE SITE. CONTRACTOR
SHALL PLACE MATERIAL AT ENGINEER DETERMINED DUMPING
LOCATION.
DEMOLITION AND SALVAGE:GENERAL & CIVIL NOTES:(CONT'D)
1. CONTRACTOR SHALL PROVIDE TEMPORARY TRAFFIC CONTROL FOR
WORK PERFORMED NEAR 114TH AVENUE AND 34TH STREET PER
SHEET C-5.
2. FOR EACH INSTANCE WHERE TEMPORARY TRAFFIC CONTROL IS
REQUIRED, CONTRACTOR SHALL SUBMIT NOTICE IDENTIFYING
STARTING DATE, NATURE OF WORK, AND DURATION OF TEMPORARY
TRAFFIC CONTROL AT LEAST 2 WEEKS PRIOR TO TEMPORARY TRAFFIC
CONTROL SYSTEMS BEING IMPLEMENTED.
TEMPORARY TRAFFIC CONTROL NOTES:
TAMPA, FLORIDA 33602
STORM MANHOLE
UTILITY BOX
MITERED END SECTION (MES)
POWER POLE
LIGHT POLE
GUY WIRE & ANCHOR PIN
HEDGES
FENCE, GATE
TREE AS SPECIFIED
COMBINATION POLE
TELEPHONE POLE
ELECTRICAL MANHOLE
TELEPHONE MANHOLE
GUY POLE & WIRE
LEGEND
WATER SURFACECONCRETE
CONC. FILL OR GROUT
GRADE OR EARTH SAND
ASPHALT PAVING GRAVEL
SANITARY SEWER
ELEC UNDER GROUND
STORM DRAIN
TELE UNDER GROUND
FORCEMAIN
UGC
UE UE UE
SD
SS
RECLAIMED WATER
YARD PIPING LINE TYPES
EXISTING
CONTOUR LINE
PROPOSED
BUILDING
/// /// ///SILT FENCE
DIRECTION OF STORM FLOW
SWALE
CIVIL
ELEC OVER HEAD OHE
GAS GAS
TELE OVER HEAD OHC
CHAIN LINK FENCE
BOX CULVERT
CENTER LINE
x x x
FLOW ARROW
FLARED END SECTION (FES)
PROPERTY LINE
SANITARY SEWER MANHOLE S
MATERIALS
FIRE HYDRANT
MANHOLE
WATER METER
EXISTING
SPOT ELEVATION
CONTOUR ELEVATION
WATER LINE W W
CABLE UNDER GROUND CATV
RIGHT-OF-WAY/EASEMENT
PROPOSED
(OK) OAK (PLM) PALM (PN) PINE
UTILITY HANDHOLE
TEMPORARY BENCHMARK
AIR RELEASE VALVE
SCHEDULESCH
VERT VERTICAL
GENERAL
DI/DIP DUCTILE IRON PIPE
PIPING MATERIAL
EXIST, EXST EXISTING
DIA
DIM DIMENSION
DIAMETER
VALVES, FITTINGS, ETC.
MINIMUM
NOT TO SCALE
NUMBER
NTS
NO
MIN
MAINTENANCE HOLE
MAXIMUMMAX
MH
TYP TYPICAL
TEMP TEMPORARY
LINEAR FEETLF
SPECIFICATION
STAINLESS STEEL
SPEC
SS
SQ SQUARE
SECT
SHT
SECTION
SHEET
REQ'D REQUIRED
GRADEGR
PROPERTY LINEP/L
RELOC RELOCATE
WM WATER MAIN
FM FORCE MAIN
FLOW STREAM
SS SANITARY SEWER
WV WATER VALVE
ABBREVIATIONS
BFP BACKFLOW PREVENTER
PVC POLYVINYLCHLORIDE
STATIONSTA.
LEFTLT
RESTRAINED JOINTRJ
PAVEMENT
W/ WITH
C CENTER LINEL
EOP EDGE OF PAVEMENT
BOC BACK OF CURB
SOD
HDPE HIGH DENSITY POLYURETHANE
TSP TWISTED SHIELDED PAIR
GROUT REVETMENT GEOWEB RAMP
VAL VALVE
B/C BOUNDARY CONDITIONS
SPT-04
SPT-03
SPT-02
SPT-01
HAZEN AND SAWYER
1000 NORTH ASHLEY DRIVE, SUITE 1000
TAMPA, FLORIDA 33602
1"=20'
SITE PLAN
RIP RAP
SEA WALL
STEEL GUARD RAIL
WOODEN POLE
W/ SIGNAL
LEVEL GAUGE
SODIUM
HYPOCHLORITE
FEED PIPING
COMMUNICATION
JUNCTION BOX (TYP)
ELECTRICAL
JUNCTION BOX (TYP)
ELECTRICAL PANELS
TEMPORARY DIESEL
INTAKE PUMP
INFLUENT PUMP STATION
CONTROL PANEL AND
LOCAL DISCONNECT
18" 90° M.J. BEND (AT BOTTOM OF POND)
BUOYANT FLOW
CONTROL DEVICE
18" M.J. TEE (AT BOTTOM OF POND)
FIBERGLASS/METAL
FENCE AROUND
DRAINAGE
STRUCTURE
INFLUENT PUMP STATION
WET WELL
INFLUENT
PUMP STATION
ELECTRICAL
BUILDING
EXISTING 24"
INFLUENT
EXISTING 12" DIP
TEMPORARY INTAKE
FOR DIESEL PUMP
(APPROXIMATE
LOCATION)
LIGHT
POLE
10 20'020
1"=20'-0"
CONTRACTOR LAYDOWN AREA
140'
EXISTING
RETAINING WALL
APPROXIMATE BORING LOCATION
LEGEND:
APPROXIMATE CONTRACTOR
LAYDOWN AREA
SURVEY NOTES:
1. SURVEY PREPARED BY: OMNI
COMMUNICATIONS, LLC. LICENSED SURVEYING
AND MAPPING BUSINESS NUMBER 8053. 8509
BENJAMIN ROAD, SUITE E, TAMPA, FL 33634
2. SECTION/TOWNSHIP/RANGE: SECTION(S) 15,
TOWNSHIP 30S, RANGE 16E
3. TYPE OF SURVEY: TOPOGRAPHIC SURVEY
(5J-17.050(10)(K))
4. LAST DATE OF FIELD SURVEY: OCTOBER 29, 2019
5. PROJECT CONTROL: HORIZONTAL CONTROL WAS
ESTABLISHED FOR THIS PROJECT BY UTILIZING
THE FLORIDA PERMANENT REFERENCE
NETWORK (FPRN) BASE STATIONS: FLD7, FLIB,
AND STPT. VERTICAL CONTROL USED FOR THIS
PROJECT WAS: TBM100, TBM101 AND TBM 102.
THESE POINTS WERE ESTABLISHED BY CARDNO
FROM THE “PINELLAS COUNTY SOLID WASTE
MANAGEMENT” PROJECT.
6. PROJECT DATUM & PROJECTION:
A. HORIZONTAL DATUM: NORTH AMERICAN
DATUM OF 1983 2011 ADJUSTMENT (NAD83
2011)
B. VERTICAL DATUM: NORTH AMERICAN
VERTICAL DATUM OF 1988 (NAVD88)
C. PROJECTION: FLORIDA STATE PLANE
COORDINATE SYSTEM WEST ZONE (FL83W)
7. FOR ADDITIONAL INFORMATION SEE SURVEY
REPORT.
THIS LINE DEFINES THE EXTENT OF THE
WORK AREA FOR THE PROJECT.
CONTRACTOR SHALL CONFINE THEIR
EFFORTS TO THIS AREA, UNLESS
COORDINATED WITH THE ENGINEER.
CONTRACTOR TO COORDINATE WITH
ENGINEER REGARDING USE OF ACCESS
ROADS FOR GETTING TO/FROM AND
AROUND THE WORK AREA.
GraphData
GraphData
GraphData
GraphData
N:1288343.3493 E:436414.2777
WINCH STATION
(SEE STRUCTURAL SHEETS)
N:1288120.1310 E:436202.8766
N:1288192.1752 E:436398.1686
N:1288174.1752 E:436378.4186
N:1288583.9562 E:436228.8248
N:1288343.4983 E:436429.7123
N:1288111.4052 E:436190.1442
N:1288571.3234 E:436237.6907
GraphData
GraphData
GraphData
GraphData
GraphData
-1
-1
-1
-1
8 7
HAZEN AND SAWYER
1000 NORTH ASHLEY DRIVE, SUITE 1000
TAMPA, FLORIDA 336021"=20'
SITE PLAN
FLOATING INTAKE SYSTEM
(SEE DETAIL )
DEMO EXISTING FLOW
CONTROL DEVICES
(SEE DETAIL )
GEOWEB RAMP, TYP
(SEE DETAIL )
NOTES:
1. WINCH CABLE SHALL BE 1/2" DIA. 316 SS WITH
1X7 DESIGN MANUFACTURED IN COMPLIANCE
W/ MIL-DTL-83420. CABLE SHALL HAVE
ANTI-ROTATIONAL LAY. WINCH CABLE FOR EACH
WINCH STATION SHALL BE MIN 400'. PLACE
BALL FLOATS AS REQUIRED FOR WINCH CABLE
FLOTATION, ASSUME MINIMUM 20 TOTAL FOR
EACH WINCH CABLE.
2. LOCATION OF EXISTING WATER LINE IS
APPROXIMATE, AND SHALL BE VERIFIED DURING
CONSTRUCTION.
3. PROVIDE 150 FEET OF 16-INCH HDPE INTAKE
PIPE AND INSTALL WITH A SOFT ARC OUT TO
THE INTAKE.
4. THE MINIMUM WATER ELEVATION TO ALLOW
FOR FLOATING INTAKE SYSTEM CONVEYANCE
TOWARD SHORE IS 2.0 FEET. WINCH EFFORTS
SHALL BE STOPPED IF ANY OBJECTS ARE SEEN
THAT WOULD IMPACT THE PATH OF THE INTAKE
AND/OR SUCTION PIPE. CONTINUING TO PULL
THE INTAKE TOWARD SHORE. OPERATION
UNDER EITHER CONDITIONS COULD RESULT IN
DAMAGE TO THE SUCTION PIPE AND/OR THE
WINCH SYSTEM.
5. TEMPORARY COFFERDAMS MAY BE REQUIRED TO
FACILITATE CONSTRUCTION. TEMPORARY
COFFERDAM LOCATION SHOWN IS ESTIMATE
ONLY. FINAL LOCATION TO BE DETERMINED BY
CONTRACTOR. COFFERDAM DESIGN AND
CONSTRUCTION SHALL BE THE EXCLUSIVE
RESPONSIBILITY OF THE CONTRACTOR. THE
CONTRACTOR SHALL ALSO PROVIDE SUCH
TEMPORARY PUMPING, DRAINS, AND SUMPS AS
NECESSARY TO ENSURE THAT ALL
CONSTRUCTION ACTIVITIES CAN BE EXECUTED
IN THE DRY. DESIGN OF COFFERDAM SYSTEM
SHALL BE BY A PROFESSIONAL ENGINEER
CURRENTLY REGISTERED IN THE STATE OF
FLORIDA. CONTRACTOR SHALL SUBMIT
STRUCTURAL DRAWINGS AND CALCULATIONS
OF COFFERDAM SYSTEM BOTH SEALED BY THE
PROFESSIONAL ENGINEER RESPONSIBLE FOR
DESIGN. COFFERDAM SYSTEMS CANNOT
PENETRATE THE EXISTING CLAY LINER BELOW
THE BOTTOM OF THE POND. SEE NOTES ON
SHEET G-3.
6. ALL TEMPORARY EMBANKMENTS OF
COFFERDAMS THAT WILL BE INCORPORATED
INTO THE COMPLETED WORK SHALL FULLY
COMPLY WITH THE FOUNDATION PREPARATION,
MATERIAL GRADATION, AND COMPACTION
REQUIREMENTS SPECIFIED ELSEWHERE IN THE
CONTRACT DOCUMENTS FOR THE PARTICULAR
LOCATION. ALL OTHER TEMPORARY
EMBANKMENTS AND COFFERDAMS SHALL BE
REMOVED.
7. 2" COMPRESSED AIR PIPING SHALL BE MODEL
SB1 316 STAINLESS SINGLE BRAIDED METAL
HOSE, AS MANUFACTURED BY HOSECRAFT USA,
OR APPROVED EQUAL. FITTINGS SHALL BE
WELDED 316 SS. ATTACH HOSE TO 16" HDPE
WITH 316 SS HARDWARE AND CLAMPS AT MIN
15 LOCATIONS.
8. ALL HARDWARE FOR PIPE FLOATS, BALL FLOATS,
AND ASSOCIATED HOSE AND CABLES SHALL BE
316 SS.
9. 16-INCH FLEXIBLE RUBBER HOSE SHALL BE
REINFORCED RUBBER WITH 304 SS ANSI 150
FLANGES. MANUFACTURER SHALL BE JGB OR
NOVAFLEX. HOSE SHALL BE RATED FOR FULL
VACUUM AND FOR 150 PSI. MINIMUM OF 15
DEGREE BEND ACROSS THE LENGTH OF THE
PIPE IS REQUIRED.
WINCH CABLE W/ SAFETY
FLAGS AND BALL FLOATS
SEE NOTE 1
20'
2D C-2
16" FLGxFLG
FLEXIBLE RUBBER
HOSE 15' LONG
(TYP OF 2)
SEE NOTE 9
EXISTING SHEET
PILE WALL
SEE SHEET G-3
FOR REFERENCE DRAWINGS RELATED
TO SHEETPILE WALL CONSTRUCTION
BOLLARD
(TYP OF 4)
BOLLARD
(TYP)
EXISTING PUMP
STATION
(SEE DEMOLITION
ON SHEET C-2)
EXISTING
CHEMICAL
STORAGE &
FEED
EXISTING
ELECTRICAL
BUILDING
PROPOSED INTAKE
PUMP STATION AND
PIPING IMPROVEMENTS
(SEE SHEET M-1)
TAP EXISTING WATERLINE AND INSTALL COUNTY
APPROVED BFP AND RUN 2" SCH 80 PVC LINE AS SHOWN.
2" WATERLINE SHALL BE INSTALLED UNDER ROADWAYS
USING TRENCHLESS METHOD TO AVOID IMPACT TO
EXISTING ROADWAY - NO DAMAGE TO ROADWAY SHALL
OCCUR FROM WATERLINE INSTALLATION. MINIMUM
DEPTH BELOW ROADWAY TOP OF PAVEMENT FOR
INSTALLATION OF 2" WATERLINE SHALL BE 5 FEET; FOR
INSTALLATION UNDER GRASS, MINIMUM DEPTH SHALL BE
3 FEET. CONTRACTOR SHALL LOCATE POTENTIAL
CONFLICTS ALONG ROUTE THROUGH SUE AND SURVEY
AND ADJUST WATER LINE DEPTH TO AVOID CONFLICTS;
WATERLINE SHALL BE PROVIDED A MINIMUM OF 18"
CLEARANCE FROM POTENTIAL CONFLICTS. CONTRACTOR
SHALL SUBMIT SUE AND SURVEY RESULTS ALONG WITH
PROPOSED TRENCHLESS INSTALLATION METHOD AND
ROUTING FOR ENGINEER AND CONSULTANT REVIEW
PRIOR TO ORDERING MATERIALS. CONTRACTOR SHALL
PERFORM REQUIRED DISINFECTION OF NEW WATER LINE
AND SUBMIT APPLICATION FOR AND OBTAIN CLEARANCE
OF WATER LINE AND APPURTANCNES FROM AUTHORITIES
HAVING JURISDICTION.
UNKNOWN UTILITIES (TYP)
(1'-3' BLS)
(1'-3' BLS)
(2'-4' BLS)
WV
WV
WV
WATER VALVE
(TYPICAL)
VAULT
VAULT
(1'-3' BLS)
(1'-3' BLS)
REMOVE EX ELECTRICAL PANELS & SUPPORTS. CUT
CONDUIT DOWN 1-FOOT BELOW GRADE AND INSTALL
CAP. REMOVE WIRE BACK TO HANDHOLES AT 34TH ST.
(1'-3' BLS)
FLOW
METER
STATION
COMM.
JUNCTION
(1'-3' BLS)
C-4
C-4
C-4
WOODEN POLE
W/ SIGHT
LEVEL GAUGE
WINCH STATION
(SEE STRUCTURAL SHEETS)
GROUT FILLED REVETMENT
ANCHOR TRENCH
(INSTALLED ALONG ENTIRE
PERIMETER)
DAYLIGHT LINE
(MATCH EXISTING GRADE)
SWALE LINED WITH FDOT
RUBBLE AS PER DETAIL
(TYP EITHER SIDE OF RAMP)
BOLLARD
(TYP OF 4)
M-2
16" HDPE INTAKE PIPE
SEE NOTE 3
10 20'020
1"=20'-0"
C-4 A
C-4 B
SLOPE
STABILIZATION
SHALL BE SLOPED
TO MATCH EXISTING
ELECTRICAL
JUNCTION (TYP)
NAUTILUS FLOAT
PART # 44416
(TYP OF 6)
2" COMPRESSED
AIR PIPING
SEE NOTE 5
2' MIN BETWEEN
EXISTING GUARDRAIL
& WINCH STATION
EXISTING INTAKE
PIPING (ABANDON
IN-PLACE)
WINCH STATION
(SEE STRUCTURAL SHEETS)
TOC EL 10.00
TOC EL 11.50
TOC EL 9.00
M
AX
S
LO
PE
EXISTING
RETAINING
WALL TO BE
DEMOLISHED
EXISTING TRAILER
MOUNTED DIESEL PUMP,
FLEXIBLE SUCTION AND
DISCHARGE HOSES SHALL
BE RE-LOCATED TO ALLOW
FOR WORK RELATED TO
GEOWEB RAMP.
C-4 C
1D C-2
TEMPORARY COFFERDAM SYSTEM
FOR CONSTRUCTION, (TYP OF 3)
SEE NOTE 5 AND 6
TEMPORARY COFFERDAM SYSTEM
TO EXTEND MINIMUM OF 10 FEET
BEYOND THE WATERS EDGE, TYP
GRADE SLOPE AS SHOWN AND PREPARE SURFACE
FOR SEEDING. SPREAD PERMANENT SEEDING
AND FERTILIZER. INSTALL AND SECURE STRAW
WITH NET TEMPORARY ROLLED EROSION
CONTROL MAT, NORTH AMERICAN GREEN S150
OR EQUAL, WITH A MINIMUM BARE SOIL SHEAR
STRESS OF 1.5 LB/SF, WITH ANCHOR TRENCHES
AND STAPLES AS PER MANUFACTURERS
RECOMMENDATIONS, TYP ALL AREAS SHOWN
C-4
WORK AREA FOR THE PROJECT IS THAT AREA OF THE
SITE SHOWN ON THIS SHEET. CONTRACT SHALL CONFINE
THEIR EFFORTS TO THIS AREA, UNLESS COORDINATED
WITH THE ENGINEER. CONTRACTOR TO COORDINATE WITH
ENGINEER REGARDING USE OF ACCESS ROADS FOR
GETTING TO/FROM AND AROUND THE WORK AREA.
5'
PIPE SUPPORT PAD (SEE
STRUCTURAL SHEETS)
GROUT FILLED REVETMENT
ANCHOR TRENCH
(INSTALLED ALONG ENTIRE
PERIMETER)
EL -7.00
1000 NORTH ASHLEY DRIVE, SUITE 1000
TAMPA, FLORIDA 33602
MAX WATER
LEVEL EL 9.00
LOW WATER
LEVEL EL -1.50
1' -0
EXIST 18"
FLG'D. TEE
EXIST 18" 90°
FLG'D. BEND
REMOVE EXISTING BUOYANT
FLOW CONTROL DEVICES AND
ALL APPURTENANCES FROM
FLANGE AND INSTALL 18" HDPE
2" THICK BLIND FLANGES
DETAIL 2D
DEMO OF EXISTING FLOW CONTROL DEVICES
3/8" = 1'-0" C-2
10-P-01 10-P-02
T/CONC. EL. -11.17
SUCTION EL. -10.30
EXIST. GRADE
EL. 11.00 ±
T/WETWELL
EL. 11.17
T/CONC.
EL. 12.46
DETAIL 1D
DEMO OF EXISTING PUMPS & PIPING
3/8" = 1'-0" C-1
10-P-01
10-P-02
REMOVE EXISTING
PUMPS, MOTORS, AND
ALL ACCESSORIES
REMOVE EXISTING
PUMPS, MOTORS, AND
ALL ACCESSORIES
12" 0 1 4'2
3/8"=1'-0"
EXISTING 12" DUCTILE
IRON PIPE, VALVES,
AND FITTINGS
REMOVE EXISTING
PIPING, FITTINGS, AND
VALVES UP TO
FLANGED SPOOL
REMOVE EXISTING
PIPING BACK TO
FLANGE OF TEE
EXISTING PUMP CONTROL PANEL. REMOVE
EXISTING WIRING AND CONDUIT
BETWEEN PUMPS AND THE LOCAL
CONTROL PANEL. REMOVE EXISTING
WIRING FROM LOCAL CONTROL PANELS
BACK TO VFD'S IN ELECTRICAL ROOM.
AFTER REMOVAL OF PUMPS, INSTALL
1/2-INCH THICK, EPOXY COATED,
STEEL PLATE, BOLTED TO BASE
PLATE ON CONCRETE PAD (TYP OF 2)
NOTES:
1. CONTRACTOR SHALL COORDINATE WITH
COUNTY ON WHERE TO TRANSPORT THE
PUMPS FOR STORAGE AFTER REMOVAL.
2. SEE SPECIFICATION SECTION 02 41 00 FOR
ADDITIONAL DEMOLITION REQUIREMENTS.
SECTION A
DEMO OF EXISTING PUMPS & PIPING
3/8" = 1'-0" C-2
A C-2
A C-2
TAMPA, FLORIDA 33602
Silt Flow
Type III Silt Fence structures Sheet 2 of 3.
accordance with Chart I, Sheet 1 of 3 and ditch installations at drainage
Note: Spacing for Type III Fence to be in
BARRIER FOR UNPAVED DITCHES
Anchor Top Bales To Lower Bales With 2 - 2" x 2" x 4' Stakes Per Bale.
Anchor Lower Bales With 2 - 2" x 2" x 4' Stakes Per Bale.
ELEVATION
TYPE II
Rail
5' Typ.
Post
1' Min. Recommended
SILT FENCE APPLICATIONS
watercourses. Silt fences are to be used at upland locations and turbidity barriers Do not deploy in a manner that silt fences will act as a dam across permanent flowing
Type III Silt Fence Protection Around Ditch Bottom Inlets.
used at permanent bodies of water.
DitchDitch Curb & Gutter
Sidewalk
Curb & Gutter
Anchor Bales With 2 - 2" x 2" x 4' Stakes Per Bale.
DITCH BOTTOM INLETCOMPLETED INLET
Note: Bales to be staked at the direction of the Engineer.
Loose Soil Placed By Shovel And Lightly Compacted Along Upstream Face Of Bales.
Type A Or B Fence
BALES BACKED BY FENCE
Riser Open
Apron
PARTIAL INLET
PROTECTION AROUND INLETS OR SIMILAR STRUCTURESLEGEND
Pile Locations
Dredge Or Fill Area
Limits Of Const.
Shore Line
Stream Or
Tidal Creek
Anchor
Barrier Movement Due To Current Action
Shore Line
Turbidity Barriers
Note:
Limits Of Const.
creeks may be either floating, or staked types or any combinations of types that will suit site conditions and meet erosion control and water be at the Contractors option unless otherwise specified in the plans, however payment will
Turbidity barriers for flowing streams and tidal quality requirements. The barrier type(s) will
Engineer.
plans for Floating Turbidity Barrier and/or Staked Turbidity Barrier. Posts in staked turbidity barriers to be installed in vertical position unless otherwise directed by the be under the pay item(s) established in the
Mooring Buoy w/Anchor10 0'
Proposed Toe Of Slope10 0'
Ty pic al
Shore Line
Existing Causeway
100'
Typical
Structure Alignment
Current
Typical100'
NOTES:
2. Number and spacing of anchors dependent on current velocities.
Ty pi ca l
FLOATING TURBIDITY BARRIER APPLICATIONS
5. For additional information see Section 104 of the Standard Specifications.
1. Turbidity barriers are to be used in all permanent bodies of water regardless of water depth.
3. Deployment of barrier around pile locations may vary to accommodate construction operations.
4. Navigation may require segmenting barrier during construction operations.
EROSION CONTROL NOTES:
1. ALL PRACTICABLE AND NECESSARY EFFORT SHALL BE TAKEN DURING CONSTRUCTION TO CONTROL AND PREVENT EROSION AND TRANSPORT OF SEDIMENT MATERIAL TO INLETS, SURFACE DRAINS, DITCHES, WETLANDS AND DETENTION AREAS. CONTRACTOR SHALL FOLLOW FDOT GUIDELINES FOR THE
INSTALLATION AND MAINTENANCE OF TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES AND REFERENCE FDOT INDEX NOS. 102 AND 103. CONTRACTOR SHALL SUBMIT A SILTATION/EROSION CONTROL PLAN MEETING ALL REQUIREMENTS OF FDOT INDEX 102 & 103 THE APPROVED NPDES PERMIT, AND THE
ENGINEER'S REQUIREMENTS. FOR APPROVAL AND INSTALLATION PRIOR TO CONSTRUCTION.
2. ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES SHALL BE INSTALLED BEFORE
CONSTRUCTION BEGINS AND REMAIN IN PLACE UNTIL PERMANENT COUNTERMEASURES ARE INSTALLED OR
PERMANENT GROUND COVER IS ESTABLISHED.
3. FDOT TYPE II FLOATING TURBIDITY BARRIERS SHALL BE INSTALLED IN POND A AND OTHER WATER BODIES WITH FLUCTUATING WATER LEVELS, CONTRACTOR SHALL FIELD DETERMINE LOCATION OF BARRIER
FOR OPTIMAL PERFORMANCE.
4. STAKED HAY BALES AND SILT FENCING SHALL BE PLACED ADJACENT TO DITCHES TO PREVENT TURBID
DISCHARGES FROM CONSTRUCTION ACTIVITIES.
5. STAKED SILT FENCE SHALL BE PLACED ALONG THE EDGES OF CONSTRUCTION TO PREVENT TURBID DISCHARGES FROM FLOWING ONTO ADJACENT PROPERTIES. THIS FENCING SHALL EXTEND THE LENGTH OF
THE PROPOSED IMPROVEMENTS FOR THE DURATION OF CONSTRUCTION.
6. THE CONTRACTOR SHALL PROVIDE SILTATION REDUCTION DEVICES FOR THE DISCHARGE FROM ANY
DEWATERING PROCESS SO THAT DIRECT DISCHARGE DOES NOT OCCUR.
7. THE CONTRACTOR SHALL CHECK ALL EROSION AND SILTATION CONTROL DEVICES AFTER EACH RAINFALL
AND REPAIR OR REPLACE THEM AS REQUIRED AT CONTRACTOR'S EXPENSE.
8. THE CONTRACTOR SHALL PROVIDE TO THE ENGINEER AND REGULATORY AUTHORITIES ON A WEEKLY BASIS, A COMPLETED STORMWATER POLLUTION PREVENTION PLAN INSPECTION REPORT, A COPY WHICH IS TO BE KEPT WITH THE CONTRACTORS EROSION CONTROL PLAN AND PRESENTED UPON REQUEST TO THE
PROPER AUTHORITIES.
9. CONTRACTORS RESPONSIBILITY
EROSION AND SEDIMENTATION CONTROLS ARE PERFORMANCE BASED CRITERIA. IF THE BPMS PROVIDED DO NOT PREVENT SOILS FROM LEAVING A CONSTRUCTION SITE, THEN THE CONTRACTOR IS REQUIRED TO
EMPLOY ADDITIONAL PROCEDURES TO PROVIDE CLEAN RUNOFF FROM SITE.
2.
1.
FILTER FABRIC SHALL BE WIRED DIRECTLY TO POST.
6'-0" POST SPACING DOES NOT REQUIRE MESH SUPPORT FENCE.
EXTRA STRENGTH FILTER FABRIC (AS APPROVED BY ENGINEER) WITH
NOTE:
SECTIONELEVATION
STEEL POST
SILT FENCESILT FENCE
3' -0
M
IN
FI
LT
ER
F
AB
RI
C 3'
-0
M
IN
GRADE LINE
LI
NE
W
IR
ES
BOTTOM STRAND
TOP STRAND
STAY WIRES
MIN
8"
M
IN
2' -0
"M
IN8"
2' -2
M
IN
8'-0" MAX
FABRIC A MIN OF 8"
BURY TOE OF FILTER
AND FILTER FABRIC.
GALV WIRE FABRIC
THE EXCAVATED SOIL.
4. BACKFILL AND COMPACT
4"
UPSLOPE ALONG THE LINE OF STAKES
2. EXCAVATE A 4"x4" TRENCH
3' A
6'MAX.
FLOW
1. SET THE STAKES.
AND EXTEND IT INTO THE TRENCH.
3. STAPLE FILTER MATERIAL TO STAKES
FLOW
FLOW
B
(FRONT ELEVATION)
DRAINAGEWAY INSTALLATION
POINTS A SHOULD BE HIGHER THAN POINT B.
(WITHOUT WIRE SUPPORT)
CONSTRUCTION OF A SILT FENCE
(PERSPECTIVE VIEW)
SHEET FLOW INSTALLATION
SF
MAX
9. EROSION AND SEDIMENTATION CONTROLS ARE PERFORMANCE BASED CRITERIA. IF THE BMPS
PROVIDED DO NOT PREVENT SOILS FROM LEAVING A CONSTRUCTION SITE, THEN THE
CONTRACTOR IS REQUIRED TO EMPLOY ADDITIONAL PROCEDURES TO PROVIDE CLEAN RUNOFF
FROM SITE.
TAMPA, FLORIDA 33602
DETAIL 1
BOLLARD
N.T.S. C-1
3'
15' 1'
3'
6.67
APPROXIMATE
WATER SURFACE
ELEV
(15% MAX.)
GW30V GEOWEB, 15'W x 6" THICK
BACKFILLED WITH NO. 57 STONE, TYPE
I SEPARATOR GEOTEXTILE BENEATH
ALL LOCATIONS OF GEOWEB. SECURE
WITH ATRA ANCHORS OR EQUAL
APPROX. ELEV = 11
~80'
GEOWEB RAMP, TYPE I SEPARATOR
GEOTEXTILE BENEATH
GEOWEB RAMP PROFILE
GEOWEB RAMP SECTION
PROVIDE SWALE ON EITHER
SIDE OF RAMP, LINED WITH
FDOT RUBBLE (DITCH LINING).
WITH TYPE II SEPARATOR
GEOTEXTILE BENEATH ENTIRE
EXTENT OF RUBBLE, BOTH
SIDES OF ROADPAVEMENT
1/ 2"
S
LO
PE
4' -0
4'
-0
6"
6" 6"
CLASS "B"
CONCRETE
ENCASEMENT
SLOPE TOP FOR
POSITIVE WATER
RUNOFF
6"Ø SCH 40 STEEL
PIPE FILLED WITH
CONCRETE AND
PAINTED PER
SPECS
COMPACTED
SELECT FILL
(SEE NOTE 1)
NOTE:
1. SUBGRADE EVALUATED AND COMPACTED PER
SPECIFICATIONS. CONTRACTOR TO COORDINATE WITH
ENGINEER FOR SOILS TESTING; ENGINEER TO PROVIDE
TESTING RESULTS TO CONSULTANT., CONTRACTOR TO
ASSUME THAT 1.5 FEET OF EXISTING SOILS SHALL BE OVER
EXCAVATED BEYOND THE DESIRED GRADE AND BACKFILLED
WITH STONE OR SELECT FILL COMPACTED TO 95% DENSITY
MOD. PROCTOR (D1557)
DETAIL 2
GEOWEB @ RAMP
N.T.S. C-1
CREST OF BASIN SLOPE
EL 9.25
SUBGRADE EVALUATED AND
COMPACTED PER SPECIFICATIONS.
CONTRACTOR TO COORDINATE
WITH ENGINEER FOR SOILS
TESTING; ENGINEER TO PROVIDE
TESTING RESULTS TO
CONSULTANT. CONTRACTOR TO
ASSUME THAT 1.5 FEET OF
EXISTING SOILS HAS TO BE OVER
EXCAVATED BEYOND THE DESIRED
GRADE AND REPLACED WITH
SELECT FILL.
SECTION
C-1 A
N.T.S.
EXISTING GRADE
ANCHOR TRENCH. BACKFILL ANCHOR
TRENCH WITH GROUT OR SELECT FILL,
PLACED IN TWO SIX-INCH LIFTS, AND
COMPACTED TO 95% STANDARD PROCTOR
CUT EXISTING
GRADE
DAYLIGHT LINE (MATCH
EXISTING GRADE)
18"
4" THICK UNIFORM SECTION
GROUT FILLED FABRIC
FORMED REVETMENT
EL 9.25
2'
EL 10.07
EL 9.00
MAX
WSE
4" THICK UNIFORM SECTION GROUT FILLED
FABRIC FORMED REVETMENT ANCHOR TRENCH.
BACKFILL ANCHOR TRENCH WITH GROUT OR
SELECT FILL, PLACED IN TWO SIX-INCH LIFTS,
AND COMPACTED TO 95% STANDARD PROCTOR
CONCRETE SLAB (SEE
STRUCTURAL SHEETS)
SECTION
C-1 B
N.T.S.
SLOPE PERC-1
DOWN TO EL -2.00
MATCH EXISTING
GRADE PER C-1
(TYPICAL OF
EITHER SIDE)
4" THICK UNIFORM SECTION
GROUT FILLED REVETMENT
(INSTALL PER MANUFACTURER'S
RECOMMENDATIONS)
18"
CREST OF
BASIN SLOPE
EL 9.25
SUBGRADE EVALUATED AND
COMPACTED PER SPECIFICATIONS.
CONTRACTOR TO COORDINATE
WITH ENGINEER FOR SOILS
TESTING; ENGINEER TO PROVIDE
TESTING RESULTS TO
CONSULTANT. CONTRACTOR TO
ASSUME THAT 1.5 FEET OF
EXISTING SOILS HAS TO BE OVER
EXCAVATED BEYOND THE DESIRED
GRADE AND REPLACED WITH
SELECT FILL.
EL 9.25
2' MIN
EL 10.00
EL 9.00
MAX
WSE
SLOPE PER SHEET C-1
4" THICK UNIFORM SECTION GROUT FILLED FABRIC FORMED
REVETMENT ANCHOR TRENCH. BACKFILL ANCHOR TRENCH
WITH GROUT OR SELECT FILL, PLACED IN TWO SIX-INCH
LIFTS, AND COMPACTED TO 95% STANDARD PROCTOR
CONCRETE SLAB (SEE
STRUCTURAL SHEETS)
SECTION
C-1 C
N.T.S.
4" THICK UNIFORM SECTION
GROUT FILLED REVETMENT
(INSTALL PER MANUFACTURER'S
RECOMMENDATIONS)
18"
EXTENT OF SLOPE STABILIZATION
AS SHOWN ON DWG C-1 (VARIES)
GRADE SLOPE AS SHOWN AND PREPARE SURFACE FOR SEEDING. SPREAD
PERMANENT SEEDING AND FERTILIZER. INSTALL AND SECURE STRAW WITH NET
TEMPORARY ROLLED EROSION CONTROL MAT, NORTH AMERICAN GREEN S150 OR
EQUAL, WITH A MINIMUM BARE SOIL SHEAR STRESS OF 1.5 LB/SF, WITH ANCHOR
TRENCHES AND STAPLES AS PER MANUFACTURERS RECOMMENDATIONS
NOTES:
1. FINAL GRADE SHOWN ON SHEET C-1 IN AREAS OF GROUT
FILLED REVETMENT SHALL BE MEASURED AT THE SURFACE OF
THE GEOGRID SYSTEM.
ANCHOR TRENCH. BACKFILL ANCHOR
TRENCH WITH GROUT OR SELECT FILL,
PLACED IN TWO SIX-INCH LIFTS, AND
COMPACTED TO 95% STANDARD PROCTOR
ANCHOR TRENCH. BACKFILL
ANCHOR TRENCH WITH GROUT OR
SELECT FILL, PLACED IN TWO
SIX-INCH LIFTS, AND COMPACTED
TO 95% STANDARD PROCTOR
STRATAGRID SGU40
GEOGRID SYSTEM, OR
APPROVED EQUAL.
18"
18"
SLOPE PER SHEET C-1
STRATAGRID SGU40
GEOGRID SYSTEM, OR
APPROVED EQUAL.
SUBGRADE SHALL BE EVALUATED
AND COMPACTED PER SPECIFICATIONS.
SUBGRADE SHALL BE EVALUATED
AND COMPACTED PER SPECIFICATIONS.
SUBGRADE SHALL BE EVALUATED AND COMPACTED PER
NOTES:
1. THE CONTRACTOR SHALL FULLY IMPLEMENT THE TTCP PRIOR TO COMMENCEMENT OF ANY POTENTIAL TRAFFIC
DISTURBING ACTIVITIES.
2. THE CONTRACTOR SHALL PROVIDE PROPER WARNING SIGNS, BARRICADES, TEMPORARY FENCING AND OTHER APPROPRIATE SAFETY DEVICES DURING THE EXECUTION OF THE WORK TO PROVIDE PUBLIC PROTECTION AND SAFETY.
3. MAINTENANCE OF TRAFFIC SIGNS, PERSONNEL AND OTHER TRAFFIC CONTROL DEVICES SHALL BE PROVIDED BY THE
CONTRACTOR DURING CONSTRUCTION AS REQUIRED BY FDOT STANDARDS.
4. THE CONTRACTOR SHALL PROVIDE ACCESS FOR TRAFFIC AT ALL TIMES DURING CONSTRUCTION.
HAZEN AND SAWYER
TAMPA, FLORIDA 33602
G-1 THESE NOTES ARE GENERAL AND SUPPLEMENT THE SPECIFICATIONS. THESE NOTES APPLY TO THE ENTIRE PROJECT UNLESS
MODIFIED OR NOTED OTHERWISE IN THE CONTRACT DOCUMENTS.
G-2 STANDARD DETAILS SHALL BE USED WHEN REFERRED TO OR WHEN NO MORE RESTRICTIVE OR DIFFERENT DETAILS ARE SHOWN ON
THE DRAWINGS.
G-3 DESIGN IS IN ACCORDANCE WITH AND CONSTRUCTION SHALL COMPLY WITH THE PROVISIONS OF THE FLORIDA BUILDING CODE.
THE DESIGN LOADS AND OTHER DESIGN VALUES GIVEN IN NOTES G-4 THROUGH G-7 WERE USED FOR DESIGN OF STRUCTURES
UNLESS NOTED OTHERWISE ON THE DRAWINGS.
G-4 LIVE LOADS:
GENERAL STRUCTURAL NOTES
F-1 CONCRETE (CAST-IN-PLACE) NOTES APPLY TO FOUNDATIONS.
F-2 ALLOWABLE SOIL BEARING PRESSURE
-ALL STAIRWAYS, LANDINGS AND PLATFORMS ARE DESIGNED FOR A LIVE LOAD = 100 PSF UNLESS NOTED OTHERWISE.
G-5 SEISMIC LOAD:
RISK CATEGORY =
SEISMIC IMPORTANCE FACTOR (Ie) = 1.0
SITE CLASS = D
MAPPED SPECTRAL RESPONSE ACCELERATIONS (Ss/S1) = 0.056/0.031
SPECTRAL RESPONSE ACCELERATIONS (SMS/SM1) = 0.090/0.075
SPECTRAL RESPONSE COEFFICIENTS (SDS/SD1) = 0.060/0.050
SEISMIC DESIGN CATEGORY = A
G-6 ALL DIMENSIONS INDICATED FOR EXISTING STRUCTURES SHALL BE VERIFIED BY FIELD MEASUREMENT. ALL DIMENSIONS THAT ARE CONTROLLED BY OR RELATED TO EQUIPMENT SHALL BE VERIFIED BY THE CONTRACTOR WITH THE MANUFACTURER
SHOP DRAWINGS PRIOR TO CONSTRUCTION.
G-7 THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING INFORMATION IN THE FIELD AS REQUIRED FOR NEW
WORK.
G-8 EQUIPMENT ANCHOR BOLT SIZES, TYPES, EMBEDMENT AND PATTERNS SHALL BE VERIFIED WITH THE MANUFACTURER. ALL BOLT
PATTERNS SHALL BE TEMPLATED TO INSURE ACCURACY OF PLACEMENT.
G-9 STRUCTURAL DRAWINGS SHALL BE USED IN COORDINATION WITH THE DRAWINGS OF ALL OTHER DISCIPLINES AND
MANUFACTURER'S SHOP DRAWINGS.
G-10 STRUCTURES HAVE BEEN DESIGNED FOR OPERATIONAL LOADS ON THE COMPLETED STRUCTURE. DURING CONSTRUCTION, THE STRUCTURES SHALL BE PROTECTED BY BRACING AND TEMPORARY SUPPORTS WHEREVER EXCESSIVE CONSTRUCTION LOADS
MAY OCCUR. OVERSTRESSING OF ANY STRUCTURAL ELEMENT IS PROHIBITED.
G-11 IF CONTRACTOR DESIRES TO TEMPORARILY PLACE OR MOVE LOADS ON OR ADJACENT TO EXISTING STRUCTURES OR UTILITIES DURING CONSTRUCTION PROCESS, CONTRACTOR IS EXCLUSIVELY RESPONSIBLE FOR MAINTAINING STRUCTURAL INTEGRITY AND AVOIDING OVERSTRESSING AND DAMAGING EXISTING STRUCTURES AND UTILITIES. CONTRACTOR SHALL SUBMIT STRUCTURAL CALCULATIONS AND DRAWINGS VERIFYING PROPOSED CONSTRUCTION INCLUDING APPLICATION OF TEMPORARY CONSTRUCTION LOADS WILL NOT OVERSTRESS OR DAMAGE EXISTING STRUCTURES AND UTILITIES. DRAWINGS AND CALCULATIONS SHALL BE SEALED BY A PROFESSIONAL ENGINEER CURRENTLY REGISTERED IN THE STATE OF FLORIDA.
F-3 STRUCTURES ARE DESIGNED FOR A 100-YEAR FLOOD ELEVATION OF 9.00.
STRUCTURAL METALS CONCRETE (CAST-IN-PLACE)
FOUNDATIONS
LEVEL
STRUCTURE ROOF CONCRETE PAD ALUMINUM PLATFORM
PUMP PAD N/A 100 PSF 100 PSF
PARAMETER
STRUCTURE ALLOWABLE SOIL BEARING PRESSURE
PUMP PAD 3000 PSF
WINCH PAD 3000 PSF
PIPE SUPPORT PAD 3000 PSF
M-1 DETAIL, FABRICATE, AND ERECT STRUCTURAL STEEL IN ACCORDANCE WITH AISC SPECIFICATION FOR STRUCTURAL STEEL
BUILDINGS, ALLOWABLE STRESS DESIGN AND PLASTIC DESIGN, LATEST EDITION.
M-2 STEEL MATERIAL:
A) STRUCTURAL HSS: ASTM A500, GRADE C (46/50 KSI) OR A1085 (50 KSI)
B) STRUCTURAL PIPE: ASTM A53, GRADE B (35 KSI)
C) PLATES, BARS AND ANGLES: ASTM A36 UNO (36 KSI)
D) STRUCTURAL W SHAPES: ASTM A992 (50 KSI)
E) STRUCTURAL S, M, C & MC SHAPES: ASTM A36 (36 KSI)
F) STRUCTURAL HP ASTM A572 GRADE 50 (50 KSI)
G) RODS ASTM F1554 GRADE 36 (36 KSI)
M-3 PROVIDE MINIMUM 3/4" DIAMETER ASTM A325 HIGH STRENGTH BOLTS WITH SNUG TIGHTENED TYPE N CONNECTIONS FOR STRUCTURAL STEEL UNLESS NOTED OTHERWISE. HOLES FOR BOLTS SHALL BE STANDARD SIZE UNLESS NOTED OTHERWISE.
M-4 DO NOT PAINT STEEL SURFACES WHICH ARE TO BE WELDED OR ARE TO BE ENCASED IN CONCRETE.
M-5 ALL STAINLESS STEEL FABRICATIONS EXPOSED TO UNDERWATER SERVICE SHALL BE TYPE 316. ALL OTHER STAINLESS STEEL
FABRICATIONS SHALL BE TYPE 304 UNLESS NOTED OTHERWISE.
M-6 ALUMINUM SHALL BE ALLOY 6061-T6 UNLESS NOTED OTHERWISE.
M-7 ALL BOLTS, ANCHOR BOLTS, AND CONCRETE ANCHORS CONNECTING ALUMINUM SHALL BE STAINLESS STEEL TYPE 316 FOR
UNDERWATER APPLICATIONS AND TYPE 304 FOR ALL OTHER APPLICATIONS.
M-8 DETAIL, FABRICATE, AND ERECT ALUMINUM IN ACCORDANCE WITH THE LATEST EDITION OF THE ALUMINUM ASSOCIATION
ALUMINUM DESIGN MANUAL.
M-9 ALUMINUM SHALL BE ISOLATED FROM CONTACT WITH CONCRETE AND DISSIMILAR METALS.
M-10 ALL GROOVE AND BUTT WELDS SHALL BE FULL PENETRATION.
M-11 FILLET WELD SIZES SHALL NOT BE LESS THAN THE MINIMUM SIZE REQUIRED BY AISC CODE FOR PLATE SIZES TO BE CONNECTED AND SHALL BE APPLIED TO THE ENTIRE JOINT CONTACT LENGTH, AND NOT LESS THAN 3/16".
M-12 BOTTOM SURFACES OF BASE PLATES SHALL BE GROUTED TO ENSURE FULL BEARING CONTACT WITH CONCRETE SLAB.
M-13 WHENEVER ONE MEMBER IS FASTENED TO ANOTHER WITH FASTENINGS (BOLTS, WELDS, ETC.) SET AT A UNIFORM SPACING, THERE SHALL BE A MINIMUM OF TWO FASTENINGS PER PIECE CONNECTED AND THE FIRST AND LAST FASTENINGS SHALL BE
LOCATED NOT TO EXCEED 0.25 OF FASTENER SPACING FROM EACH END.
M-14 BOLTED CONNECTIONS FOR STRUCTURAL STEEL SHALL BE ASSEMBLED AND INSPECTED IN ACCORDANCE WITH RCSC
(SPECIFICATIONS FOR STRUCTURAL JOINTS USING ASTM A325 OR ASTM A490 BOLTS).
M-15 STRUCTURAL WELDED JOINTS SHALL CONFORM TO THE PROVISIONS OF AWS D1.1, STRUCTURAL WELDING CODE BY AMERICAN WELDING SOCIETY. PROOF OF WELDER CERTIFICATION SHALL BE AVAILABLE AT THE JOB SITE DURING TIMES OF INSPECTION.
C-1 DESIGN OF CONCRETE ELEMENTS INCLUDING WALLS, FORMED SLABS, BEAMS, AND COLUMNS IS IN ACCORDANCE WITH ACI 318 (CODE REQUIREMENTS FOR STRUCTURAL CONCRETE) AND 350 (CODE REQUIREMENTS FOR ENVIRONMENTAL ENGINEERING
CONCRETE STRUCTURES).
C-2 FOR CONCRETE MIX DESIGN SEE SPECIFICATION SECTION 03300.
C-3 CONCRETE STRENGTH CLASSES (28-DAY COMPRESSIVE STRENGTH):
A) CLASS A1 CONCRETE (4,500 PSI): NORMAL WEIGHT STRUCTURAL CONCRETE TO BE USED IN ALL STRUCTURES QUALIFYING AS ENVIRONMENTAL CONCRETE STRUCTURES THAT ARE DESIGNED IN ACCORDANCE WITH ACI 350 INCLUDING PUMP STATIONS, TANKS, BASINS, PROCESS STRUCTURES, AND ANY STRUCTURES CONTAINING FLUID OR PROCESS CHEMICALS OR
OTHER MATERIALS USED IN TREATMENT PROCESS.
C-4 ALL BAR REINFORCING SHALL CONFORM TO ASTM A615, GRADE 60. WHERE REINFORCEMENT IS TO BE WELDED IN ACCORDANCE WITH AWS D1.4, ASTM A706 GRADE 60 SHALL BE USED. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185.
C-5 CONCRETE COVER FOR REINFORCING (UNLESS NOTED OTHERWISE ON THE DRAWINGS):
A) CONCRETE DEPOSITED DIRECTLY AGAINST SOIL: 3"
B) CONCRETE EXPOSED TO WEATHER (#5 OR SMALLER): 1 1/2"
CONCRETE EXPOSED TO WEATHER (#6 OR LARGER): 2"
C) SLABS: 1 1/2"
AT SURFACES CONTACTING FLUID: 2"
D) BEAMS AND COLUMNS (TO MAIN REINFORCEMENT): 2"
BEAMS AND COLUMNS (TO COLUMN TIES OR STIRRUPS): 1 1/2"
E) WALLS 12" OR MORE: 2"
F) FOR SURFACES EXPOSED TO FLUID IN BEAMS, COLUMNS AND WALLS: ADD 1/2" TO ABOVE VALUES
C-6 SPLICES SHALL BE CLASS "B" CONFORMING TO THE PROVISIONS OF ACI 318 UNLESS NOTED OTHERWISE. SPLICE LENGTH FOR TWO DIFFERENT SIZED BARS TO BE LAP SPLICED TOGETHER SHALL BE THE LENGTH OF THE LARGER BAR UNLESS NOTED
OTHERWISE.
C-7 ALL EXPOSED CORNERS SHALL HAVE A 3/4" CHAMFER OR A 1/2" RADIUS TOOLED CORNER.
C-8 EQUIPMENT SUPPORTS, ANCHORAGES, OPENINGS, RECESSES AND REVEALS NOT SHOWN ON THE STRUCTURAL DRAWINGS BUT REQUIRED BY OTHER CONTRACT DOCUMENTS, SHALL BE PROVIDED FOR PRIOR TO PLACING CONCRETE.
C-9 REINFORCING BARS AND ACCESSORIES SHALL NOT BE IN CONTACT WITH ANY METAL PIPE, PIPE FLANGE, METAL CONDUIT, OR OTHER METAL PARTS EMBEDDED IN CONCRETE. A MINIMUM CLEARANCE OF 2" SHALL BE PROVIDED.
C-10 DOWELS, ANCHOR BOLTS, PIPES, WATERSTOPS AND OTHER EMBEDDED ITEMS SHALL BE HELD SECURELY IN POSITION WHILE
CONCRETE IS BEING PLACED.
C-11 AT ALL TYPICAL CURBS, EQUIPMENT PADS, AND PIPE SUPPORT PIERS, REINFORCING DOWELS SHOWN MAY BE REPLACED WITH MATCHING DOWELS SET IN EPOXY IN DRILLED HOLES AS SPECIFIED. DOWELS LOCATED CLOSER THAN 3" FROM ANY EDGE OF
CONCRETE SHALL NOT BE REPLACED WITH DRILLED DOWELS.
C-12 DRILLED ADHESIVE DOWELS AND CONCRETE ANCHORS (WHERE DOWELS OR ANCHORS ARE SHOWN TO BE PLACED INTO
HARDENED CONCRETE):
A) THE HOLE DIAMETER SHALL BE NO LARGER THAN 1/8" GREATER THAN THE DIAMETER OF THE REINFORCING BAR AT THE DEFORMATIONS FOR DOWELS. THE HOLE DIAMETER SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS
FOR ANCHORS.
B) THE DEPTH OF EMBEDMENT SHALL BE 12 BAR DIAMETERS, UNLESS NOTED OTHERWISE.
C) ADJUST THE DOWEL OR ANCHOR LOCATIONS AS NEEDED TO AVOID DRILLING THROUGH ANY REINFORCING BARS. IF THE
LOCATION NEEDS TO BE MODIFIED, CONTACT THE ENGINEER. CONTRACTOR SHALL USE NON-DESTRUCTIVE MEANS TO FIELD
LOCATE REINFORCEMENT PRIOR TO DRILLING HOLES FOR DOWELS OR ANCHORS.
C-13 CLEAR DISTANCE FROM ANCHOR RODS TO ANY CONCRETE EDGE SHALL BE 4" MINIMUM UNLESS NOTED OTHERWISE.
C-14 CONCRETE COMPRESSIVE STRENGTH TESTS SHALL BE AVAILABLE ON THE JOB SITE FOR REVIEW BY THE ENGINEER.
G-12 NO BACKFILL SHALL BE PLACED AGAINST ANY SUBSTRUCTURE WALLS UNLESS ALL ADJACENT SUPPORTING ELEMENTS HAVE ACHIEVED DESIGN STRENGTH, OR WALLS HAVE BEEN PROPERLY BRACED, AND IN ANY CASE NOT SOONER THAN 28 DAYS AFTER THE PLACING OF CONCRETE. SUPPORTING ELEMENTS SHALL INCLUDE ADJACENT WALLS, SLABS, BEAMS AND COLUMNS.
A-1 ALL ARCHITECTURAL, MECHANICAL, AND ELECTRICAL COMPONENTS SHALL BE DESIGNED AND INSTALLED TO RESIST THE CONTROLLING CONDITION OF OPERATIONAL FORCES OR SEISMIC FORCES IN ACCORDANCE WITH THE GOVERNING BUILDING CODE.
SEISMIC FORCES SHALL ALSO BE AS PER ASCE 7. COMPONENT SEISMIC ATTACHMENTS SHALL BE BOLTED, WELDED, OR OTHERWISE POSITIVELY FASTENED WITHOUT CONSIDERATION OF FRICTIONAL RESISTANCE PRODUCED BY THE EFFECTS OF GRAVITY. A CONTINUOUS LOAD PATH OF SUFFICIENT STRENGTH AND STIFFNESS BETWEEN THE COMPONENT AND THE SUPPORTING STRUCTURE SHALL BE PROVIDED. CONNECTIONS FOR BOTH ORTHOGONAL DIRECTIONS (TRANSVERSE AND LONGITUDINAL) SHALL BE DESIGNED
BY AN ENGINEER CURRENTLY REGISTERED IN THE STATE OF FLORIDA.
A-2 COMPONENT REACTION FORCES AT THE POINT OF ATTACHMENT TO THE STRUCTURE SHALL BE SUBMITTED TO AND COORDINATED WITH THE ENGINEER FOR CONFIRMATION SUPPORTING STRUCTURE CAN WITHSTAND REACTION FORCES.
A-3 CONTRACTOR SHALL PROVIDE SPECIAL SEISMIC CERTIFICATION (SSC) FROM MANUFACTURER OF EQUIPMENT FOR ALL SYSTEMS DEEMED NECESSARY BY SPECIFICATIONS. SPECIAL SEISMIC CERTIFICATION SHALL BE IN COMPLIANCE WITH ASCE 7.
NONSTRUCTURAL COMPONENT ANCHORAGE
X-1 THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING INFORMATION IN THE FIELD AS REQUIRED FOR DEMOLITION AND
MODIFICATIONS.
EXISTING INFORMATION
HAZEN AND SAWYER
TAMPA, FLORIDA 33602
EL 11.67
EL 10.17
TOG 11.33
TOC 12.25
TOS EL 19.00
EL 7.25
EL 8.25
EL VARIES,
SEE CIVIL
EL 8.42
EL 12.00
EL 9.42
TOC 12.25
HAZEN AND SAWYER
1000 NORTH ASHLEY DRIVE, SUITE 1000
TAMPA, FLORIDA 33602
HPT 10.17
PLAN
3/8" = 1'-0"
SECTION A
3/8" = 1'-0" S-2
#7@8", EW,
TYP
WALL BEYOND
CONC LPT 10.07
SL
OP
E
SLOPE
#7@8", T&B, EW
C8
C8 [
I
I
I
SIDE MOUNTED
SIDE MOUNTED
I12
C12 [ C12 [ C12 [
A S-2
S-5
NOTES:
1. C8 DENOTES C8x6.48 AL.
C12 DENOTES C12x8.64 AL.
I12 DENOTES I12x14.3 AL.
L3.5 DENOTES L3.5X3.5X0.375 AL.
W8 DENOTES GALV W8x24 HSS8 DENOTES GALV HSS8x8x3/8 L4 DENOTES GALV L4x4x3/8 L3 DENOTES GALV L3x3x3/8
2. CONTRACTOR SHALL FURNISH SCUPPER DRAIN
TO PREVENT PONDING WATER. LOCATION SHALL
BE RESPONSIBILITY OF THE CONTRACTOR.
3. CONTRACTOR SHALL VERIFY SIZE AND
LOCATION OF EQUIPMENT PADS.
4. TEMPORARY COFFERDAMS MAY BE REQUIRED TO
FACILITATE CONSTRUCTION. COFFERDAM
DESIGN AND CONSTRUCTION SHALL BE THE
EXCLUSIVE RESPONSIBILITY OF THE
CONTRACTOR. THE CONTRACTOR SHALL ALSO
PROVIDE SUCH TEMPORARY PUMPING, DRAINS,
AND SUMPS AS NECESSARY TO ENSURE THAT
ALL CONSTRUCTION ACTIVITIES CAN BE
EXECUTED IN THE DRY. DESIGN OF COFFERDAM
SYSTEM SHALL BE BY A PROFESSIONAL
ENGINEER CURRENTLY REGISTERED IN THE
STATE OF FLORIDA. CONTRACTOR SHALL
SUBMIT STRUCTURAL DRAWINGS AND
CALCULATIONS OF COFFERDAM SYSTEM BOTH
SEALED BY THE PROFESSIONAL ENGINEER
RESPONSIBLE FOR DESIGN.
5. ALL TEMPORARY EMBANKMENTS OF
COFFERDAMS THAT WILL BE INCORPORATED
INTO THE COMPLETED WORK SHALL FULLY
COMPLY WITH THE FOUNDATION PREPARATION,
MATERIAL GRADATION, AND COMPACTION
REQUIREMENTS SPECIFIED ELSEWHERE IN THE
CONTRACT DOCUMENTS FOR THE PARTICULAR
LOCATION. ALL OTHER TEMPORARY
EMBANKMENTS AND COFFERDAMS SHALL BE
REMOVED.
6. CONTRACTOR SHALL COORDINATE OPENING
SIZE WITH APPROVED EQUIPMENT.
7. SUPPORT PIER TOP ELEVATION SHALL BE
COORDINATED WITH APPROVED EQUIPMENT.
REQUIREMENTS OF OPENING IN SLOPE
STABILIZATION MATERIAL SHALL BE
COORDINATED WITH SUPPLIER.
8. CONTRACTOR SHALL COORDINATE
POSITION OF PIPE SUPPORTS WITH
FLANGE LOCATIONS. SEE MECH
DRAWINGS.
9. CONCRETE SLAB LOCATION FOR PIPING
SUPPORT SHALL BE DETERMINED BY 12" DIP
LAYOUT. CONTRACTOR TO DETERMINE FINAL
LAYOUT OF 12" DIP AND LOCATION OF
CONCRETE SLAB AND SUBMIT TO THE ENGINEER
FOR REVIEW.
C12, TYP
2'-2"
2'-2"
TYP
R
IS
ER
S
6"
2 TREADS
@ 11" = 22"
TYP, 7 LOCATIONS
SECTION B
1" = 1'-0" S-2
B S-2
WALL BEYOND
EQUIP PAD
BEYOND
7"
AL PLATFORM,
SEE PLAN
PLATFORM
CONNECTION
#4 BAR
#4@8"
CONC STAIRS, SEE
SECTION B FOR TYP
REINFORCING
CONC STAIRS,
TYP 2 LOCATIONS
12"
3" Ø PVC SCUPPER
DRAIN, SEE NOTE 2
EDGE OF CONC
SLAB BELOW
AL PLATFORM
SCUPPER DRAIN
AND SLAB
REINFORCING
NOT SHOWN,
SEE SECTION A
SEE MECH FOR
MAX WSE
S-03-0504
EQPT PAD
S-05-0603
HANDRAIL GATE
TYP
S-05-0601
AL HANDRAIL
TYP
L3.5
S-5
TYP
S-05-0601
AL HANDRAIL
TYP
S-05-0701
AL GRTG
TYP
S-05-0202R
AL FRAMING CONN
TYP AT ENDS
S-05-0601
AL HANDRAIL
TYP
S-05-0701
AL GRATING
TYP
S-05-0601
AL HANDRAIL
TYP
S-05-0303
CONC STAIR NOSING
TYP
2"
4" 2'-1" 2'-1" 3'-2" 3'-2" 3'-2" 4"
1" 2" 2'
-6
5' -7
5'
-7
0"
2"
L3 .5
I
I
I
I
2' -5
16'-8"
L3.5
L3 .5
L3.5
L3 .5
C12 [ C12 [C12 [
C12 [ C12 [ C12 [C12 [ C12 [C12 [
C12 [ C12 [ C12 [C12 [ C12 [C12 [
C12 C12 C12[ C12 C12C12 [[ [[[
L3.5
L3 .5
L3 .5
L3.5
L3 .5
L3 .5
12" 16'-0" 12"
18'-0"
APPROX TOP OF BANK
6" MIN ABC WRAPPED
IN GEOTEXTILE
SUBGRADE EVALUATED AND COMPACTED PER
SPECIFICATIONS. CONTRACTOR TO COORDINATE
WITH ENGINEER FOR SOILS TESTING; ENGINEER
TO PROVIDE TESTING RESULTS TO CONSULTANT.
CONTRACTOR TO ASSUME THAT 1 FOOT OF
EXISTING SOILS HAS TO BE OVEREXCAVATED
BELOW THE DESIRED GRADE AND REPLACED
WITH CRUSHED STONE.
3' -7
2'-4"
4' -0
K
EY
B
EL
O W
3' -0
K
EY
B
EL
O W
12" 0 1 4'2
3/8"=1'-0"
1"=1'-0"
12" 6 1'0
CONC STAIR
S-5
#5@8", T&B, EW
SEE CIVIL FOR SLOPE
STABILIZATION AND
EROSION CONTROL
MEASURES 4'
-0
M
IN
S
EE
N O
TE
2'X2' SQ INTAKE
PIPE SUPPORT PIER,
SEE NOTE 7
8 #6 VERT HOOK
BARS, 3 EA FACE
#4 TIES @ 12" TYP
8' -0
5'-0"
HORIZONTAL
AIR RECEIVER
TANK PAD
S-5
3" Ø PVC SCUPPER
DRAIN, SEE NOTE 2
EDGE OF
CONC CURB
COPE CHANNEL
BOTTOM FLANGE TO
AVOID ANCHORS, TYP
S-4 G
6'-4" 4'-0" 5'-0"
S-4 E
3' -0
6'
-1 " 8'
-0
2' -2
S-4 F
S-5
TYP, 5 LOCATIONS
36"7'-9"16"6'-3" SEE NOTE 9
S-05-0601
AL HANDRAIL
S-2 C
D S-2
S-5
TYP, 4 LOCATIONS
SECTION C
1" = 1'-0" S-2
SECTION D
1" = 1'-0" S-2
3' -4
S
EE
N O
TE
x TOC 12.25
S-05-0601
AL HANDRAIL
SEE SECTION C
FOR REINFORCING.
TYP.
S-05-0601
AL HANDRAIL
E-W BRACING NOT
SHOWN FOR
CLARITY, TYP.
#6 @ 8" EW, T&B
12" MIN #57 STONE
WRAPPED IN GEOTEXTILE
SUBGRADE EVALUATED AND COMPACTED PER
SPECIFICATIONS. CONTRACTOR TO COORDINATE WITH
ENGINEER FOR SOILS TESTING; ENGINEER TO PROVIDE
TESTING RESULTS TO CONSULTANT. CONTRACTOR TO
ASSUME THAT 1 FOOT OF EXISTING SOILS HAS TO BE
OVEREXCAVATED BELOW THE DESIRED GRADE AND
REPLACED WITH CRUSHED STONE.
S-6
S-5
S-5
S-5
PIPE CL
SEE MECH
M-40-0308R
FABRICATED PIPE
SUPPORT AT FLANGE
EL VARIES, SEE CIVIL
SEE SECTION G/S-4
FOR FRAMING
DETAIL
S-4 G
S-4 G
5' -0
TYP
SIM,
TYP
HSS8
L3 L3
W
W
SEE NOTE 8, TYP
GALV CAP PL 3/8"
TYP EA HSS END
S-5
TYP
TYP
9' -8
SUBGRADE EVALUATED AND COMPACTED PER
SPECIFICATIONS. CONTRACTOR TO COORDINATE WITH
ENGINEER FOR SOILS TESTING; ENGINEER TO PROVIDE
TESTING RESULTS TO CONSULTANT. CONTRACTOR TO
ASSUME THAT 1 FOOT OF EXISTING SOILS HAS TO BE
OVEREXCAVATED BELOW THE DESIRED GRADE AND
REPLACED WITH CRUSHED STONE.
12" MIN #57 STONE
WRAPPED IN GEOTEXTILE
SHALL BE EVALUATED AND COMPACTED PER
SHALL BE EVALUATED AND COMPACTED PER
SHALL BE EVALUATED AND COMPACTED PER
EL A ±
EL C ±
EL B ± (SEE CIVIL)
EL D ±
EL C ±
HAZEN AND SAWYER
1000 NORTH ASHLEY DRIVE, SUITE 1000
TAMPA, FLORIDA 33602
PLAN
3/8" = 1'-0"
14'-0"
4'-0" 10'-0"
14'-0"
4'-0" 7'-0" 3'-0"
X EL A
X EL C
6' -6
CL HSS
2' -0
SECTION A
3/8" = 1'-0" S-3
A S-3
B S-3
SECTION B
3/8" = 1'-0" S-3
CL
3' -0
2' -0
H S S
HSS 5x5x1/4
3'-0"
CL CL
6"
3" 3"
CL HSS
HSS 4x4x1/4" AT VERTICAL
POSTS (2PCS), HSS 3X3X1/4"
AT BRACES (4 PCS)
BASE PL 1/2"x6"x11"
8"
1/ 2"
TY
P
2-3/4"Ø ADH ANCHORS
W/ 7" MIN EMBED
1" NON-SHRINK GROUT
SECTION C-C
1 1/2" = 1'-0"
C C
H S S
#5@8, EW,
T&B, TYP
#5@8" EW,
T&B
#5@8", EW,
EF, TYP
NOTES:
1. CONTRACTOR SHALL RETAIN GEOTECHNICAL
CONSULTANT MC SQUARED, INC. TO ASSESS EXPOSED
SUBGRADE AND CONFIRM CONDITIONS BASED ON
PREVIOUS RECOMMENDATIONS PRIOR TO PLACING
CONCRETE.
2. WINCH AND FAIRLEAD PROVIDED BY WINTECH
INTERNATIONAL. WINCH SHALL BE THE SPUR GEAR
HAND WINCH TYPE. FAIRLEAD SHALL BE THE FOUR
ROLLER DIRECTIONAL TYPE.
3. STEEL FAIRLEAD SUPPORT FRAME SHALL BE PAINTED IN
ACCORDANCE WITH SPECIFICATION SECTION 09 90 00.
4. CONCRETE CURBS ONLY REQUIRED AT SOUTH WINCH
PAD LOCATION.
5. CAPACITY OF WINCH SHALL BE 5 TON. WINCH SHALL
HAVE CAST STEEL DRUMS AND FRAMES AND RING GEAR
WITH TWO SPEEDS. WINCH SHALL HAVE REPLACEABLE
BRONZE BUSHINGS AND SPRING LOADED HOLDING DOG
WITH RELEASE HANDLE. WINCH SHALL BE PROVIDED
WITH 28-INCH HANDWHEEL OPERATOR WITH ABILITY TO
REMOVE AND UTILIZE POWER DRIVE PINION TO USE
MOTOR DRIVEN OPERATOR.