Appendix 4 is a Special Notices document for the Solid Waste IWTF Intake Pump Structure (IPS) project in Pinellas County, Florida, with Project Identification Number 002423A. The document provides critical operational guidelines for contractors working on the project, including specific requirements for maintaining the existing pumping system throughout the project duration, completing the new pump system connection within a 4-hour window, and providing seven days' notice to Solid Waste personnel before shutting down the water treatment plant. The contractor is restricted to working hours between 6:00am and 6:00pm, with all personnel required to be off the site by 6:00pm.
The notice emphasizes the project's operational constraints and coordination requirements, highlighting the need for minimal disruption to the existing water treatment infrastructure. While the document does not provide detailed pricing or funding information, it underscores the technical complexity of the project, which involves installing a new intake pump system with safety upgrades to improve the operational capacity of the water treatment facility at the Bridgeway Acre Landfill. The strict time limitations and notification requirements suggest a carefully planned intervention to upgrade critical infrastructure with minimal operational impact.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX 4
SPECIAL NOTICES
Solid Waste IWTF Intake Pump Structure (IPS)
P.I.D. No. 002423A
In Pinellas County, Florida
NOTICES TO CONTRACTORS
1. The Contractor shall maintain the existing pumping system to the water treatment plant during the entire duration of the project until the new pump system is installed and accepted.
2. The Contractor shall complete the connection of the new pump system to the existing force main in 4 hours period.
3. The Contractor shall notify Solid Waste personal seven days’ notice to allow them time to shut down the water treatment plant.
4. Hours of operation are within 6:00am to 6:00pm.