Appendix_1-Permits.pdf
PDF 711 KB Posted
- Attached to
- Solid Waste Industrial Waste Treatment Facility (IWTF) Intake Pump Station (IPS) PID: 002423A
- Solicitation number
- 23-0273-ITB-CP
- Issued by
- Pinellas County, Florida
About this file
This document is a Permit Index Appendix for the Solid Waste IWTF Intake Pump Structure (IPS) project, involving multiple agencies including Southwest Florida Water Management District (SWFWMD), Florida Department of Environmental Protection, and Pinellas County. The permit index details the regulatory requirements for a project involving improvements to an Industrial Water Treatment Plant's intake system, specifically focusing on pump station upgrades within the Bridgeway Acre Landfill. The project covers approximately 80 acres with a project-specific area of about 1 acre, located in Pinellas County, St. Petersburg.
The permit documentation indicates no permit charges will be assessed across all listed agencies, including for habitat management, dewatering, and National Pollutant Discharge Elimination System (NPDES) permits. The environmental resource permit modification (ERP No. 7341.003) was requested on 11/10/2020 for the Industrial Water Treatment Plant Intake System Improvements, with the primary goal of addressing current intake pump systems that do not operate at full design capacity and have reached the end of their operational lifespan. The project aims to install new intake pump systems with safety upgrades to minimize disruptions to water treatment operations, specifically for treating runoff water in Pond A to supply cooling towers at the Waste-to-Energy Plant.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX 1
PERMITS
P.I.D. NO. 002423A
Solid Waste IWTF Intake Pump Structure (IPS)
PERMIT INDEX
AGENCY PERMIT No. PERMIT FEE / OTHER
SWFWMD
7341.003 No permit charge
Florida Department of Environmental Protection
No FDEP Solid Waste Requirements
No permit charge
Pinellas County Habitat Management Permit
Issued to Contractor following the Pre-construction Meeting if applicable or as directed by the County
Dewatering Permit
Not required, dewatering within contained site of Solid Waste
National Pollutant Discharge Elimination System (NPDES) Permit
Not applicable. Discharge is contained within Solid Waste, protected by slurry wall. No discharge will convey to PC’s stormwater system.
Link to information regarding disclosure of County’s permits or fees:
http://www.leg.state.fl.us/statutes/index.cfm?mode=View%20Statutes&SubMenu=1&App_mode=Display_Statut e&Search_String=218.80&URL=0200-0299/0218/Sections/0218.80.html http://www.leg.state.fl.us/statutes/index.cfm?mode=View%20Statutes&SubMenu=1&App_mode=Display_Statute&Search_String=218.80&URL=0200-0299/0218/Sections/0218.80.html http://www.leg.state.fl.us/statutes/index.cfm?mode=View%20Statutes&SubMenu=1&App_mode=Display_Statute&Search_String=218.80&URL=0200-0299/0218/Sections/0218.80.html