Appendix_6-_WTE_Record_Dwgs(for_reference).pdf

PDF 76 MB Posted

Attached to
Solid Waste Industrial Waste Treatment Facility (IWTF) Intake Pump Station (IPS) PID: 002423A
Solicitation number
23-0273-ITB-CP
Issued by
Pinellas County, Florida

About this file

The file "Appendix_6-_WTE_Record_Dwgs(for_reference).pdf" appears to be a technical drawing reference document related to the Solid Waste Industrial Waste Treatment Facility (IWTF) Intake Pump Station (IPS) project for a Florida county government. The project involves replacing existing intake pump systems at the Bridgeway Acre Landfill's Industrial Water Treatment Plant (IWTP), which currently operate below full design capacity and have reached the end of their operational lifespan. The primary objective is to install new intake pump systems with enhanced safety features to ensure continuous water treatment operations that supply cooling tower water for the Waste-to-Energy Plant.

While specific pricing details are not provided in the referenced document, the project appears to be a critical infrastructure improvement aimed at maintaining operational efficiency and reliability of the county's waste management and water treatment infrastructure. The technical drawing reference suggests a comprehensive engineering approach to upgrading the pump station, with a focus on addressing current system limitations and implementing modern safety standards. The project represents a strategic investment in the county's water treatment capabilities, likely funded through municipal infrastructure or waste management budget allocations.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .