Attachment A Price-Cost Schedule Rock Island National Cemetery Grounds Maintenance.xlsx
XLSX spreadsheet 49 KB Posted
- Attached to
- Amendment 2 36C78625Q50038 Rock Island Grounds Maintenance & Irrigation Maintenance Service -- S208
- Solicitation number
- QSE--36C78625Q50038
About this file
The file is a Price-Cost Schedule for Rock Island National Cemetery Grounds Maintenance, detailing a comprehensive four-year contract with a base year and four option years running from April 1, 2025 to March 31, 2030. The solicitation (QSE--36C78625Q50038) is issued by the Department of Veterans Affairs National Cemetery Administration for grounds and irrigation maintenance services at the Rock Island National Cemetery in Moline, IL. The contract is a hybrid structure utilizing both Service Contract Act (SCA) and Davis Bacon Act (DBA) wage determinations.
The price schedule includes 19 contract line items (CLINs) covering extensive cemetery maintenance services such as turf management (mowing, aerating, overseeding), herbicide and insecticide applications, headstone maintenance (cleaning, trimming, alignment), tree services (pruning, removal, stump removal), and irrigation system management. Specific quantities include maintaining 60.87 acres, managing 26,955 headstones, trimming 45,152 flat markers, and maintaining 19,300 linear feet of curbing and sidewalks. The pricing structure allows for incremental increases in some service rates across option years, with no total contract value currently populated in the spreadsheet.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Rock Island National Cemetery Grounds Maintenance
| Base year | April 1 2025 to March 31, 2026 | ||||||
| Rock Island National Cemetery | |||||||
| CLIN | ITEM | QTY | UNIT | PER UNIT COST | UNIT PRICE | TOTAL PRICE | |
| 0001 | SCA | Mow all turf areas (60.87 acres) | 36 | JB | |||
| 0002 | SCA | Trimming (26,955 Headstones) | 36 | EA | |||
| 0003 | SCA | Blade Edge All Flat Markers (45,152) | 16 | EA | |||
| 0004 | SCA | Blade Edge All Curbing and Sidewalks (19,300 Linear Feet) | 18 | JB | |||
| 0005 | SCA | Core Aerate (60.87 Acres) | 2 | JB | |||
| 0006 | SCA | Overseeding (60.87 Acres) | 1 | JB | |||
| 0007 | SCA | 2 Pre-emergence herbicide applications, 2 post-emergence herbicide applications. | 4 | JB | |||
| 0008 | SCA | Fertilize, October, June, September 61 Acres | 3 | JB | |||
| 0009 | SCA | Turf renovation (40,000 Sq Feet) | 1 | SF | |||
| 0010 | SCA | Yellow Nutsedge Herbicide (60.88 Acres) | 2 | JB | |||
| 0011 | SCA | Grub insecticide in April & June (60.88 Acres) | 1 | EA | |||
| 0012 | SCA | Japenese Beetle Spray (45 trees) | 1 | JB | |||
| 0013 | DBA | Headstone cleaning (26,955 Headstones) twice per year. | 2 | EA | |||
| 0014 | SCA | Tree pruning | 20 | EA | |||
| 0015 | SCA | Tree Removal (12 inches or larger inside a burial section) | 5 | EA | |||
| 0016 | SCA | Tree Stump Removal | 1 | EA | |||
| 0017 | SCA | Irrigation start up in spring | 1 | EA | |||
| 0018 | SCA | Irrigation winterization in fall | 1 | EA | |||
| 0019 | DBA | Fine Tune Alignment (5,931 Headstones) | 1 | EA | |||
| BASE TOTAL: | $0.00 | ||||||
| BASE YEAR OPTION TOTAL: | $0.00 |
| Option Year 1 | April 1 2026 to March 31, 2027 | |||||||
| Rock Island National Cemetery | ||||||||
| CLIN | ITEM | QTY | UNIT | PER UNIT COST | UNIT PRICE | TOTAL PRICE | ||
| 1001 | SCA | Mow all turf areas (60.87 acres) | 36 | JB | ||||
| 1002 | SCA | Trimming (26,955 Headstones) | 36 | EA | ||||
| 1003 | SCA | Blade Edge All Flat Markers (45,152) | 16 | EA | ||||
| 1004 | SCA | Blade Edge All Curbing and Sidewalks (19,300 Linear Feet) | 18 | JB | ||||
| 1005 | SCA | Core Aerate (60.87 Acres) | 2 | JB | ||||
| 1006 | SCA | Overseeding (60.87 Acres) | 1 | JB | ||||
| 1007 | SCA | 2 Pre-emergence herbicide applications, 2 post-emergence herbicide applications. | 4 | JB | ||||
| 1008 | SCA | Fertilize, October, June, September 61 Acres | 3 | JB | ||||
| 1009 | SCA | Turf renovation (40,000 Sq Feet) | 1 | SF | ||||
| 1010 | SCA | Yellow Nutsedge Herbicide (60.88 Acres) | 2 | JB | ||||
| 1011 | SCA | Grub insecticide in April & June (60.88 Acres) | 1 | EA | ||||
| 1012 | SCA | Japenese Beetle Spray (45 trees) | 1 | JB | ||||
| 1013 | DBA | Headstone cleaning (26,955 Headstones) twice per year. | 2 | EA | ||||
| 1014 | SCA | Tree pruning | 20 | EA | ||||
| 1015 | SCA | Tree Removal (12 inches or larger inside a burial section) | 5 | EA | ||||
| 1016 | SCA | Tree Stump Removal | 1 | EA | ||||
| 1017 | SCA | Irrigation start up in spring | 1 | EA | ||||
| 1018 | SCA | Irrigation winterization in fall | 1 | EA | ||||
| 1019 | DBA | Fine Tune Alignment (5,931 Headstones) | 1 | EA | ||||
| BASE TOTAL: | $0.00 | |||||||
| OPTION TOTAL: | $0.00 | |||||||
| Option Year 2 | April 1 2027 to March 31, 2028 | |||||||
| Rock Island National Cemetery | ||||||||
| CLIN | ITEM | QTY | UNIT | PER UNIT COST | UNIT PRICE | TOTAL PRICE | ||
| 2001 | SCA | Mow all turf areas (60.87 acres) | 36 | JB | ||||
| 2002 | SCA | Trimming (26,955 Headstones) | 36 | EA | 1.1 | |||
| 2003 | SCA | Blade Edge All Flat Markers (45,152) | 16 | EA | ||||
| 2004 | SCA | Blade Edge All Curbing and Sidewalks (19,300 Linear Feet) | 18 | JB | ||||
| 2005 | SCA | Core Aerate (60.87 Acres) | 2 | JB | ||||
| 2006 | SCA | Overseeding (60.87 Acres) | 1 | JB | ||||
| 2007 | SCA | 2 Pre-emergence herbicide applications, 2 post-emergence herbicide applications. | 4 | JB | ||||
| 2008 | SCA | Fertilize, October, June, September 61 Acres | 3 | JB | ||||
| 2009 | SCA | Turf renovation (40,000 Sq Feet) | 1 | SF | ||||
| 2010 | SCA | Yellow Nutsedge Herbicide (60.88 Acres) | 2 | JB | ||||
| 2011 | SCA | Grub insecticide in April & June (60.88 Acres) | 1 | EA | ||||
| 2012 | SCA | Japenese Beetle Spray (45 trees) | 1 | JB | ||||
| 2013 | DBA | Headstone cleaning (26,955 Headstones) twice per year. | 2 | EA | ||||
| 2014 | SCA | Tree pruning | 20 | EA | ||||
| 2015 | SCA | Tree Removal (12 inches or larger inside a burial section) | 5 | EA | ||||
| 2016 | SCA | Tree Stump Removal | 1 | EA | ||||
| 2017 | SCA | Irrigation start up in spring | 1 | EA | ||||
| 2018 | SCA | Irrigation winterization in fall | 1 | EA | ||||
| 2019 | DBA | Fine Tune Alignment (5,931 Headstones) | 1 | EA | ||||
| BASE TOTAL: | $0.00 | |||||||
| OPTION TOTAL: | $0.00 |
| Option Year 3 | April 1 2028 to March 31, 2029 | |||||||
| Rock Island National Cemetery | ||||||||
| CLIN | ITEM | QTY | UNIT | PER UNIT COST | UNIT PRICE | TOTAL PRICE | ||
| 3001 | SCA | Mow all turf areas (60.87 acres) | 36 | JB | 1.15 | |||
| 3002 | SCA | Trimming (26,955 Headstones) | 36 | EA | ||||
| 3003 | SCA | Blade Edge All Flat Markers (45,152) | 16 | EA | ||||
| 3004 | SCA | Blade Edge All Curbing and Sidewalks (19,300 Linear Feet) | 18 | JB | ||||
| 3005 | SCA | Core Aerate (60.87 Acres) | 2 | JB | ||||
| 3006 | SCA | Overseeding (60.87 Acres) | 1 | JB | ||||
| 3007 | SCA | 2 Pre-emergence herbicide applications, 2 post-emergence herbicide applications. | 4 | JB | ||||
| 3008 | SCA | Fertilize, October, June, September 61 Acres | 3 | JB | ||||
| 3009 | SCA | Turf renovation (40,000 Sq Feet) | 1 | SF | ||||
| 3010 | SCA | Yellow Nutsedge Herbicide (60.88 Acres) | 2 | JB | ||||
| 3011 | SCA | Grub insecticide in April & June (60.88 Acres) | 1 | EA | ||||
| 3012 | SCA | Japenese Beetle Spray (45 trees) | 1 | JB | ||||
| 3013 | DBA | Headstone cleaning (26,955 Headstones) twice per year. | 2 | EA | ||||
| 3014 | SCA | Tree pruning | 20 | EA | ||||
| 3015 | SCA | Tree Removal (12 inches or larger inside a burial section) | 5 | EA | ||||
| 3016 | SCA | Tree Stump Removal | 1 | EA | ||||
| 3017 | SCA | Irrigation start up in spring | 1 | EA | ||||
| 3018 | SCA | Irrigation winterization in fall | 1 | EA | ||||
| 3019 | DBA | Fine Tune Alignment (5,931 Headstones) | 1 | EA | ||||
| BASE TOTAL: | $0.00 | |||||||
| OPTION TOTAL: | $0.00 |
| Option Year 4 | April 1 2029 to March 31, 2030 | |||||||
| Rock Island National Cemetery | ||||||||
| CLIN | ITEM | QTY | UNIT | PER UNIT COST | UNIT PRICE | TOTAL PRICE | ||
| 4001 | SCA | Mow all turf areas (60.87 acres) | 36 | JB | ||||
| 4002 | SCA | Trimming (26,955 Headstones) | 36 | EA | 1.2 | |||
| 4003 | SCA | Blade Edge All Flat Markers (45,152) | 16 | EA | ||||
| 4004 | SCA | Blade Edge All Curbing and Sidewalks (19,300 Linear Feet) | 18 | JB | ||||
| 4005 | SCA | Core Aerate (60.87 Acres) | 2 | JB | ||||
| 4006 | SCA | Overseeding (60.87 Acres) | 1 | JB | ||||
| 4007 | SCA | 2 Pre-emergence herbicide applications, 2 post-emergence herbicide applications. | 4 | JB | ||||
| 4008 | SCA | Fertilize, October, June, September 61 Acres | 3 | JB | ||||
| 4009 | SCA | Turf renovation (40,000 Sq Feet) | 1 | SF | ||||
| 4010 | SCA | Yellow Nutsedge Herbicide (60.88 Acres) | 2 | JB | ||||
| 4011 | SCA | Grub insecticide in April & June (60.88 Acres) | 1 | EA | ||||
| 4012 | SCA | Japenese Beetle Spray (45 trees) | 1 | JB | ||||
| 4013 | DBA | Headstone cleaning (26,955 Headstones) twice per year. | 2 | EA | ||||
| 4014 | SCA | Tree pruning | 20 | EA | ||||
| 4015 | SCA | Tree Removal (12 inches or larger inside a burial section) | 5 | EA | ||||
| 4016 | SCA | Tree Stump Removal | 1 | EA | ||||
| 4017 | SCA | Irrigation start up in spring | 1 | EA | ||||
| 4018 | SCA | Irrigation winterization in fall | 1 | EA | ||||
| 4019 | DBA | Fine Tune Alignment (5,931 Headstones) | 1 | EA | ||||
| BASE TOTAL: | $0.00 | |||||||
| OPTION TOTAL: | $0.00 |
| CONTRACT BASE TOTAL: | $0.00 |
| CONTRACT OPTION TOTAL: | $0.00 |
| CONTRACT GRAND TOTAL: | $0.00 |
Sheet2
File details come from the government source that posted it. Updated .