This is a pricing schedule spreadsheet for grounds maintenance and irrigation services at Rock Island National Cemetery in Moline, IL. The document outlines Contract Line Item Numbers (CLINs) and quantities for a base year (April 1, 2025 - March 31, 2026) and four option years through March 31, 2030.

The scope includes recurring services such as mowing 60.87 acres (36 times per year), trimming 26,955 headstones (36 times per year), edging 45,152 flat markers (16 times per year), herbicide applications, fertilization, tree maintenance, and irrigation system startup/winterization. Specific DBA-wage items include headstone cleaning (twice yearly) and headstone alignment (5,931 stones), while all other items fall under SCA wage determinations. The spreadsheet is structured as a blank pricing template where vendors must input their per-unit costs and total prices for each line item across the base and option years.

View the file

Other files

File Type Posted
Attachment F Headstone Raise and Realignment Guidance.pdf PDF
Attachment A Price-Cost Schedule Rock Island National Cemetery Grounds Maintenance.xlsx XLSX spreadsheet
3678625Q50038 0002.docx DOCX document
3678625Q50038 0001 Ground Maintenance.docx DOCX document
Attachment E Wage Determination Davis Bacon Act IL20250001.pdf PDF
36C78625Q50038 Combined Synopsis Solicitation Rock Island Grounds Maintenance.docx DOCX document
Attachment G Subcontractor Participation Document.pdf PDF
Attachment D -- Past Performance Questionnaire Grounds Maintenance.pdf PDF
Attachment B- Rock Island Grounds Maintenance Performance Work Statement.docx DOCX document
Attachment C Wage Determination 2015-5011 SCA.pdf PDF
Attachment I - Rock Island National Cemetery Map.pdf PDF
Attachment H NCA National Shrine standard.pdf PDF
3678625Q50038 0001 Ground Maintenance.docx DOCX document
Attachment D -- Past Performance Questionnaire Grounds Maintenance.pdf PDF
36C78625Q50038 Combined Synopsis Solicitation Rock Island Grounds Maintenance.docx DOCX document
Attachment B- Rock Island Grounds Maintenance Performance Work Statement.docx DOCX document
Attachment C Wage Determination 2015-5011 SCA.pdf PDF
Attachment A Price-Cost Schedule Rock Island National Cemetery Grounds Maintenance.xlsx XLSX spreadsheet
Attachment E Wage Determination Davis Bacon Act IL20250001.pdf PDF
Attachment I - Rock Island National Cemetery Map.pdf PDF
Attachment F Headstone Raise and Realignment Guidance.pdf PDF
Attachment H NCA National Shrine standard.pdf PDF
Attachment E Wage Determination Davis Bacon Act IL20250001.pdf PDF
36C78625Q50038 Combined Synopsis Solicitation Rock Island Grounds Maintenance.docx DOCX document
Attachment H NCA National Shrine standard.pdf PDF
Attachment C Wage Determination 2015-5011 SCA.pdf PDF
Attachment F Headstone Raise and Realignment Guidance.pdf PDF
Attachment B- Rock Island Grounds Maintenance Performance Work Statement.docx DOCX document
Attachment I - Rock Island National Cemetery Map.pdf PDF
Attachment D -- Past Performance Questionnaire Grounds Maintenance.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Rock Island National Cemetery Grounds Maintenance

Base yearApril 1 2025 to March 31, 2026
Rock Island National Cemetery
CLINITEMQTYUNITPER UNIT COSTUNIT PRICETOTAL PRICE
0001SCAMow all turf areas (60.87 acres)36JB
0002SCATrimming (26,955 Headstones)36EA
0003SCABlade Edge All Flat Markers (45,152)16EA
0004SCABlade Edge All Curbing and Sidewalks (19,300 Linear Feet)18JB
0005SCACore Aerate (60.87 Acres)2JB
0006SCAOverseeding (60.87 Acres)1JB
0007SCA2 Pre-emergence herbicide applications, 2 post-emergence herbicide applications.4JB
0008SCAFertilize, October, June, September 61 Acres3JB
0009SCATurf renovation (40,000 Sq Feet)1SF
0010SCAYellow Nutsedge Herbicide (60.88 Acres)2JB
0011SCAGrub insecticide in April & June (60.88 Acres)1EA
0012SCAJapenese Beetle Spray (45 trees)1JB
0013DBAHeadstone cleaning (26,955 Headstones) twice per year.2EA
0014SCATree pruning20EA
0015SCATree Removal (12 inches or larger inside a burial section)5EA
0016SCATree Stump Removal1EA
0017SCAIrrigation start up in spring1EA
0018SCAIrrigation winterization in fall1EA
0019DBAFine Tune Alignment (5,931 Headstones)1EA
BASE TOTAL:$0.00
BASE YEAR OPTION TOTAL:$0.00
Option Year 1April 1 2026 to March 31, 2027
Rock Island National Cemetery
CLINITEMQTYUNITPER UNIT COSTUNIT PRICETOTAL PRICE
1001SCAMow all turf areas (60.87 acres)36JB
1002SCATrimming (26,955 Headstones)36EA
1003SCABlade Edge All Flat Markers (45,152)16EA
1004SCABlade Edge All Curbing and Sidewalks (19,300 Linear Feet)18JB
1005SCACore Aerate (60.87 Acres)2JB
1006SCAOverseeding (60.87 Acres)1JB
1007SCA2 Pre-emergence herbicide applications, 2 post-emergence herbicide applications.4JB
1008SCAFertilize, October, June, September 61 Acres3JB
1009SCATurf renovation (40,000 Sq Feet)1SF
1010SCAYellow Nutsedge Herbicide (60.88 Acres)2JB
1011SCAGrub insecticide in April & June (60.88 Acres)1EA
1012SCAJapenese Beetle Spray (45 trees)1JB
1013DBAHeadstone cleaning (26,955 Headstones) twice per year.2EA
1014SCATree pruning20EA
1015SCATree Removal (12 inches or larger inside a burial section)5EA
1016SCATree Stump Removal1EA
1017SCAIrrigation start up in spring1EA
1018SCAIrrigation winterization in fall1EA
1019DBAFine Tune Alignment (5,931 Headstones)1EA
BASE TOTAL:$0.00
OPTION TOTAL:$0.00
Option Year 2April 1 2027 to March 31, 2028
Rock Island National Cemetery
CLINITEMQTYUNITPER UNIT COSTUNIT PRICETOTAL PRICE
2001SCAMow all turf areas (60.87 acres)36JB
2002SCATrimming (26,955 Headstones)36EA1.1
2003SCABlade Edge All Flat Markers (45,152)16EA
2004SCABlade Edge All Curbing and Sidewalks (19,300 Linear Feet)18JB
2005SCACore Aerate (60.87 Acres)2JB
2006SCAOverseeding (60.87 Acres)1JB
2007SCA2 Pre-emergence herbicide applications, 2 post-emergence herbicide applications.4JB
2008SCAFertilize, October, June, September 61 Acres3JB
2009SCATurf renovation (40,000 Sq Feet)1SF
2010SCAYellow Nutsedge Herbicide (60.88 Acres)2JB
2011SCAGrub insecticide in April & June (60.88 Acres)1EA
2012SCAJapenese Beetle Spray (45 trees)1JB
2013DBAHeadstone cleaning (26,955 Headstones) twice per year.2EA
2014SCATree pruning20EA
2015SCATree Removal (12 inches or larger inside a burial section)5EA
2016SCATree Stump Removal1EA
2017SCAIrrigation start up in spring1EA
2018SCAIrrigation winterization in fall1EA
2019DBAFine Tune Alignment (5,931 Headstones)1EA
BASE TOTAL:$0.00
OPTION TOTAL:$0.00
Option Year 3April 1 2028 to March 31, 2029
Rock Island National Cemetery
CLINITEMQTYUNITPER UNIT COSTUNIT PRICETOTAL PRICE
3001SCAMow all turf areas (60.87 acres)36JB1.15
3002SCATrimming (26,955 Headstones)36EA
3003SCABlade Edge All Flat Markers (45,152)16EA
3004SCABlade Edge All Curbing and Sidewalks (19,300 Linear Feet)18JB
3005SCACore Aerate (60.87 Acres)2JB
3006SCAOverseeding (60.87 Acres)1JB
3007SCA2 Pre-emergence herbicide applications, 2 post-emergence herbicide applications.4JB
3008SCAFertilize, October, June, September 61 Acres3JB
3009SCATurf renovation (40,000 Sq Feet)1SF
3010SCAYellow Nutsedge Herbicide (60.88 Acres)2JB
3011SCAGrub insecticide in April & June (60.88 Acres)1EA
3012SCAJapenese Beetle Spray (45 trees)1JB
3013DBAHeadstone cleaning (26,955 Headstones) twice per year.2EA
3014SCATree pruning20EA
3015SCATree Removal (12 inches or larger inside a burial section)5EA
3016SCATree Stump Removal1EA
3017SCAIrrigation start up in spring1EA
3018SCAIrrigation winterization in fall1EA
3019DBAFine Tune Alignment (5,931 Headstones)1EA
BASE TOTAL:$0.00
OPTION TOTAL:$0.00
Option Year 4April 1 2029 to March 31, 2030
Rock Island National Cemetery
CLINITEMQTYUNITPER UNIT COSTUNIT PRICETOTAL PRICE
4001SCAMow all turf areas (60.87 acres)36JB
4002SCATrimming (26,955 Headstones)36EA1.2
4003SCABlade Edge All Flat Markers (45,152)16EA
4004SCABlade Edge All Curbing and Sidewalks (19,300 Linear Feet)18JB
4005SCACore Aerate (60.87 Acres)2JB
4006SCAOverseeding (60.87 Acres)1JB
4007SCA2 Pre-emergence herbicide applications, 2 post-emergence herbicide applications.4JB
4008SCAFertilize, October, June, September 61 Acres3JB
4009SCATurf renovation (40,000 Sq Feet)1SF
4010SCAYellow Nutsedge Herbicide (60.88 Acres)2JB
4011SCAGrub insecticide in April & June (60.88 Acres)1EA
4012SCAJapenese Beetle Spray (45 trees)1JB
4013DBAHeadstone cleaning (26,955 Headstones) twice per year.2EA
4014SCATree pruning20EA
4015SCATree Removal (12 inches or larger inside a burial section)5EA
4016SCATree Stump Removal1EA
4017SCAIrrigation start up in spring1EA
4018SCAIrrigation winterization in fall1EA
4019DBAFine Tune Alignment (5,931 Headstones)1EA
BASE TOTAL:$0.00
OPTION TOTAL:$0.00
CONTRACT BASE TOTAL:$0.00
CONTRACT OPTION TOTAL:$0.00
CONTRACT GRAND TOTAL:$0.00