3678625Q50038 0001 Ground Maintenance.docx

DOCX document 27 KB Posted

Attached to
Amendment 2 36C78625Q50038 Rock Island Grounds Maintenance & Irrigation Maintenance Service -- S208
Solicitation number
QSE--36C78625Q50038
Issued by

About this file

This document is an Amendment (Standard Form 30) for the Rock Island National Cemetery Grounds Maintenance & Irrigation Maintenance Service solicitation (Solicitation Number: QSE--36C78625Q50038). The amendment addresses several clarifying questions from potential offerors, including details about wage determinations, headstone alignment, mowing requirements, and debris cleanup. Key clarifications include confirming that 5,931 headstones will undergo fine-tune alignment with correction for grade issues, no slit seeding is required, and minor debris cleanup is expected during mowing (with storm cleanup handled by cemetery staff).

The contract is a hybrid service contract for the Department of Veterans Affairs National Cemetery Administration, covering ground and irrigation maintenance at Rock Island National Cemetery in Moline, IL. It will be an Indefinite Delivery/Indefinite Quantity (IDIQ) contract with a base year and four option years, utilizing both Service Contract Act (SCA) and Davis-Bacon Act (DBA) wage determinations depending on the specific contract line items. Contractors are required to acknowledge the amendment, and the solicitation involves detailed specifications for cemetery ground maintenance services.

View the file

Other files

File Type Posted
Attachment F Headstone Raise and Realignment Guidance.pdf PDF
Attachment A Price-Cost Schedule Rock Island National Cemetery Grounds Maintenance.xlsx XLSX spreadsheet
3678625Q50038 0002.docx DOCX document
3678625Q50038 0001 Ground Maintenance.docx DOCX document
Attachment E Wage Determination Davis Bacon Act IL20250001.pdf PDF
36C78625Q50038 Combined Synopsis Solicitation Rock Island Grounds Maintenance.docx DOCX document
Attachment G Subcontractor Participation Document.pdf PDF
Attachment D -- Past Performance Questionnaire Grounds Maintenance.pdf PDF
Attachment B- Rock Island Grounds Maintenance Performance Work Statement.docx DOCX document
Attachment C Wage Determination 2015-5011 SCA.pdf PDF
Attachment I - Rock Island National Cemetery Map.pdf PDF
Attachment H NCA National Shrine standard.pdf PDF
Attachment D -- Past Performance Questionnaire Grounds Maintenance.pdf PDF
36C78625Q50038 Combined Synopsis Solicitation Rock Island Grounds Maintenance.docx DOCX document
Attachment B- Rock Island Grounds Maintenance Performance Work Statement.docx DOCX document
Attachment C Wage Determination 2015-5011 SCA.pdf PDF
Attachment A Price-Cost Schedule Rock Island National Cemetery Grounds Maintenance.xlsx XLSX spreadsheet
Attachment E Wage Determination Davis Bacon Act IL20250001.pdf PDF
Attachment I - Rock Island National Cemetery Map.pdf PDF
Attachment F Headstone Raise and Realignment Guidance.pdf PDF
Attachment H NCA National Shrine standard.pdf PDF
Attachment A Price-Cost Schedule Rock Island National Cemetery Grounds Maintenance.xlsx XLSX spreadsheet
Attachment E Wage Determination Davis Bacon Act IL20250001.pdf PDF
36C78625Q50038 Combined Synopsis Solicitation Rock Island Grounds Maintenance.docx DOCX document
Attachment H NCA National Shrine standard.pdf PDF
Attachment C Wage Determination 2015-5011 SCA.pdf PDF
Attachment F Headstone Raise and Realignment Guidance.pdf PDF
Attachment B- Rock Island Grounds Maintenance Performance Work Statement.docx DOCX document
Attachment I - Rock Island National Cemetery Map.pdf PDF
Attachment D -- Past Performance Questionnaire Grounds Maintenance.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 03-10-2025 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172

3678625Q50038

X X X See CONTINUATION Page X The purpose of this amendment is to answers questions from prospective offerors and clarify issues.

All offerors are required to sign and return a copy of this amendment.

Olalekan Ismail Contracting Officer

CONTINUATION PAGE

Questions for Rock Island Cemetery Solicitation

1. The wage determination included is for CONSTRUCTION work. Is there any work covered under that WD and if so, can we get a SCA wage determination?

CLINS 0013 & 0018 are covered under DBA while the other are covered under SCA Current rates can be found on Wage Determinations | SAM.gov

2. For Fine Tune Alignment, in the SOW there is language stating it is “Bump and Run” only, However, in another section it describes Raise and Realign. Will the 5931 Headstones in the Price Schedule be Fine Tune Alignment only?

The 5931 headstones will be Fine Tune Aligned and if needed, “those headstones that are below or above allowable grade shall be fixed to proper height”. Allowable grade is 24”-26” with a pleasing top line.

3. Overseeding- Specification seems to be related to slit seeding not overseeding. Will there be any slit seeding required as part of this solicitation?

That is an error in the SOW, no slit seeding is required as part of this solicitation.

4. Under the Mowing SOW - Contractor is responsible for collection and disposal of all unsightly flowers, debris, and trash before and after each mowing and trimming event within the Cemetery. Debris and Trash is any item, material, or foreign object not permanently attached to or planted within the Cemetery grounds and boundaries. Items include, but are not limited to, fallen twigs and branches that are under ten (10) inches (25.40 cm) in diameter, paper products, cigarette butts, gum, glass and metal products, plastic and any other synthetic items, loose rock and stone over three (3) inches (7.62 cm) in diameter that are not the apparent result of an interment.

The question is the large limbs required to be picked up. A 10” diameter branch can be quite large. If the debris is caused by a storm, will that be covered under a different Line Item or contract?

The cemetery staff will do all storm clean-up.

If the cemetery gets hits by a storm and cleanup takes a week or so, is that considered part of the Mowing CLIN?

The cemetery staff will do all storm clean-up.

There is a new area towards the Confederate Cemetery portion between Section 8-12, by the pathway and road that is rough. Will that area be repaired before we mow it?

Yes, it will be mowed.

A 10” branch is not a twig and some time and effort will be needed to clean it up, as it can be quite large. Would that be covered under Tree Pruning, or Removal? Is there an area on-site to dispose of any twigs or branches or do they have to be hauled off-site? - If a large limb is on the ground the cemetery staff will remove it. Yes, there is an area on-site to dispose of any twigs or branches.

The price schedule spreadsheet is not adding up correctly.

Please use your spreadsheet in the same format if that one is corrupt.

Is the mowing CLIN debris cleanup meant for just minor cleanup or a full scale storm cleanup operation?

This is just minor cleanup. Full scale storm clean up will be by the cemetery staff.

File details come from the government source that posted it. Updated .