PWS_Tier 2 MCPV Trailer (DRAFT).pdf
PDF 332 KB Posted
- Solicitation number
- 26-R-0000194
About this file
This is a Performance Work Statement (PWS) for a Tier 2 Gooseneck Mobile Command Post Vehicle (MCPV) Trailer system issued by the Federal Bureau of Investigation (FBI) Finance and Facilities Division Procurement Section, dated 10 April 2026, for the Critical Incident Response Group/Tactical Response Unit (CIRG/TRU).
The contractor shall design, engineer, manufacture, integrate, test, deliver, and support Tier 2 MCPV trailer systems under an Indefinite Delivery/Indefinite Quantity (IDIQ) contract vehicle. The MCPV system must provide secure, resilient command, control, communications, and computing (C4) capabilities supporting emergency response, investigations, and interagency operations. Key performance requirements include: support for 15-20 simultaneous workstations; gooseneck trailer configuration not exceeding 13 feet in height with a walkable roof; compatibility with a Class 4 prime hauler (F-450 High Output equivalent, 500hp/1000 ft-lb torque minimum); rapid deployment achieving full operational capability within 30 minutes; operational availability of at least 95%; and extended operations of 72+ hours without external infrastructure. The system must incorporate multi-band, multi-path communications (satellite with LEO capability, cellular, and RF systems); diesel generator power with 20% reserve capacity; redundant heating and cooling; environmental control suitable for North American climates; fire detection and suppression; intrusion detection; 360-degree surveillance capability; GPS tracking with web-based remote access; and a minimum 15-year service life. Deliverables include system design package, as-built documentation, test and acceptance reports, training materials, and warranty documentation. The contractor must maintain ISO 9001 certification and comply with applicable federal, state, and local vehicle safety regulations. Warranty requirements specify 5 years for electrical systems and materials/workmanship, and 10 years for structural components. Post-delivery support must include maintenance, repair services, and technical support. Acceptance criteria require successful functional testing, performance verification, minimum 50-mile road testing, and delivery of all documentation and training materials.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI_Tier 2 MCPV Trailer (UPDATED).pdf | ||
| Attachment _Technical Specifications (MCPV).docx | DOCX document | |
| PWS_Tier 2 MCPV Trailer_22JUN26 (DRAFT).docx | DOCX document | |
| RFI_Tier 2 MCPV Trailer (UPDATED).pdf | ||
| RFI_Tier 2 MCPV Trailer.pdf | ||
| RFI_Tier 2 MCPV Trailer.pdf | ||
| RFI_Tier 2 MCPV Trailer.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL BUREAU OF INVESTIGATION
FINANCE AND FACILITIES DIVISION | PROCUREMENT SECTION
Performance Work Statement (PWS)
Tier 2 Mobile Command Post Vehicle (MCPV) Trailer
For
CIRG/TRU
10 APRIL 2026
1. Scope
The Contractor shall design, engineer, manufacture, integrate, test, deliver, and support Tier 2 Gooseneck Mobile Command Post Vehicle (MCPV) Trailer systems and associated prime hauler integration under an Indefinite Delivery/Indefinite Quantity (IDIQ) contract.
The MCPV system shall provide mobile command, control, communications, and computing (C4) capabilities in support of government missions including emergency response, investigations, and interagency operations.
2. Applicable Documents
The Contractor shall comply with:
• Government-furnished requirements/specifications
• Applicable federal, state, and local vehicle and safety regulations
• Industry standard, ISO 9001 Certification
3. Requirements (Performance-Based)
3.1 System-Level Performance Requirements
The Contractor shall deliver an Tier 2 MCPV trailer system that:
• Provides secure, resilient C4 capability across classified and unclassified environments
• Supports simultaneous operations for a minimum of 15 workstations not to exceed 20 workstations.
• Goosneck trailer should not exceed 13 feet in height and be able to have a walkable roof to allow supplemental equipment to be secured
• Enables continuous operations in austere environments without reliance on external infrastructure
• Achieves full operational capability within a rapid deployment timeframe (target:
≤ 30 minutes setup)
• Maintains operational availability ≥ 95%
3.2 Mobility and Transportability
The MCPV system shall:
• Be road-legal across CONUS and compatible with a Class 4 prime hauler (F-450 High Output or equivalent, 5 passenger, which operates on a 6 wheel “dually” configuration with minimum 500hp/1000 Ft/Lb Torque
• Be capable of safe operation at highway speeds and emergency Law Enforcement response
• Include self-leveling/stabilization systems enabling deployment on uneven terrain
• Maintain safe weight distribution and towing compatibility
3.3 Power and Energy Systems
The Contractor shall provide a diesel generator power system that:
• Supports 100% of mission load with ≥20% reserve capacity
• Onboard generator mounted to prime hauler
• Provides redundant power options, including:
o Shore power or commercial generator capability
• Enables continuous operations for extended durations (≥72 hours objective)
• Minimize acoustic signature inside MCPV
3.4 Communications and C4 Integration
The Tier 2 MCPV trailer system shall:
• Provide multi-band, multi-path communications, including:
o Satellite (including LEO capability) o Cellular o RF systems
• Support simultaneous voice, video, and data transmission at each workstation
• Provide interoperability with government systems and partner agencies
• Enable secure network segmentation (e.g., multiple enclaves)
• Include internal and external connectivity interfaces for mission expansion
3.5 Interior Workspace and Human Systems Integration
The Contractor shall design an interior that:
• Supports efficient workflow and collaboration
• Includes:
o Workstations with power/data access (Each workstation shall have four
(4) data ports) o Conference/briefing capability o Integrated display systems (Minimum four (4) internal and one (1) external displays)
• Maintains:
o Safe egress pathways (Two exit/entry points) o Ergonomic layout
Use of slide out(s) to maximize interior space o Environmental comfort (temperature, lighting, noise ≤ 60 dB objective)
3.6 Environmental Control
The Tier 2 MCPV trailer shall:
• Maintain operational temperature ranges suitable for all North American climates
• Provide redundant heating and cooling systems
• Ensure adequate ventilation and air quality
3.7 Safety and Security
The Contractor shall ensure:
• Compliance with all applicable safety standards
• Integration of:
o Fire detection and suppression systems o Carbon monoxide detection o Emergency lighting and exits
• Physical security including:
o Controlled access (keyed to match all doors) o Intrusion detection o Surveillance systems (360° coverage objective when operational)
3.8 Situational Awareness and Tracking
• Provide real-time tracking and monitoring capability, including:
o GPS location tracking o Remote web-based access
• Include status monitoring sensors for:
o Doors, slides, mast, and critical systems
• Ensure tracking systems are isolated from operational networks
3.9 Integration Requirements
The Contractor shall:
• Ensure full integration between trailer and prime hauler systems
• Provide interoperability with Government Furnished Equipment (GFE)
• Design for modularity and future upgrades
3.10 Reliability and Maintainability
• Be designed for a minimum service life of 15 years
• Enable rapid maintenance and repair
• Include diagnostics and accessible service points
• Support fleet-level sustainment
4. Deliverables
Deliverable Description Timing
System Design Package Drawings, schematics, architecture Design Phase
As-Built Documentation Final system documentation Delivery
Test & Acceptance Reports Verification of requirements Pre-Acceptance
Training Materials Operator & maintenance training Delivery
Warranty Documentation Coverage and procedures Delivery
5. Performance Metrics / Service Levels
Metric Threshold Objective
System Availability ≥ 90% ≥ 95%
Setup Time ≤ 90 min ≤ 60 min
Operational Duration ≥ 48 hrs ≥ 72 hrs
Metric Threshold Objective
Noise Level ≤ 70 dB ≤ 60 dB
6. Quality Assurance
The Government will:
• Conduct design reviews (PDR/CDR)
• Perform in-process inspections
• Execute final acceptance testing
• Validate performance against RTM
The Contractor shall:
• Maintain a quality management system
• Provide inspection and test plans
7. Acceptance Criteria
Acceptance is contingent upon:
• Successful completion of functional testing
• Verification of performance requirements
• Completion of road testing (minimum 50 miles)
• Delivery of all documentation and training
8. Warranty and Support
The Contractor shall provide:
• Minimum warranties:
o Electrical systems: 5 years o Structural components: 10 years o Materials/workmanship: 5 years
• Post-delivery support capability, including:
o Maintenance o Repair services o Technical support
9. IDIQ Ordering Structure
The Government may issue task orders for:
• MCPV design and production
• System upgrades or modifications
• Maintenance and sustainment services
10. Government Furnished Information (GFI)
The Government will provide:
• Reference design specifications (for baseline expectations)
• Integration requirements for existing systems
• Operational use cases
| 1. Scope |
| 2. Applicable Documents |
| 3. Requirements (Performance-Based) |
| 3.1 System-Level Performance Requirements |
| 3.2 Mobility and Transportability |
| 3.3 Power and Energy Systems |
| 3.4 Communications and C4 Integration |
| 3.5 Interior Workspace and Human Systems Integration |
| 3.6 Environmental Control |
| 3.7 Safety and Security |
| 3.8 Situational Awareness and Tracking |
| 3.9 Integration Requirements |
| 3.10 Reliability and Maintainability |
| 4. Deliverables |
| 5. Performance Metrics / Service Levels |
| 6. Quality Assurance |
| 7. Acceptance Criteria |
| 8. Warranty and Support |
| 9. IDIQ Ordering Structure |
| 10. Government Furnished Information (GFI) |
File details come from the government source that posted it. Updated .