PWS Attachment 5 RFP 75N98020R00014.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Radiation Safety Services
Solicitation number
75N98020R00014
Issued by

View the file

Other files

File Type Posted
Amendment 0003 75N98020R00014.pdf PDF
Amendment 0002 75N98020R00014.pdf PDF
Solicitation Attachment 1 RFP 75N98020R00014 Updated 642020.xlsx XLSX spreadsheet
RFP 75N98020R00014 Final 52920.docx DOCX document
RFP 75N98020R00014 QA .docx DOCX document
Amendment 0001 75N98020R00014.pdf PDF
PWS Attachment 7 RFP 75N98020R00014.xls XLS spreadsheet
PWS Attachment 4 RFP 75N98020R00014.docx DOCX document
PWS Attachment 2 RFP 75N98020R00014.docx DOCX document
PWS Attachment 6 RFP 75N98020R00014.docx DOCX document
PWS Attachment 13 RFP 75N98020R00014.pdf PDF
Solicitation Attachment 2 RFP 75N98020R00014.docx DOCX document
PWS Attachment 8 RFP 75N98020R00014.pdf PDF
PWS Attachment 9 RFP 75N98020R00014.pdf PDF
PWS Attachment 1 RFP 75N98020R00014.docx DOCX document
PWS Attachment 14 RFP 75N98020R00014.xls XLS spreadsheet
RFP 75N98020R00014 Final.docx DOCX document
Solicitation Attachment 3 75N98020R00014.docx DOCX document
PWS Attachment 3 RFP 75N98020R00014.docx DOCX document
PWS Attachment 11 RFP 75N98020R00014.docx DOCX document
PWS Attachment 10 RFP 75N98020R00014.pdf PDF
Solicitation Attachment 1 RFP 75N98020R00014.xlsx XLSX spreadsheet
Solicitation Attachment 4 RFP 75N98020R00014.docx DOCX document
PWS Attachment 12 RFP 75N98020R00014.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PWS Attachment 5-QASP
Required Service (Performance Requirement)Standard (Performance Standard)Method of Surveillance (MS)Acceptable Quality Levels (AQL)Points for Reduction of Bonus
Number of non-compliant* surveys
A. Comprehensive, corridor, monthly, weekly, 10 CFR 35 weekly, alpha and naturally occurring alpha surveys:1. Surveys shall be completed during the period in which they are due. Some surveys may not be due each month (i.e. Lab clearance and weekly surveys)Comparison of completed surveys to a list generated by the database indicating the labs required to have a survey performed for that period.00
11
22
33
44
55
6-1010
11+2020
2. Comprehensive surveys shall be completed and submitted by 4pm of the second workday following the survey.The contractor shall permit monitoring of the time between initial survey completion and survey reporting.98%-100%
96%-97.99%
94%-95.99%
90%-93.99%
88%-89.99%
85%-87.99%
83%-84.99%
80%-82.99%
<79.99%
2. Survey reports shall be submitted in an acceptable format, with accurate content. Surveys shall be conducted in accordance with the Statement of Work.The contractor shall utilize DRS database*** to track and report unacceptable survey statistics. DRS oversight will apply, as DRS may spot-check the tracking and reporting data.0-20
31
42
53
64
7-85
9-1010
11+2020
3. All reports and supporting documentation shall be submitted in accordance with the time frames outlined in the Statement of Work.Cotractor shall utilize DRS database*** to track and report data input times. DRS may spot-check entered data for timeliness and accuracy.0-50
6-102
11-154
16+1010
4. Data requiring database entry shall be entered completely and accurately. Utilize methods to track and report accuracy.DRS oversight will apply, as DRS may spot-check the tracking & report completion and accuracy.00
1-25
3+1010
Laboratory Clearance Surveys:1. Surveys shall be completed during the period in which they are due. Some surveys may not be due each month (i.e. Lab clearance and weekly surveys)Comparison of completed surveys to a list generated by the database indicating the labs required to have a survey performed for that period.00
1-23
3-56
6+1010
Major Deficiencies2. Survey reports shall be submitted in an acceptable format, with accurate content. Surveys shall be conducted in accordance with the Statement of Work.The contractor shall utilize DRS database*** to track and report unacceptable survey statistics. DRS oversight will apply, as DRS may spot-check the tracking and reporting data.00
1-25
3-410
5-615
7+2020
Minor Deficiencies2. Survey reports shall be submitted in an acceptable format, with accurate content. Surveys shall be conducted in accordance with the Statement of Work.The contractor shall utilize DRS database*** to track and report unacceptable survey statistics. DRS oversight will apply, as DRS may spot-check the tracking and reporting data.0-20
3-42
5-64
7-88
9-1012
11-1216
13+2020
3. All reports and supporting documentation shall be submitted in accordance with the time frames outlined in the Statement of Work.Contractor shall utilize DRS database*** to track and report data input times. DRS may spot-check entered data for timeliness and accuracy.0-20
3-54
6-98
10+1010
4. Data requiring database entry shall be entered completely and accurately. Utilize methods to track and report accuracy.DRS oversight will apply, as DRS may spot-check the tracking & report completion and accuracy.00
1-25
3+1010
Number of non-compliant security checks
B. Security Checks:1. Security checks shall be completed within the time frame outlined in the statement of work. **Review security check results for each cycle; random inspections by a member of the Division of Radiation Safety (DRS).00
11
22
3-45
510
6+2020
2. Results shall be completely and accurately documented. Data requiring database entry shall be entered completely and accurately. Utilize methods to track and report accuracy.Review of lab surveillance forms. DRS oversight will apply, as DRS may spot-check the tracking and report completion and accuracy.0-10
2-31
42
53
65
7+1010
3. Unsecured radioactive materials were secured by contractor or notified DRS.Review of lab surveillance forms.0

blade_runner: blade_runner:

changed from 100% and <100%0
>=12020
4. All reports and supporting documentation shall be submitted in accordance with the time frames outlined in the Statement of Work.The contractor shall utilize DRS database*** to track and report data input times. DRS may spot-check entered data for timeliness and accuracy.0-100
11-202
21-304
31+1010
Percent of non-compliant elements
C. Calibrations:1. Exposure meters calibrated within required time frame.Spot checks by DRS00
110
220
3+3030
2. Contamination meters calibrated within required time frame.Spot checks by DRS0-30
4-55
6-1010
11-1515
16+2020
3. Exposure meters were calibrated in accordance with the SOW.Spot checks by DRS00
110
220
3+3030
4. Contamination meteres were calibrated in accordance with SOW.Spot checks by DRS0-30
4-55
6-1010
11-1515
16+2020
5. Documentation is complete and accurate in accordance with the SOW.Compare stickers to calibration sheets>0-4%0
>4-6%1
>6-10%5
>10%1010
Instances of non-compliance with the statement of work
D. Preparation and decontamination of therapy rooms:1. The contractor shall prepare the I-131 Therapy rooms for occupancy as needed, within the time frame outlined in the statement of workDRS will verify the room is prepared prior to occupancy and notify the contractor if modifications are required.00
110
2+2020
2. The contractor shall decontaminate, for free release all surfaces to less than 200 dpm/100cm2, as needed, within two or three days of receiving the swipe results unless instructed to do so within one day by the COR. The contractor shall decontaminate, for reset, all surfaces to less than 2000 dpm/100cm2, as needed, within one day of receiving the swipe results.The contractor shall provide a survey report with swipe and meter results attached to demonstrate compliance. DRS staff may spot check with swipes and meters.15
2+1010

E. Grounds for 100% reduction in bonus and 100% penalty: If the actions or lack of action by the contractor result in a violation of NRC regulations or conditions of NIH's NRC licenses, a 100% reduction in bonus and a 100% penalty of bonus will immediately be applied. The contractor will be responsible for paying any NRC related fines incurred due to their negligence.

330
Other actions resulting in Points Reduction for Bonus or Penalty
Causes NRC to issue a fine to NIH130
Causes NRC to issue a NOV to NIH111
Misuses Gvt. ID111
Causes NRC to issue a non-cited violation to NIH101
1
Creates a RAM security violation:76
Creates an Irradiator security violation:76
Creates a High Radiation Area controls violation:76
Causes patient care issues (Therapies)76
Causes enforcement actions due to erroneous reports76
Causes and/or improperly responds to contamination in unrestricted areas- Spreads contamination to unrestricted areas when avoidable:31
Jeopardizes* NIH JHACO accreditation31
KEY:
*Contractor's fault
**By floor
***If DRESS/DRS database is down, manual methods will be used as per directed by DRS.
Points deducted rangesModifier for Bonus/Penalty
0-91.1
10-151.09
16-201.08
21-251.07
26-301.06
31-501.05
51-751.025
76-1001
101-1100.975
111-1200.95
121-1300.925
130+0.9