PWS Attachment 3 RFP 75N98020R00014.docx

DOCX document 31 KB Posted

Attached to
Radiation Safety Services
Solicitation number
75N98020R00014
Issued by

View the file

Other files

File Type Posted
Amendment 0003 75N98020R00014.pdf PDF
Amendment 0002 75N98020R00014.pdf PDF
Solicitation Attachment 1 RFP 75N98020R00014 Updated 642020.xlsx XLSX spreadsheet
RFP 75N98020R00014 Final 52920.docx DOCX document
RFP 75N98020R00014 QA .docx DOCX document
Amendment 0001 75N98020R00014.pdf PDF
PWS Attachment 7 RFP 75N98020R00014.xls XLS spreadsheet
PWS Attachment 4 RFP 75N98020R00014.docx DOCX document
PWS Attachment 2 RFP 75N98020R00014.docx DOCX document
PWS Attachment 6 RFP 75N98020R00014.docx DOCX document
PWS Attachment 13 RFP 75N98020R00014.pdf PDF
Solicitation Attachment 2 RFP 75N98020R00014.docx DOCX document
PWS Attachment 8 RFP 75N98020R00014.pdf PDF
PWS Attachment 9 RFP 75N98020R00014.pdf PDF
PWS Attachment 1 RFP 75N98020R00014.docx DOCX document
PWS Attachment 5 RFP 75N98020R00014.xlsx XLSX spreadsheet
PWS Attachment 14 RFP 75N98020R00014.xls XLS spreadsheet
RFP 75N98020R00014 Final.docx DOCX document
Solicitation Attachment 3 75N98020R00014.docx DOCX document
PWS Attachment 11 RFP 75N98020R00014.docx DOCX document
PWS Attachment 10 RFP 75N98020R00014.pdf PDF
Solicitation Attachment 1 RFP 75N98020R00014.xlsx XLSX spreadsheet
Solicitation Attachment 4 RFP 75N98020R00014.docx DOCX document
PWS Attachment 12 RFP 75N98020R00014.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS ATTACHMENT 3 - DELIVERIES OF PERFORMANCE/DETAILED TECHNICAL REQUIREMENTS

ARTICLE 3.1. PERIOD OF PERFORMANCE

a. Period of performance under this contract shall be for a 12-month period commencing ______through ________ (To be specified prior to award) with four successive 12-month options to extend contract performance.

b. If the Government exercises its option(s), the period of performance will be increased as listed below:

Estimated
Period of PerformanceContract Amount
Option 1$
Option 2$
Option 3$
Option 4$

ARTICLE 3.2. DELIVERIES

Satisfactory performance of this contract shall be deemed to occur upon performance of the work described in the PWS of this contract and upon delivery and acceptance and acceptance by the Contracting Officer, or the duly authorized representative, of the services and reports specified in Section C. The reporting requirements are specified in Delivery Schedule and are described in SECTION C of this contract.

a. Deliveries required by the contractor shall be made F.O.B. Destination as set forth in FAR 52.247-35, F.O.B. DESTINATION, WITHIN CONSIGNEES PREMISES (APRIL 1984) to the address listed below:

TBD

National Institutes of Health/Main Campus BLDG 21, Room 231 Wilson Drive, MSC 6780 BETHESDA MD 20892 - 6780

b. Unless otherwise specified, deliveries shall be made to the Delivery Point specified above Mondays through Fridays (excluding Federal Holidays) between the hours of 8:30 a.m. and 5:30 p.m. EST only. Supplies or services scheduled for delivery on a Federal holiday shall be made the following day.

ARTICLE 3.3. REPORTS/DELIVERABLES REPORTING REQUIREMENTS

1.Within ten workdays after the end of each month, the Contractor shall submit to the NIH Project Officer neat, legible Summary Report documenting the services provided that month. These reports shall include the following:
a.A list of laboratories, storage areas, and corridors for which comprehensive, monthly, 10 CFR Weekly, corridor, alpha, naturally occurring alpha, and clearance survey reports were completed and accepted
b.A list of comprehensive, monthly, 10 CFR Weekly, corridor, alpha, naturally occurring alpha, and clearance survey reports which were deemed unacceptable
c.A list of comprehensive, monthly, 10 CFR Weekly, corridor, alpha, naturally occurring alpha, and clearance surveys that were missed
d.A list of security checks performed
e.A list of dates and time spent preparing or decontaminating the therapy rooms, differentiating between decontaminating for restricted versus unrestricted use
g.A list of survey meters calibrated, differentiating between those calibrated for contamination monitoring and those calibrated for measuring exposure rates
h.A list of active survey meters that were due for calibration, but not calibrated during the month
i.All supplies used during their month and their associated cost
p.Employee training
q.Personnel changes
r.Any other items requested by the COR

2. The Annual Report is submitted once a year by the 10th of January. The report is to include everything required in the Summary Report (outlined in Item 1 in this document), but is to by summed over the entire calendar year and is to also include any NRC corrective actions. A copy of the report is to be given to the COR, Chief RSOB and the NIH RSO

3. At the end of each calendar year, the Contractor shall review this statement of work and provide suggested updates to the COR for inclusion the next time the contract is modified.

REPORTS/DELIVERABLES (note that this list is meant to be a reference guide, if an item is omitted from this list, but requirements for reports or deliverables are in the Performance Work Statement (PWS), the contractor is held to the PWS)

Item
Time of Delivery
Reference
Comprehensive surveys
During month due based on list from DRS database
PWS Article.4 A#8
Monthly surveys
During calendar month
PWS Article.6 #8
10 CFR 35 Weekly surveys
During calendar week
PWS Article.7 #8
Corridor surveys
During calendar month
PWS Article.5 #8
Alpha surveys
During calendar month
PWS Article.9 #4
Naturally Occurring alpha surveys
During calendar month
PWS Article.10, #5
Clearance surveys
During calendar month
PWS Article.11
Security checks
During 30 day cycle based on 3 lists (daytime/evening/weekend) from DRS database
PWS Article.12 #10

Preparation and decontamination of therapy rooms (resets) Complete decontamination of therapy rooms 1 work day

At most 3 days; but, within 1 work day if directed by COR PWS Article 13

PWS Article.13

Calibration of instruments for contamination monitoring
Within 5 work days
PWS Article.14 #3
Calibration of instruments for exposure monitoring
Within 5 work days
PWS Article.14 #3
Summary Report
Within 10 workdays after the end of each month
Attachment 3, Section 3 Item 1
Provide contact information for Contractor staff during normal work hours
At time of contract award and updated as needed
PWS Article.3 #9
Data entry for master lab list, master meter list, and laboratory change forms
Within 1 work day
PWS Article.4 #11
Data entry of comprehensive surveys
Within 1 work day
PWS Article.4 #13
Data entry from corridor surveys, monthly surveys, weekly surveys, 10 CFR 35 weekly surveys, alpha surveys, naturally occurring alpha surveys, lab clearance surveys and security checks
Within 1 work day of reports being deemed acceptable
PWS Article.5 #13

PWS Article.6 #9 PWS Article.7 #13 PWS Article.8 #8 PWS Article.9 #6 PWS Article.10 #7 PWS Article.11 PWS Article.12 #12

Verbal notification of specified radiation safety violations
Immediately upon discovery
PWS Article.12 #9
Submittal of calibration reports
Within 1 work day of calibration
PWS Article.14 #15
Notify Area HP of the status of therapy room
As soon as swipes are submitted to DRS for expedited analysis
Attachment 2 B #1h
Submit Form 4 “Radiation Safety Procedures”
Within 1 work day of receiving therapy room swipe results from DRS
Attachment 2 #1k
Monitor items in therapy storage closet
Monthly
Attachment 2 #2o
E-mail Area HP concerning personal articles from patients that have decayed to background
Monthly
Attachment 2 #2o
Submit comprehensive and corridor surveys
By 4 p.m. of second work day following survey
PWS Article.4 #8

PWS Article.5 #8

Submit monthly, weekly, 10 CFR 35 weekly, alpha, and naturally occurring alpha surveys
By 4 p.m. of second work day following survey
PWS Article.6 #8

PWS Article.7 #8 PWS Article.8 #6 PWS Article.9 #4 PWS Article.10 #5

Submit “Lab Surveillance Program” forms for security checks
By 4 p.m. of first work day following the checks
PWS Article.12 #10
QA/QC Report
Within 10 workdays after the end of the month
PWS Article.16
Emergency security checks
Within specified time frame
PWS Article.12 #9 and #11