This is a Performance Work Statement (PWS) appendix containing a Building Automation System (BAS) equipment submission template in spreadsheet format. The document serves as a data collection instrument for the Hawaii Computer Room Air Handling Replacement project, specifically designed to catalog equipment changes, configurations, and BAS point designations for computer room 191 at a Defense Information Systems Agency (DISA) facility.
The spreadsheet template requires contractors to submit detailed information for each piece of equipment, including common name, design label, modification status (removed, modified, or new), CMMS designator, room location, manufacturer details, model and serial numbers, grid location on raised floors, capacity specifications with appropriate units, electrical feed information, and proposed UIDs and BAS point names. The template identifies two Computer Room Air Handling (CRAH) units—CRAH_1-A-06 and CRAH_1-A-07—both marked as modified replacements in room 191, with columns highlighted in green and blue to distinguish between information required for initial submission and information required prior to project commissioning. A separate "Reviewed and Approved" column requires project engineer concurrence (Y/N) on all submitted data.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UID Submission Form
| Project Contractor | BAS Contractor | TIM Contracter Input | BAS Contractor | Project Lead Input | ||||||||||||
| Common/Project Name | Design Label | Notes | Bus Change from UPS to Essential, C to D, A to B etc. | CMMS Designator from List | Room Designator | Manufacture | Model No | Serial No | Grid Designator | Capacity | Capacity Units | "FED FROM"/CKT # or "Parent ID" | Proposed Valve UID | Proposed UID (Excluding Valves) | Proposed BAS Point Name | UID/Point Name Reviewed and Approved? |
| Green Highlighted Columns Required for Intial Submission | Blue Highlighted Columns Required Prior to Project Commisioning | |||||||||||||||
| The name the equipment is commonly referred to on the project. | What the equipment is labeled as on the project drawings | Start with "REMOVED", "MODIFIED", or "NEW". | If moving equipment to a different distribution bus, designate here. | This is theCMMS Designator (abbreviation) from the CMMS Designator List TAB. | Interior: Room Number; Exterior: Name of Location (Ex: MechYard) | text 20 char | text 40 char; If no Model , use Configuration # or CO# | Grid Location on the raised floor based on the front-left corner of the equipment. If not on the raised floor, put "N/A". | Capacity of the asset (Number) | n/a, Gal, kW, kVA, A, BTU, Ton, GPM, CFM, RPM, PSI | Electrical only-the first upstream device feeding the equipment. | The UID proposed by the DISA BAS Contractor | The UID proposed by the DISA TIM Contractor | The Point Name proposed by the DISA BAS Contractor | Project Engineer Concurrence |
"Y/N"
| CRAH_1-A-06 | CRAH_1-A-06 | MODIFIED, replacement | N/A | CRAH_1-A-06 | 191 |
| CRAH_1-A-07 | CRAH_1-A-07 | MODIFIED, replacement | N/A | CRAH_1-A-07 | 191 |