QASP - HAW Rm 191 CRAH.pdf

PDF 253 KB Posted

Attached to
HAWAII COMPUTER ROOM AIR HANDLING REPLACEMENT Federal contract opportunity
Solicitation number
HC102826R0004
Issued by
Defense Information Systems Agency

About this file

This is a Quality Assurance Surveillance Plan (QASP) for the HAW Room 191 CRAH Replacement contract. The document outlines the Government's systematic approach to monitor and evaluate contractor performance throughout the period of performance, establishing that all tasks shall be evaluated using 100% inspection as the surveillance method due to the stringent performance requirements for IT rack cooling systems.

The contract encompasses five primary performance standards: Subtask 1 (Project Schedule and Phasing Plan), Tasks 2-3 (Replace Computer Room Air Handler Units in Computer Room 191 with required piping and electrical modifications), Task 4 (Aisle Containment installation), and Task 5 (Close-Out Documents with Operations and Maintenance Binder submittal). The Acceptable Quality Level (AQL) for all tasks is 100% compliance with requirements, as installed materials and systems must be complete, usable, operational, and Government-approved. Performance monitoring will be conducted by the Contracting Officer's Representative (COR) with oversight from the Program/Project Manager (PM) and Contracting Officer (KO). The COR will document performance using Performance Assessment Reports (PAR) for acceptable performance and Corrective Action Reports (CAR) for deficiencies, with measurements occurring upon task completion on a monthly or as-needed basis. Performance ratings follow CPARS standards: Exceptional, Very Good, Satisfactory, Marginal, and Unsatisfactory, with detailed criteria provided for each rating level. The document includes four appendices containing the Surveillance Matrix, PAR template, Customer Complaint Record form, and CAR template for systematic performance documentation and contractor accountability.

View the file

Other files for this federal contract opportunity

Other files attached to HAWAII COMPUTER ROOM AIR HANDLING REPLACEMENT, newest first.
File Type Posted
HC102826R0004 AMD 0003.pdf PDF
HC102826R00040002.pdf PDF
encl02c_pws-HAW Rm 191 CRAH Rev 1.pdf PDF
QA - HAW Rm 191 CRAH Replacement.pdf PDF
HC102826R00040001.pdf PDF
HC102826R0004 0001.pdf PDF
Pre-proposal SITE VISIT.pdf PDF
PWS Appendix A - Concept Plans.pdf PDF
Wage Determination.pdf PDF
PWS Appendix E - SEC Spreadsheet.xlsx XLSX spreadsheet
PWS Appendix D - CRAH Units.pdf PDF
Pre-proposal SITE VISIT.pdf PDF
PWS Appendix F - DISA NDA.docx DOCX document
HC102826R0004.pdf PDF
PWS Appendix C - Electrical Safety Program.pdf PDF
PWS Appendix B - DISA Labeling Std.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

1. Contract or Task Order Title: HAW Rm 191 CRAH Replacement

2. Purpose:

This QASP provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

• What will be monitored?

• How monitoring will take place.

• Who will conduct the monitoring?

• How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.

This QASP is a “living document” and the Government may review and revise it on a regular basis. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

3. Roles and Responsibilities:

The following personnel shall oversee and coordinate surveillance activities.

Program/Project Manager (PM) – The PM provides program oversight and supports the COR’s performance assessment activities.

Contracting Officer (KO) – The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine the final assessment of the contractor’s performance.

Contracting Officer’s Representative (COR) – The COR is responsible for providing continuous technical oversight of the contractor’s performance. The COR uses the QASP to conduct the oversight/surveillance process.

The COR shall keep a Quality Assurance file that accurately documents the contractor’s actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the KO. The COR is required to provide an annual performance assessment to the KO which will be used in documenting past performance. The QASP is the primary tool for documenting contractor performance. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government’s behalf.

Other Key Government Personnel- This may include performance monitors, inspectors, technical experts, workforce service division and center directorate level security personnel, requirements office, or others (i.e. users) who provide information that helps the COR monitor contractor performance.

4. Primary Method of Surveillance:

All tasks shall be evaluated with 100% inspection as the surveillance method.

100 Percent Inspection. This is usually only the most appropriate method for infrequent tasks or tasks with stringent performance requirements, e.g., where safety or health is a concern. With this method, performance is inspected/evaluated at each occurrence. One hundred percent inspection is too expensive to be used in most cases.

Surveillance Matrix

The Surveillance Matrix (Appendix 1) is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.

Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performance surveillance, using this QASP, to determine the quality of the contractor’s performance as it relates to the performance element standards. The AQL performance Standard Table should be used to form the foundation of the COR’s inspection checklist.

5. Performance Standards:

Performance Standard Acceptable Quality Level (AQL) Methods of Calculation

6.1.1 Subtask 1 - Project

Schedule (and Phasing Plan)

Project schedule meet the period of performance and PWS. Phasing Plan is coordinated with - and accepted by Site POCs.

100% Inspection and integration of customer input for proposed schedule.

Task 2, 3: Replace Computer Room Air Handler (CRAH) Units in Computer Room 191, including 0 any required piping and electrical modifications.

Installed materials meet technical requirements 100% of the time.

Deficient work is corrected in a timely manner prior to contract completion.

Minimum Acceptable:

100% compliance with requirements.

100% inspection of work. All installed materials and systems shall be complete, usable and operational, and approved by Government.

Task 4: Aisle Containment Installed materials meet technical requirements 100% of the time.

Deficient work is corrected in a timely manner prior to contract completion.

Minimum Acceptable:

100% compliance with requirements.

100% inspection of work. All installed materials and systems shall be complete, usable and operational, and approved by Government.

Task 5 – Close-Out Documents

O&M Binder submittal includes all required documentation

Minimum Acceptable:

Submittal requires only minor modifications. Required revisions are resolved in a satisfactory manner.

100% Inspection of submitted documents.

6. Documenting Performance:

Acceptable Performance.

The Government shall document positive performance. A Performance Assessment Report (PAR) template is attached (Appendix 2). Any report may become part of the supporting documentation for fixed price payments, award/incentive fee payments, Contractor Performance Assessment Reporting System (CPARS) entries, or other actions. Government acceptance of services permits the contractor to invoice for the service fee.

Unacceptable performance.

Unacceptable contractor performance can be identified by customer complaints (Appendix 3) or upon schedule surveillance evaluations. When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication and may be through the PAR template (Appendix 2). The COR shall document the discussion and place it in the COR file and provide a copy to the KO.

When the COR determines formal written communication is required, the COR shall prepare a Corrective Action Report (CAR). The CAR is forwarded to the KO for dissemination to the contractor. A CAR template is attached to this QASP (Appendix 4).

The contractor shall acknowledge receipt of the CAR in writing. The CAR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CAR will also state how long after receipt the contractor has to present this corrective action plan to the KO and COR. The Government may withhold payment for services until corrective action is taken. The Government shall review the contractor's corrective action plan to determine acceptability. Upon Government acceptance of the corrected services the contractor will be permitted to invoice for the service fee.

Any CAR may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, CPARS or other actions deemed necessary by the KO.

7. Mandatory or regulatory compliance items:

The contractor will provide initial proof of compliance with regulatory and compliance items contained in the contract. The Contracting Officer's Representative (COR) and the Contracting Officer (KO) will evaluate the initial submission and will conduct ad hoc reviews of the contractor's compliance throughout the remainder of the contract.

The contractor will monitor compliance as required by FAR 52.222-50, Combating Trafficking in Persons, and report any issues to the KO.

8. Acceptable Quality Level (AQL):

The AQL for this project is 100% due to the nature of the IT rack cooling requirements met by the new CRAH units and aisle containment components.

9. Evaluation Method:

There will be a 100% review of the submittals by Technical POC, as defined by PWS. Once the package has been approved of and all comments have been addressed, the contractor can proceed onto the installation phase.

At the close-out of the project a walkthrough will occur to verify that the installation was properly done and that there are no deficiencies. Any existing deficiencies shall be added to a punch list and will be addressed in a timely manner.

10. Performance Rating

In evaluating the quality of contractor’s performance, the following performance ratings may be used (same as CPAR ratings).

Rating Definition Note

Exceptional

Performance meets contractual requirements and exceeds many to the Government’s benefit.

The contractual performance of the element or sub-element being evaluated was accomplished

To justify an Exceptional rating, identify multiple significant events and state how they were of benefit to the Government. A singular benefit, however, could be of such with few minor problems for which corrective actions taken by the contractor were highly effective.

magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

Very Good

Performance meets contractual requirements and exceeds some to the Government’s benefit.

The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

To justify a Very Good rating, identify a significant event and state how it was a benefit to the Government. There should have been no significant weaknesses identified.

Satisfactory

Performance meets contractual requirements.

The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract/order. There should have been NO significant weaknesses identified. A fundamental principle of assigning ratings is that contractors will not be evaluated with a rating lower than Satisfactory solely for not performing beyond the requirements of the contract/order.

Marginal

Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

To justify Marginal performance, identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the Government. A

Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., management, quality, safety, or environmental deficiency report or letter).

Unsatisfactory

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

To justify an Unsatisfactory rating, identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the Government.

A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An

Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency reports, or letters).

Appendix 1 - Surveillance Matrix

Performance

Standards

Acceptable Quality Levels

Methods of Calculation Surveillance Results/Ratings

Performance is based on timely delivery of all tasks as specified in PWS Section 6.

High level of government satisfaction with the contractor’s work includes the successful delivery of all technical tasks on schedule as specified in PWS Section 6.

Target Criteria:

Equipment and installation work meets technical requirements 95% of the time, as specified in PWS Section 6.

Minimum Acceptable:

Deficient work is corrected in a timely manner.

Calculation:

The number of required equipment items, 100% of the total, are satisfactorily installed correctly and on schedule.

The Government technical personnel must inspect the completed work for correct equipment installation for the results to have at least a 100% completeness rate.

Measurement Interval – The Measurement Interval is at completion of each specified task in the PWS Section 6.

Measurement Period – The Measurement Period begins at contract award and ends at final acceptance of technical compliance of the contract.

Source of Measurement Data – Data will be collected from site inspection of the completed work for timely and correct equipment installation.

Method of Surveillance – Facility Manager on-site 100% inspection of the completed work.

Timing of Measurement Measurements are based on inspection of completed work when notified by the Contractor that task is complete.

Reporting Frequency: - Reporting to commence upon Contract award and continue throughout the Period of Performance on a monthly schedule or as needed when Contractor completes tasks.

Exceptional - All work completed without corrections. Delivered ahead of schedule.

Very Good - All work completed with minor corrections. Delivered on Schedule

Satisfactory - Work completed within PWS technical requirements.

Close monitoring by Govt required.

Formally identified deficiencies corrected within 1 week.

Delivered on Schedule.

Marginal - Project delivered in compliance but outside the POP.

Unsatisfactory- Contractor unable to fulfill PWS requirements

(A rollup of assessment of the Surveillance Inspection Results to develop an overall rating for this objective)

Appendix 2 – Performance Assessment Report

PERFORMANCE ASSESSMENT REPORT (PAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACT/TASK ORDER

NUMBER

2. CONTRACTOR 3. TYPE OF SERVICES

4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE

5. COR PHONE 6. SUSPENSE DATE

I. PERFORMANCE

7. DEFICIENCY (CHECK ALL BOXES THAT

APPLY)

NEW

REPEAT

NO DEFICIENCY NOTED

8. SERVICES SUMMARY or PWS PARAGRAPH ITEM

REVIEWED

9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY

BOX WAS CHECKED)

10. DETAILED PERFORMANCE ASSESSMENT

II. CONTRACTOR VALIDATION

11. CONTRACTOR REPRESENTATIVE CONCUR

NON-CONCUR

12. CORRECTIVE ACTION ESTIMATED COMPLETION

DATE

13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON

FOR NON-CONCURRENCE OF COR CITED DEFICIENCY

III. ACTION CORRECTED

14. CONCUR NON-CONCUR COR SIGNATURE AND DATE

15. COR REMARKS (REQUIRED)

6. CONTRACTOR REPRESENTATIVE REMARKS

Appendix 3 – Customer Complaint Record

CUSTOMER COMPLAINT RECORD

DATE/TIME OF COMPLAINT

SOURCE OF COMPLAINT

ORGANIZATION

BUILDING

NUMBER

INDIVIDUAL

PHONE NUMBER

NATURE OF COMPLAINT

CONTRACT REFERENCE

VALIDATION

DATE/TIME CONTRACTOR INFORMED OF COMPLAINT

ACTION TAKEN BY CONTRACTOR

RECEIVED/VALIDATED BY

Appendix 4 – Corrective Action Report

CORRECTIVE ACTION REPORT (CAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACTOR

2. CONTRACT NUMBER

3. TYPE OF SERVICES

4. FUNCTIONAL AREA

5. SUSPENSE DATE

6. CONTROL NUMBER

7. DEFICIENCY MAJOR MINOR

FINDING:

FINDING IMPACT:

Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.

8. QUALITY ASSURANCE PERSONNEL (COR)

TYPED NAME AND GRADE

SIGNATURE AND DATE

9. ISSUING AUTHORITY

TYPED NAME AND GRADE

SIGNATURE AND DATE

10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE

11. COR DETERMINATION

ACCEPTED REJECTED

12. CLOSE DATE

File details come from the government source that posted it. Updated .