Project_Forms.pdf
PDF 1 MB Posted
- Attached to
- Air Traffic Control Tower Rehabilitation
- Solicitation number
- 26-ITB-018
- Issued by
- Glades County, Brownsville CDP, Florida
About this file
This is a Project Forms document issued by Flagler County, Florida for use in construction contract administration and compliance. The document provides standardized forms and certificates required for contractual and administrative submissions throughout the project lifecycle. The forms include Application and Certificate for Payment (PF-2), submitted monthly by the prime contractor for progress payments; Continuation Sheets (PF-3) for itemized breakdowns of monthly progress; Agreement Amendments (PF-4) for contract revisions; Contractor's Affidavits for Payment of Debts and Claims (PF-5) and Release of Liens (PF-6) required at project close-out; Consent of Surety Company to Final Payment (PF-7); Partial Release of Lien (PF-8) submitted monthly beginning with the second progress payment; Conditional Final Release and Waiver of Lien (PF-9); Final Release of Lien (PF-10); Certificate of Substantial Completion (PF-11) prepared by the Engineer; and Certificate of Final Completion (PF-12) also prepared by the Engineer. All forms must be completed in ink or typewritten with all blank spaces filled in and submitted to the Office of the County Engineer at 1769 E. Moody Boulevard, Building 2, Bunnell, Florida 32110.
The document establishes payment procedures requiring retainage withholding percentages, documentation of work completion in accordance with contract documents, and verification that all subcontractors and material suppliers have received payment and issued releases of lien. The forms incorporate Florida Statutes requirements, including Florida Statutes Section 255.05(11) regarding surety company consent and Section 713.2 regarding lien releases. Additional compliance requirements are detailed in separate forms addressing stormwater pollution prevention plan inspections, maintenance of traffic inspection reviews, quality control certification of compliance with specifications and plans, and certification of disbursement of periodic payments to subcontractors. The document references the Standard General Conditions of the Contract for Construction and requires notarization of affidavits and certifications. All forms serve as extensions of contractual conditions and general specification requirements for Flagler County construction projects.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PF – 1 ( 1 of 1)
PROJECT FORMS
ARTICLE 1 - INSTRUCTIONS
1.1. The following forms and certificates are samples of those to be used by the Contractor for submissions for Contractual and administrative requirements.
1.2. Requirements and instructions on the forms constitute extensions of, or additions to, the Contractual conditions of the Contract and the general requirements of the specification.
1.3. Do not detach, or otherwise remove sample project forms from specifications.
1.4. Prepare all forms as required with all blank spaces filled in, in ink or typewritten.
1.5 Submit all Forms to the Office of the County Engineer
ARTICLE 2 - PROJECT FORM LISTING
Part 1: Standard Contract Administration Forms
Application and Certificate for Payment (PF – 2) (Prepared and submitted by prime contractor monthly for progress payment)
Continuation Sheet (PF – 3) (Prepared and submitted by prime contractor as itemized breakdown of monthly progress payment)
Agreement Amendment (PF – 4) (Prepared by Engineer for contract revision)
Contractor's Affidavit for Payment of Debts and Claims (PF – 5) (Prepared and submitted by prime contractor as part of project close-out documentation to be accompanied by separate release or waivers of lien from sub-contractors and material and equipment suppliers)
Contractor's Affidavit of Release of Liens (Final Release) (PF – 6) (Prepared and submitted by prime contractor as part of project close-out documentation)
Consent of Surety Company To Final Payment (PF – 7) (Prepared and submitted by prime contractor as part of project close-out documentation)
Partial Release of Lien (PF – 8) (Submitted monthly by prime contractor with each invoice beginning with the second progress payment application)
Conditional Final Release and Waiver of Lien (PF – 9) (Prepared and submitted by prime contractor as part of project close-out documentation)
Final Release of Lien (PF -10) (Prepared and submitted by prime contractor as part of project close-out documentation)
Certificate of Substantial Completion (PF – 11) (Prepared by Engineer)
Certificate of Final Completion (PF – 12) (Prepared by Engineer)
PAYMENT APPLICATION FORM
FLAGLER COUNTY APPLICATION FOR PAYMENT NO. ____________________
CONTRACTOR: _____________________________ ENGINEER: Flagler County Engineering Dept.
(Address:)
Bunnell, Florida 32110
ORIGINAL CONTRACT SUM $
NET REVISIONS $
CONTRACT SUM TO DATE $
TOTAL COMPLETE TO DATE $
Less: Retainage @ ____% $
EARNED LESS RETAINAGE $
PAYMENT FOR STORED MATERIALS $
TOTAL LESS RETAINAGE $
TOTAL REVISIONS LESS PREVIOUS PAYMENTS MADE $
NET REVISIONS: $______________________ AMOUNT DUE THIS APPLICATION $_______________________
CONTRACTOR:______________________________
BY:
SIGNED:
NOTARY PUBLIC:
DATE: ______________ MY COMMISSION EXPIRES: _______________
RECOMMENDED FOR ACCEPTANCE AND PAYMENT:
DATE: _______________ COUNTY ENGINEER:
CHANGE ORDER
No._____ Approval
DATE
Payment in the amount shown is due for work performed during the period of _________ thru ________, as detail on the attached Schedule of Payments. The present status of the Account for this Contract is :
Project Name & No.: __________________________________________________________________________________
The undersigned certifies that the Work covered by this Application for Payment has been completed in accordance with the Contract Documents and/or any Amendments thereto, that all amounts due Subcontractors and Suppliers for Work, for which previous Applications for Payment were issued and payment has been received from Flagler County, has been paid by him; that all Subcontractors and Suppliers have issued Releases of Lien and the current payment shown herein is now due.
1769 E. Moody Blvd. Bldg. 2
Subscribed & Sworn to before me this ____day of
PF - 2
ADDITION DEDUCTION
AMENDMENTS TO CONTRACT PAYMENT DUE THIS APPLICATION
APPLICATION FOR PAYMENT CONTINUATION FORM
FLAGLER COUNTY - CONTRACTOR'S APPLICATION FOR PAYMENT - SHEET ______ OF ______
PROJECT NAME: PROJ. NO.: SCHEDULE:
CONTRACTOR: COVERING PERIOD: THRU
APPLICATION No. DATE: BY: REVIEWED BY:
NO. PREVIOUS TOTAL THIS PERIOD TOTAL TO DATE PREVIOUS TOTAL THIS PERIOD TOTAL TO DATE
PF - 3
ITEM
DESCRIPTION
CONTRACT
QUANTITY UNIT UNIT
PRICE
QUANTITY INSTALLED & COMPLETE DOLLAR AMOUNT
PF-4
AMENDMENT TO AN AGREEMENT
BETWEEN FLAGLER COUNTY
AND
Contractor Name____________________________________________ Project Name_______________________________________________
County Project No. ________________________
Flagler County, Florida, a political subdivision (COUNTY) and (CONTRACTOR) hereby enter into this Amendment to the Agreement executed on .
WHEREAS, COUNTY AND CONTRACTOR have entered into an Agreement for on , .
WHEREAS, the PARTIES have entered into a Amendment on , for the purpose of:
1. The ending date for the AGREEMENT subsequent to this Amendment.
2. All Terms and Conditions of the original Contract and any subsequent amendments thereto shall remain unmodified and shall remain in full force and effect.
3. This Amendment must be accepted by the CONTRACTOR and Contract Surety and must be approved by the Flagler County Board of County Commissioners to become effective.
AMOUNT TIME
Original Contract Agreement........................ $ _____________
CHANGES BY PREVIOUS AMENDMENTS:
NO. DATE APPROVED
TOTAL CHANGES BY AMENDMENT NO. thru $
TOTAL CONTRACT prior to this Amendment (No. )........................$
TOTAL This Amendment..........................................................................$
NEW CONTRACT (All Amendments)...................................................... $
PF-4
ACCEPTANCE: (CONTRACTOR)
I (We) agree to perform the work required by this Amendment No.
________ for the amount and within the time allocated all in accordance with Contract Plans, Specifications and related Documents.
NAME:
WITNESS:
(Signature)
BY: DATE:
(Typed or Printed) (Signature)
WITNESS:
(Signature) (Typed/Printed Name & Title)
(Typed or Printed)
SURETY
I (We) have reviewed the foregoing Contract and Amendment and have adjusted the Contract Sureties to Conform with this Amendment.
SURETY:
BY: DATE:
(Typed/Printed Name & Title) (Agent-In-Fact Certification Attached)
RECOMMENDED: RECOMMENDED:
Flagler County Engineering Dept.
(Date) (Date)
(Typed/Printed Name & Title)
APPROVED AS TO FORM: APPROVED: FLAGLER COUNTY
Flagler County Legal Dept.
____________________________________ BY:
(Date) (Date)
PF - 5
CONTRACTOR’S OWNER
AFFIDAVIT OF ENGINEER
PAYMENT OF CONTRACTOR
DEBTS AND CLAIMS SURETY
OTHER
TO: (OWNER) : FLAGLER COUNTY PROJECT NO.: ______________________________
BOARD OF COUNTY COMMISSIONERS
CONTRACT FOR: _______________________________________________________________________________________________________________
CONTRACTOR (NAME, ADDRESS) CONTRACT DATE:_______________________________________
STATE OF: _________________________
COUNTY OF: _______________________
The undersigned, pursuant to the Standard Conditions of the Contract for Construction, hereby certifies that, except as listed below, he has paid in full or has otherwise satisfied all obligations for all materials and equipment furnished, for all work, labor, and services performed, and for all known indebtedness and claims against the Contractor for damages arising in any manner in connection with the performance of the Contract referenced above for which the Owner or his property might in any way be held responsible.
EXCEPTIONS: (If none, write “NONE”. If required by the Owner, the Contractor shall furnish bond satisfactory to the Owner for each exception).
SUPPORTING DOCUMENTS ATTACHED HERETO: CONTRACTOR:____________________________
1. Consent of Surety to Final Payment, Whenever Surety is involved
Consent of Surety is required. ADDRESS:_________________________________
Indicate attachments (YES___) (NO ____)
The following supporting documents should be attached hereto if required by the OWNER. BY: ______________________________________
1. Contractor’s Release or Waiver of Liens, conditional upon receipt of Final Payment. Subscribed and Sworn to before me this _____ Day of _________, 20__
2. Separate Release or Waivers of Leans from Sub-contractors and material and equipment suppliers to the extent required by the Owner, accomplished by a list thereof. NOTARY PUBLIC: ______________________
3. Contractor’s Affidavit of Release of Liens My Commission Expires:________________
PF - 6
CONTRACTOR’S OWNER
AFFIDAVIT OF ENGINEER
RELEASE OF LIENS CONTRACTOR
OTHER
TO: (OWNER) FLAGLER COUNTY PROJECT NO.: ______________________________
CONTRACT FOR: ________________________________________________________________________________________________
CONTRACTOR (NAME, ADDRESS) CONTRACT DATE:_______________________________________
The undersigned, pursuant to the Standard General Conditions of the Contract for Construction, hereby certifies that all Contractors, all Sub-contractors, all suppliers of material and equipment and all performers of work, labor or services who have or may have liens against any property of the Owner arising in any manner out of the performance of the Contact referenced above have been paid in full.
EXCEPTION: (If none, write “NONE”. If required by the Owner, the Contractor shall furnish bond satisfactory to the Owner for each exception).
SUPPORTING DOCUMENTS ATTACHED HERETO: CONTRACTOR: ___________________________
1. Contractor’s Release or Waiver of Liens, conditional upon receipt ADDRESS:_________________________________ of Final Payment. _________________________________
2. Separate Release or Waivers of Liens from Sub-contractors and equipment suppliers, to the extent required by the Owner, accompanied by a list thereof. BY: _______________________________________
Subscribed and Sworn to before me this ______Day of _____________, 20___
NOTARY PUBLIC:______________________________
My Commission Expires:___________________________
PF - 7
CONSENT OF OWNER
SURETY COMPANY ENGINEER
TO FINAL PAYMENT CONTRACTOR
OTHER
TO: (OWNER) PROJECT NO.: _____________________________________
FLAGLER COUNTY
CONTRACT FOR: __________________________________________________________________________________________
CONTRACTOR: (NAME, ADDRESS)
CONTRACT DATE:_______________________________________
Pursuant to § 255.05(11), Florida Statutes, and in accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the (Insert Name and Address of Surety Company)
SURETY COMPANY:
on Bond of (Insert Name and Address of Contractor)
CONTRACTOR:
hereby approves of the Final Payment to the Contractor, and agrees that Final Payment to the Contractor shall not relieve the Surety Company of any of its obligations to (Insert Name and Address of Owner).
OWNER:
Flagler County Board of County Commissioners, with an address of 1769 E. Moody Boulevard, Building 2, Bunnell, Florida 32110 as set for in the said Surety Company’s Bond.
IN WITNESS WHEREOF, the Surety Company has hereunto set its hand the _______Day of _______________________, _______.
SURETY COMPANY
ATTEST: ________________________________________________
(SEAL) SIGNATURE OF AUTHORIZED REPRESENTATIVE
TITLE
PF – 8
WAIVER AND RELEASE OF LIEN
UPON PROGRESS PAYMENT
“PARTIAL RELEASE OF LIEN”
The undersigned Lienor, in consideration of $____________________________________, ____________________________________hereby waives and releases its lien and right to
(COMPANY/CONTRACTOR)
claim a lien for labor, services, or materials furnished through ____________ to _____________
(DATE) (DATE)
to the Flagler County Board of County Commissioners on the job of
PROJECT NO. ________________________________
PROJECT NAME: ___________________________________________________________
to the following described property: _______________________________________________
(DESCRIPTION OF PROPERTY)
This waiver and release does not cover any retention or labor, services, or materials furnished after the date specified.
This Partial Release is furnished in accordance with 713.2(3), Florida Statutes.
DATED on _______________________, 20 ____
By:___________________________________ (Signature of Lienor)
(Printed Name & Title)
Lienor’s Name and Address: __________________________________________________
STATE OF FLORIDA
COUNTY OF ____________
Sworn to (or affirmed) and subscribed before me this ________ day of _____________, 20___ by ____________________________________.
SIGNATURE OF NOTARY PUBLIC
Print, Type or Stamp Commissioned Name
Personally Known ______________ OR Produced Identification _____________
Type of Identification Produced ___________________________________
PF – 9
CONDITIONAL FINAL RELEASE AND WAIVER OF LIEN
The undersigned Lienor, in consideration of $____________________________________, ____________________________________hereby waives and releases its lien and right to
(COMPANY/CONTRACTOR)
claim a lien for labor, services, or materials furnished through ____________ to _____________
(DATE) (DATE)
to the Flagler County Board of County Commissioners on the job of
PROJECT NO. _____________________________
PROJECT NAME: ___________________________________________________________
to the following described property: _______________________________________________
(Description of Property)
This undersigned certifies that all labor, services, and/or materials described herein have been provided to the execution and delivery of this document.
The Conditional Final Release and Lien Waiver is conditioned upon the undersigned receiving $____________________ for the work described in this Release and Waiver.
The Conditional Final Release is furnished in accordance with 713.20, Florida Statutes.
DATED on ________, _______________, 20 ____
By:____________________________________________
(Printed Name & Title) Lienor’s Name and Address: ______________________________________________________
STATE OF FLORIDA
COUNTY OF ____________
Print, Type or Stamp Commissioned Name
Personally Known ______________ OR Produced Identification ___________________
PF – 10
WAIVER AND RELEASE OF LIEN
UPON FINAL PAYMENT
The undersigned lienor, in consideration of the final payment in the amount of $________________________, hereby waives and releases its lien and right to claim a lien for labor, services, or materials furnished to the Flagler County Board of County Commissioners on the job of
PROJECT NO.:_____________________
PROJECT NAME: ____________________________________________________________
to the following described property: _______________________________________________
(Description of Property)
This Final Release is furnished in accordance with 713.2(5), Florida Statutes.
DATED on ________, _______________, 20 ____
By:___________________________________
(Printed Name & Title)
Lienor’s Name and Address: _____________________________________________
STATE OF FLORIDA
COUNTY OF ____________
Print, Type or Stamp Commissioned Name
Personally Known ______________ OR Produced Identification ______________
PF – 11 (1 of 2)
CERTIFICATE OF SUBSTANTIAL COMPLETION
PROJECT: ___________________________________________________________________
CONTRACT DATE:______________________________________
COUNTY PROJECT NO.: ________________________
This Certificate of Substantial Completion applies to:
_____ All work under Contract _____ Portion of work described as follows:
The Work to which this Certificate applies has been inspected by authorized representatives identified below and that Work is hereby declared to be substantially complete in accordance with the Contract Documents on:______________________
(DATE)
A tentative list of items to be completed or corrected is attached hereto. This list may not be all-inclusive, and the failure to include an item in it does not alter the responsibility of Contractor to complete all the Work in accordance with the Contract Documents. The items in the tentative list shall be completed or corrected by the Contractor.
SIGNED:
CONTRACTOR: ____________________________________________________________
By: __________________________________________ Date:______________________________________
FLAGLER COUNTY CONSTRUCTION ENGINEERING & INSPECTION (CEI)
(CEI FIRM)_________________________________________________________________
FLAGLER COUNTY PROJECT MANAGER
OTHER____________________________________________________________________
PF – 11 (2 of 2)
TENTATIVE LIST OF ITEMS TO BE COMPLETED OR CORRECTED
(PUNCH LIST)
PROJECT: ________________________________________ DATE:___________________
COUNTY PROJECT NO.: ___________________________________
CONTRACTOR: ______________________________________________________
This list may not be all-inclusive, and the failure to include an item does not alter the responsibility of the Contractor to complete all the Work in accordance with the Contract Documents.
ITEM NO. DESCRIPTION
PF - 12
CERTIFICATE OF FINAL COMPLETION
PROJECT: _______________________________________________________________
CONTRACT DATE:_____________
COUNTY PROJECT NO.: ____________________________
This Certificate of Final Completion applies to:
_____ All work under Contract _____ Portion of work described as follows:
The Work to which this Certificate applies has been inspected by authorized representatives identified below and that Work is hereby declared to be complete in accordance with the Contract Documents on:________________________________
(DATE)
The tentative list (punch list) of items to be completed or corrected provided with the Certificate of Substantial Completion has been addressed. Failure to have included an item in the does not alter the responsibility of Contractor to complete all the Work in accordance with the Contract Documents.
The date of Final Completion is the date upon which all guarantees and warranties begin.
FINAL COMPLETION DATE:________________________________________
SIGNED:
CONTRACTOR: ____________________________________________________________
FLAGLER COUNTY CONSTRUCTION ENGINEERING & INSPECTION
REPRESENTATIVE: _______________________________________________
FLAGLER COUNTY PROJECT MANAGER
List the subcontractors which have not been paid the proportionate share of payments received by the contractor and the date listed as exception.
To be signed by an officer or director of the Contractor with the authority to bind the Contractor and notarized.
To avoid delay in payment, certification must be submitted to the Project Engineer no later than the Friday before the monthly estimate cutoff date (generally the 3rd Sunday of the month).
County of Sworn to and subscribed before me this
DATE
CONTRACT NO.FIN PROJ. I.D.
, prime contractor for the above referenced contract, hereby certifies that all subcontractors, except for those noted below, having interest in this contract have received their pro rata share of all previous periodic payments made to date by the Department for all work, materials and equipment furnished under the contract. The term "subcontractor", as used herein, shall also include persons or firms furnishing materials, services or equipment incorporated into the work or stockpiled in the vicinity of the project for which partial payment has been made by the Department and work done under equipment-rental agreements.
EXCEPTION:
The following subcontractors have not been paid and a copy of the notification sent to each, explaining the good cause why payment has not been made, is attached to this form:
Subcontractor name
Street Address
City State Zip
Subcontractor name
Street Address
City State Zip
By
Title
State of Florida day of , , by (Print name of person signing Certification)
Notary Public
Personally Known OR Produced Identification Type of Identification Produced
Instructions:
Attach copy of the notification good cause sent to each applicable subcontractor.
2.
3. A separate certification is required for each contract.
4.
5.
TO RELEASE MONTHLY PAYMENT FOR
Commission Expires
1.
Contractor
A false statement or omission made in connection with this certification is sufficient cause for suspension, revocation, or denial of qualification to bid, and a determination of non-responsibility, and may subject the person and/or entity making the false statement to any and all civil and criminal penalties available pursuant to applicable Federal and State Law.
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
CONSTRUCTION
700-010-38
1/17CERTIFICATION
DISBURSEMENT OF PREVIOUS PERIODIC PAYMENT TO SUBCONTRACTORS
(As required by Florida Transportation Code, Section 337.11, Subsection (11), F.S.)
, not required when digital
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
CONSTRUCTION COMPLIANCE WITH
SPECIFICATIONS AND PLANS
700-020-02
CONSTRUCTION
12/16
FIN PROJECT I.D.(s) DATE:
CONTRACT NO:
Monthly:
Final:
, Prime Contractor for the above referenced contract, hereby verifies based on personal knowledge or reasonable investigation and good faith belief, all Quality Control functions and Quality Control sampling and testing results are in substantial compliance with the contract specification requirements and the approved Quality Control Plan for this project. This includes the input of test results into the Department’s MAC database within 24 hours of results being received. This represents work done between and . Exceptions to these requirements are listed below.
1.) Item No.:
Exception:
2.) Item No.:
Exception:
3.) Item No.:
Exception:
4.) Item No.:
Exception:
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
CONSTRUCTION COMPLIANCE WITH
SPECIFICATIONS AND PLANS
700-020-02
CONSTRUCTION
12/16
5.) Item No.:
Exception:
6.) Item No.:
Exception:
A false statement or omission made in connection with this certification is sufficient cause for suspension, revocation, or denial of qualification to bid, and a determination of non-responsibility, and may subject the person and/or entity making the false statement to any and all civil and criminal penalties available pursuant to applicable Federal and State Law.
State of Florida County of
Sworn to and subscribed before me this day of , , by (Print name of person signing Certification)
Notary Public (Not Required when Digital)
Commission Expires
Personally Known or Produced Identification
Type of Identification Produced
Quality Control Manager
State of Florida County of
Sworn to and subscribed before me this day of , , by (Print name of person signing Certification)
Notary Public (Not Required when Digital)
Commission Expires
Personally Known or Produced Identification
Type of Identification Produced
Contractor
Signed By
Title
Company
Signed By dleap Text Box
Instructions for Construction Compliance with Specifications and Plans (Form # 700-020-02)
Financial Project Number(s): List all financial project numbers on the contract.
Date: Show the date the certification is completed.
Contract No.: Show the contract number the certification represents.
Monthly/Final: Indicate which type of estimate this certification represents, monthly or final.
Prime Contractor: In this field, show the Prime Contractor’s full company name.
Date Began: Show the beginning date the certification represents. For a monthly or progress estimate, show the beginning date for the estimate period. For a final certification, show the date the contract work began.
Date Ended: Show the ending date for the estimate period. For final certification, show the final acceptance date.
Item No.: Show the pay item number the exception is associated with.
Exceptions:
For the monthly certification, list the following:
1. QC samples that did not compare with VT samples and had VT results upheld by RT samples.
2. Any samples that had Engineering Analysis Report or Delineation Test(s) performed.
3. Any failed QC samples.
4. Any QC samples that do not have results entered into MAC.
5. Any QC samples that were performed by unqualified technicians or laboratories.
6. Any materials placed without an approved QC Plan or when the QC Plan is suspended.
7. Any materials provided from an unapproved producer or supplier.
8. Results of any failing Chloride content limits as defined in Specification 346-4.2.
The following would not be listed as an exception on the subject form:
1. QC samples that have been tested but not verified.
2. QC samples that have been tested and had verification test results that did not compare.
For the final certification, all exceptions to QC sampling and testing must be shown on the certification.
Notary Information: The Notary of the Public completes this section. This certification must be notarized.
Quality Control Manager: Name of the Quality Control Manager that will sign the certification.
Company: Enter the name of the company the Quality Control Manager is employed by.
Contractor: Name of an officer or director of the Contractor with an authority to bind the Contractor.
Signed By: To be signed by the person's name under the "Contractor" section.
Title: Enter the title of the person signing the certification.
It is not the Department’s intent for Contractors to list as exceptions samples and results for which they are not responsible, such as verification and independent verification samples and test results. Additionally, the Department will accept exports of the Sample Search Results in MAC, as an attachment, to assist in documenting the status of samples.
Signed By: To be signed by the "Quality Control Manager".
S T
A T
E O
F F
L O
R
ID
A D
E P
A R
T M
E N
T O
F T
R A
N S
P O
R T
A T
IO
N
M A
IN
T
E N
A N
C E
O F
T R
A F
F
IC
M
O T
IN
S P
E C
T
IO
N R
E V
IE
W
R E
P O
R
-0
-3
C O
N S
T R
U C
T
/1
E v a lu a ti o n
I n it ia l o m p re h e n s iv e W e e k ly
R e p o rt
R e p o rt
N o
B
C o n tr a c t N o
C
F in
N o
D
F e d e ra l A id P ro je c t N o
E
P ri m e C o n tr a c to r:
F
D a te o f
R e v ie w
G
C u rr e n t P ro je c t
P h a s e e tc
H
P ro je c t L o c a ti o n
I) A re a s t o b e R e v ie w e d
A R
E A
N O
T R
A F
F
IC
C O
N T
R O
L P
L
Y
*N
/A
D
E M
A R
K
T
C P
/A L
T E
R N
A T
E T
C P
M O
D
IF
IC
A
T
IO
N S
H A
V E
B E
E N
A P
P R
O V
E D
B
S
IG
N
IN
G A
N D
P A
V E
M E
N T
M A
R K
IN
G
S I
N S
T A
L L
E D
A C
C O
R D
IN
G
T O
A P
P R
O V
E D
T C
P
C
S
ID
E S
T R
E E
T S
P R
O P
E R
L Y
S
IG
N E
D
D
A L
L D
E V
IC
E
S U
S E
D F
O R
S P
E E
D L
IM
IT
R E
D U
C T
IO
N
S W
E R
E I
N S
T A
L L
E D
I N
A C
C O
R D
A N
C E
W
IT
H A
P P
R O
V E
D T
C P
E
N E
E D
E D
T U
R N
L A
N E
S I N
P L
A C
E
A R
E A
N O
G E
N E
R
L
M
A R
S
IG
N
S C
O R
R E
C T
H E
IG
H
T
O F
F S
E T
B
S
ID
E W
A L
K C
L O
S E
D /S
C H
O O
L M
A R
K
IN
G /C
R O
S S
W A
L K
S
IG
N S
P L
A C
E D
P R
O P
E R
L Y
C
D R
IV
E
W A
Y S
B
U S
IN
E
S S
E N
T R
A N
C E
S
M E
D
IA
N A
C C
E S
S A
R E
I N
S T
A L
L E
D I
N A
C C
O R
D A
N C
E W
IT
H
A P
P R
O V
E D
T C
P
D
S
IG
N A
L T
IM
IN
G /P
H A
S
IN
G A
R E
I N
A C
C O
R D
A N
C E
W
IT
H A
P P
R O
V E
D T
C P
E
S U
F F
IC
IE
N T
A D
V A
N C
E D
W A
R N
IN
G
S
IG
N S
I N
P L
A C
E
F
E X
IS
T
IN
G
S
IG
N S
N O
T I
N U
S E
W E
R E
R E
M O
V E
D O
R C
O V
E R
E D
G
S U
F F
IC
IE
N T
D E
V
IC
E S
T O
G U
ID
E
T R
A F
F
IC
T H
R O
U G
H T
H E
W O
R K
A R
E A
H
R O
A D
W A
Y S
U R
F A
C E
M A
IN
T
A
IN
E D
S A
T
IS
F A
C T
O R
IL
Y
I.
M
E S
S A
G E
B O
A R
D S
C O
N V
E Y
C O
N C
IS
E
M E
S S
A G
E T
O M
O T
O R
IS
T
S
J
P R
O J E
C T
I N
F O
R M
A T
IO
N
S
IG
N S
I N
S T
A L
L E
D C
O R
R E
C T
L Y
K
A P
L N
U M
B E
R S
P R
O P
E R
L Y
M A
R K
E D
O N
D E
V
IC
E S
L
M A
S S
Y S
T E
M P
R O
P E
R L Y
I N
S T
A L
L E
D A
N D
F U
N C
T
IO
N
IN
G
IF
A
P P
L
IC
A B
L E
A R
E A
N O
N
IG
H T
W O
M A
R
L
IG
H T
IN
G
P L
A N
A P
P R
O V
E D
B
P O
R T
A B
L E
C H
A N
G E
A B
L E
M E
S S
A G
E S
IG
N
W A
R N
IN
G
L
IG
H T
E D
W O
R K
Z O
N E
A H
E A
D
C
V E
H
IC
L E
S /E
Q U
IP
M
E N
T H
A V
E F
L A
S H
IN
G
L
IG
H T
S A
N D
/O R
R E
F L
E C
T
IV
E S
H E
E T
IN
G
D
P
IL
O T
V E
H
IC
L E
W
IT
H F
L A
S H
IN
G
L
IG
H T
S A
N D
M E
S S
A G
E B
O A
R D
E
L
IG
H T
IN
G
A
IM
E D
N O
T T
O I
M P
E D
E T
R A
F F
IC
A R
E A
N O
C L
E A
R Z
O N
E /H
A Z
A R
M A
R
N O
E Q
U
IP
M E
N T
/M A
T E
R
IA
L S
/H A
Z A
R D
S S
T O
R E
D I
N C
L E
A R
Z O
N E
B
D R
O P
-O F
F S
A N
D A
B O
V E
G R
O U
N D
H A
Z A
R D
S A
R E
P R
O T
E C
T E
D I
N A
C C
O R
D A
N C
E W
IT
H
A P
P R
O V
E D
T C
P A
N D
D E
S
IG
N S
T A
N D
A R
D S
A R
E A
N O
T E
M P
O R
A R
Y P
A V
E M
E N
T M
A R
K
IN
G
M A
R
C O
R R
E C
T A
P P
L
IC
A T
IO
N
S A
N D
W
ID
T H
B
R E
F L
E C
T
IV
IT
Y
C O
N D
IT
IO
N S
A T
IS
F
A C
T O
R Y
T
A P
E /P
A
IN
T /M
E S
S A
G E
S
C
C O
N F
L
IC
T
IN
G M
A R
K
IN
G S
A N
D P
A V
E M
E N
T D
E B
R
IS
P R
O P
E R
L Y
R E
M O
V
A
T E
O F
F L
O R
ID
A
D E
P A
R T
M E
N T
O F
T R
A N
S P
O R
T A
T
IN
T
E N
A N
C E
O F
T R
A F
F
IC
M
O T
IN
S P
E C
T
IO
N R
E V
IE
W
R E
P O
-0
N S
T R
U C
T
E
A N
O
T E
M P
O R
A R
Y B
A R
R
IE
R W
A
M A
R
B A
R R
IE
R
C O
N N
E C
T E
D A
N D
A N
C H
O R
E D
I N
A C
C O
R D
A N
C E
W
IT
H A
P P
R O
P R
IA
T
E D
E S
IG
A
N D
A
B
T R
A N
S
IT
IO
N a n d O
V E
R L A
P S
I N
S T
A L
L E
D P
E R
D E
S
IG
N S
T A
N D
A R
C
R A
S H
C U
S H
IO
N
S I
N S
T A
L L
E D
C O
R R
E C
T L
Y A
N D
P R
O P
E R
L Y
M A
IN
T
A
IN
P
R O
P E
R O
F F
S E
T A
N D
D E
F L
E C
T
IO
N S
P A
C E
M A
IN
T
A
IN
E A
N O
F L
A G
G E
M
A R
L
IS
T
O F
T R
A
IN
E D
F L
A G
G E
R S
S U
B M
IT
T
E D
T O
P R
O J E
C T
A D
M
IN
IS
T
R A
T O
R B
E F
O
N S
T R
U C
T
IO
N B
E G
IN
F L
A G
G E
R A
H E
A D
S
IG
N I N
S T
A L
L E
D P
R O
P E
R
F
L A
G G
E R
W E
A R
IN
G
A P
P R
O V
E D
S A
F E
T Y
V E
S T
/U S
IN
G
P R
O P
E R
S T
O P
/S L
O W
P A
D D
F
L A
G G
E R
S T
A T
IO
N
H A
S P
R O
P E
R L
IG
H
T
IN
G F
O R
N
IG
H T
W O
E A
N O
L A
N E
C L
O S
U R
M
A R
P
R O
P E
R T
R A
N S
IT
IO
N
S
IG
H T
D
IS
T A
N C
E a n d
B U
F F
E R
S P
A
P R
O P
E R
D E
V
IC
E S
P A
C
IN
G A
N D
V
IS
IB
IL
IT
P
A V
E M
E N
T M
A R
K
IN
G S
P L
A C
E D
C O
R R
E C
T
P
R O
P E
R M
E R
G
E A
N O
D E
T O
U
M A
R
D E
T O
U R
S I
N S
T A
L L
E D
I N
A C
C O
R D
A N
C E
W
IT
H A
P P
R O
V E
D T
C P
W
IT
H P
R O
P E
R S
IG
N
D
P A
V E
M E
N T
M A
R K
IN
S P
E C
IA
L
D E
T O
U R
S
I.
E
L
A N
E S
H
IF
T S o r
D
IV
E R
S
IO
N S
A
R E
P R
O P
E R
L Y
I N
S T
A L
L
E A
N O
P E
D E
S T
R
IA
N /B
IC
Y
C L
IS
T
A C
C O
M M
O D
A T
IO
M A
R
P E
D E
S T
R
IA
N D
E T
O U
R S a n d D
IV
E
R S
IO
N
S I N
S T
A L
L E
D P
E R
T
P
T E
M P
O R
A R
Y W
A L
K W
A Y
S H
A V
E P
R O
P E
R S
IG
N
IN
G
A N
D A
D A
C O
M P
L
IA
P
E D
E S
T R
IA
N
L C
D s P
R O
P E
R L Y
I N
S T
A L
L
E
X
IS
T
IN
G
N E
W a n d
T E
M P
O R
A R
Y C
U R
B R
A M
P S
H A
V E
D E
T E
C T
A B
L E
W A
R N
IN
E A
N O
B U
S
IN
E S
S A
C C
O M
M O
D A
T
IO
M
A R
V
E H
IC
L
E A
N D
P E
D E
S T
R
IA
N E
N T
R A
N C
E S
M A
IN
T
A
IN
E D
W
IT
H P
R O
P E
R D
E V
IC
E
S
S
IG
N
D V
IS
IB
IL
E A
N O
T R
A F
F
IC
C O
N T
R O
L D
E V
IC
V
IS
IB
V
IC
E
A
C
O P
E R
T
M
IX
W
R
K
R E
F
L
M
A R
K S
/D A
R
R E
C T
N
U
R R
IC
A
D
IX
E D
C H
A N
N E
L
IZ
IN
G
D E
V
IC
IG
’s
R O
W B
O A
D A
R S
P E
E D
D
IS
P L
A Y
U
O P
/S L
O W
P A
D D
D E
S T
R
IA
N L
C s e n io r
P ro je c t E n g in e e r/
P ro je c t A d m in is tr a to r ig n a tu re
/1
A
T E
O F
F L
O R
ID
A
D E
P A
R T
M E
N T
O F
T R
A N
S P
O R
T A
T
IN
T
E N
A N
C E
O F
T R
A F
F
IC
M
O T
IN
S P
E C
T
IO
N R
E V
IE
W
R E
P O
-0
N S
T R
U C
T
4 /
R
M I N
S T
R U
C T
IO
N
S
T h e S e n io r
P ro je c t E n g in e e r/
P ro je c t A d m in is tr a to r w ill c o m p le te t h e
M O
T I n s p e c ti o n R e v ie w R e p o rt t h a t w ill c o v e r w e e k ly d a y ti m e a n d n ig h t ti m e i n s p e c ti o n s f o r p ro je c ts
N o ti fy t h e W
T S t o c o rr e c t a ll s a fe ty d e fi c ie n c ie s i m m e d ia te ly
T h e W
T S s h a ll n o t a llo w m in o r d e fi c ie n c ie s t h a t a re n o t s a fe ty h a z a rd s t o r e m a in u n c o rr e c te d f o r m o re t h a n h o u rs
A
T h e S e n io r P ro je c t
E n g in e e r/
P ro je c t A d m in is tr a to r s h a ll u s e c o n s e c u ti v e n u m b e rs f o r e a c h r e p o rt c o m p le te d f o r e a c h p ro je c t.
C o n tr a c t N u m b r.
F in a n c ia l P ro je c t Id e n ti fi c a ti o n
N u m b
F e d e ra l A id P ro je c t N u m b
P ri m e C o n tr a c to r’ s N a m e
F
D a te o f re v ie w
G
M O
T w o rk p h a s e a t ti m e o f re v ie w
H
P ro je c t L o c a ti o n
S ta te R o a d N u m b e r, C o u n ty
R o a d N u m b e r, e tc
I) h e c o n d it io n s a re a s
-1 th a t m u s t b e r e v ie w e d i n t h e f ie ld w it h t h e b o x e s c h e c k e d s h o w in g t h e c o m p lia n t/ n o n -c o m p lia n t a re a s i n t h e W o rk
Z o n e E n te r th d a te w h e n t h e d e fi c ie n c ie s w e re c o rr e c te d
D
U s e t h e r e m a rk s c o lu m n t o s u m m a ri z e t h e d e fi c ie n c y
J
P ri n te d n a m e a n d s ig n a tu re o f S e n io r P ro je c t E n g in e e r/
P ro je c t
A d m in is tr a to
Stormwater Pollution Prevention Plan Inspection Report Form Inspections must occur at least once a week and within 24 hours of the end of a storm event that is 0.50 inches or greater.
Project Name:___________________________________________________________ FDEP NPDES Stormwater Identification Number: FLR10______
Location Rain data
Type of control (see below)
Date installed / modified
Current Condition (see below)
Corrective Action / Other Remarks
Condition Code:
G = Good M = Marginal, needs maintenance or replacement soon P = Poor, needs immediate maintenance or replacement C = Needs to be cleaned O = Other
Control Type Codes
1. Silt Fence 10. Storm drain inlet protection 19. Reinforced soil retaining system 28. Tree protection
2. Earth dikes 11. Vegetative buffer strip 20. Gabion 29. Detention pond
3. Structural diversion 12. Vegetative preservation area 21. Sediment Basin 30. Retention pond
4. Swale 13. Retention Pond 22. Temporary seed / sod 31. Waste disposal / housekeeping
5. Sediment Trap 14. Construction entrance stabilization 23. Permanent seed / sod 32. Dam
6. Check dam 15. Perimeter ditch 24. Mulch 33. Sand Bag
7. Subsurface drain 16. Curb and gutter 25. Hay Bales 34. Other
8. Pipe slope drain 17. Paved road surface 26. Geotextile
9. Level spreaders 18. Rock outlet protection 27. Rip-rap Inspector Information:
Name Qualification Date The above signature also shall certify that this facility is in compliance with the Stormwater Pollution Prevention Plan and the State of Florida Generic Permit for Stormwater Discharge from Large and Small Construction Activities if there are not any incidents of non-compliance identified above.
"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."
Name (Responsible Authority) Date
| PF-1_Project_Forms |
| PF-2_Application_Pay_Form |
| Sheet1 |
| PF-3_Application_For_Payment_Continuation_Form |
| Sheet1 |
| PF-4_Amendment_Form |
| PF-5_Contractor_AFF_Payment_Debts_and_Claims |
| CONTRACTOR’S OWNER |
| TO: (OWNER) : FLAGLER COUNTY PROJECT NO.: ______________________________ |
| PF-6_Contractor_AFF_Release_of_Liens |
| CONTRACTOR’S OWNER |
| AFFIDAVIT OF ENGINEER |
| TO: (OWNER) FLAGLER COUNTY PROJECT NO.: ______________________________ |
| PF-7_Consent_Surety_Final_Payment |
| CONSENT OF OWNER |
| SURETY COMPANY ENGINEER |
| TO: (OWNER) PROJECT NO.: _____________________________________ |
| PF-8_Partial_Release_Form |
| Lienor’s Name and Address: __________________________________________________ |
| STATE OF FLORIDA |
| Print, Type or Stamp Commissioned Name |
| PF-9_Conditional_Final_Release_Waiver_Form |
| Lienor’s Name and Address: ______________________________________________________ |
| ______________________________________________________ |
| ______________________________________________________ |
| STATE OF FLORIDA |
| Print, Type or Stamp Commissioned Name |
| PF-10_Final_Release_Form |
| Lienor’s Name and Address: _____________________________________________ |
| STATE OF FLORIDA |
| Print, Type or Stamp Commissioned Name |
| PF-11_Substantial_Completion_Certificate |
| PF-12_Final_Completion_Certificate |
| FINANCIAL_PROJECT_ID 1: |
| FINANCILA_PROJECT_ID 3: |
| FINANCIAL_PROJECT_ID 4: |
| TEXT1: |
| Subcontractor name: |
| Subcontractor name_2: |
| Street Address: |
| Street Address_2: |
| City State Zip: |
| City State Zip_2: |
| day: |
| NOTARY_COUNTY: |
| MONTH: |
| YEAR: |
| Print name of person signing Certification: |
| Commission Expires: |
| Signed by "Contractor Name": |
| PERSONALLY_KNOWN: Off |
| PRODUCED_ID: Off |
| TYPE_OF_ID: |
| Title: |
| DATE: |
| CONTRACT_NO: |
| MONTHLY: Off |
| FINAL: Off |
| VENDOR NAME: |
| DATE WORK BEGAN: |
| DATE WORK ENDS: |
| PAY ITEM NO: |
| TEXT FOR EXCEPTION: |
| 2ND PAY ITEM NO: |
| TEXT FOR 2ND PAY ITEM EXCEPTION: |
| 3RD PAY ITEM NO: |
| TEXT FOR 3RD PAY ITEM NO: |
| 4TH PAY ITEM NO: |
| TEXT FOR 4TH PAY ITEM NO: |
| FINANCIAL_PROJECT_ID 2: |
| FINANCIAL_PROJECT_ID 3: |
| FINANCIAL-PROJECT_ID 4: |
| 5 Item No: |
| 5TH PAY ITEM TEXT: |
| 6TH PAY ITEM NUMBER: |
| TEXT FOR 6TH PAY ITEM: |
| Print Quality Control Manager Name: |
| Company Name: |
| CONTRACTOR NAME: |
| CONTRACTOR TITLE: |
| A Report No: |
| FINANCIAL_PROJECT_ID: |
| FAP_NO: |
| VENDOR_NAME: |
| Date of Review: |
| G Current Project Phase 1 2 3 etc: |
| Project Location: |
| ChkBox: Off |
| ChkBox-0: Off |
| ChkBox-1: Off |
| DC: |
| REMARKS-0: |
| ChkBox-2: Off |
| ChkBox-3: Off |
| DC-0: |
| REMARKS-1: |
| ChkBox-4: Off |
| ChkBox-5: Off |
| ChkBox-6: Off |
| DC-1: |
| REMARKS-2: |
| ChkBox-7: Off |
| ChkBox-8: Off |
| ChkBox-9: Off |
| DC-2: |
| REMARKS-3: |
| ChkBox-10: Off |
| ChkBox-11: Off |
| ChkBox-12: Off |
| DC-3: |
| REMARKS-4: |
| ChkBox-13: Off |
| ChkBox-14: Off |
| ChkBox-15: Off |
| DC-4: |
| REMARKS-6: |
| ChkBox-16: Off |
| ChkBox-17: Off |
| DC-5: |
| REMARKS-7: |
| ChkBox-18: Off |
| ChkBox-19: Off |
| ChkBox-20: Off |
| DC-6: |
| REMARKS-8: |
| ChkBox-21: Off |
| ChkBox-22: Off |
| ChkBox-23: Off |
| DC-7: |
| REMARKS-9: |
| ChkBox-24: Off |
| ChkBox-25: Off |
| ChkBox-26: Off |
| DC-8: |
| REMARKS-10: |
| ChkBox-27: Off |
| ChkBox-28: Off |
| ChkBox-29: Off |
| DC-9: |
| REMARKS-11: |
| ChkBox-30: Off |
| ChkBox-31: Off |
| ChkBox-32: Off |
| DC-10: |
| REMARKS-12: |
| ChkBox-33: Off |
| ChkBox-34: Off |
| ChkBox-35: Off |
| DC-11: |
| REMARKS-13: |
| ChkBox-36: Off |
| ChkBox-37: Off |
| ChkBox-38: Off |
| DC-12: |
| REMARKS-14: |
| ChkBox-39: Off |
| ChkBox-40: Off |
| ChkBox-41: Off |
| DC-13: |
| REMARKS-15: |
| ChkBox-42: Off |
| ChkBox-44: Off |
| ChkBox-43: Off |
| DC-14: |
| REMARKS-16: |
| ChkBox-45: Off |
| ChkBox-46: Off |
| ChkBox-47: Off |
| DC-15: |
| REMARKS-18: |
| ChkBox-48: Off |
| ChkBox-49: Off |
| DC-16: |
| REMARKS-19: |
| ChkBox-50: Off |
| ChkBox-51: Off |
| DC-17: |
| REMARKS-20: |
| ChkBox-52: Off |
| ChkBox-53: Off |
| ChkBox-54: Off |
| DC-18: |
| REMARKS-21: |
| ChkBox-55: Off |
| ChkBox-56: Off |
| ChkBox-57: Off |
| DC-19: |
| REMARKS-22: |
| ChkBox-58: Off |
| ChkBox-59: Off |
| ChkBox-60: Off |
| DC-20: |
| REMARKS-24: |
| ChkBox-61: Off |
| ChkBox-62: Off |
| ChkBox-63: Off |
| DC-21: |
| REMARKS-25: |
| ChkBox-64: Off |
| ChkBox-65: Off |
| ChkBox-66: Off |
| DC-22: |
| REMARKS-27: |
| ChkBox-67: Off |
| ChkBox-68: Off |
| ChkBox-69: Off |
| DC-23: |
| REMARKS-28: |
| ChkBox-70: Off |
| ChkBox-71: Off |
| ChkBox-72: Off |
| DC-24: |
| REMARKS-29: |
| CHECK FOR INITIAL EVALUATION: Off |
| CHECK FOR COMPREHENSIVE WEEKLY EVALUATION: Off |
| B SIGNING AND PAVEMENT MARKINGS INSTALLED ACCORDIN-0: Off |
| B SIDEWALK CLOSEDSCHOOL MARKINGCROSSWALK SIGNS PLA-0: Off |
| B PORTABLE CHANGEABLE MESSAGE SIGN WARNING LIGHTED-0: Off |
| C VEHICLESEQUIPMENT HAVE FLASHING LIGHTS ANDOR REF-0: Off |
| REMARKS-17: |
| DC-14a: |
| ChkBox-43A: Off |
| ChkBox-44A: Off |
| ChkBox-42A: Off |
| ChkBox-73: Off |
| ChkBox-74: Off |
| ChkBox-75: Off |
| DC-25: |
| REMARKS-31: |
| ChkBox-76: Off |
| ChkBox-77: Off |
| ChkBox-78: Off |
| DC-26: |
| REMARKS-32: |
| ChkBox-79: Off |
| ChkBox-80: Off |
| ChkBox-81: Off |
| DC-27: |
| REMARKS-33: |
| ChkBox-82: Off |
| ChkBox-83: Off |
| ChkBox-84: Off |
| DC-28: |
| REMARKS-34: |
| ChkBox-85: Off |
| ChkBox-86: Off |
| DC-29: |
| REMARKS-36: |
| ChkBox-87: Off |
| ChkBox-88: Off |
| ChkBox-89: Off |
| DC-30: |
| REMARKS-37: |
| ChkBox-90: Off |
| ChkBox-91: Off |
| DC-31: |
| REMARKS-38: |
| ChkBox-92: Off |
| ChkBox-93: Off |
| ChkBox-94: Off |
| DC-32: |
| REMARKS-39: |
| ChkBox-95: Off |
| ChkBox-96: Off |
| ChkBox-97: Off |
| DC-33: |
| REMARKS-41: |
| ChkBox-98: Off |
| ChkBox-99: Off |
| ChkBox-100: Off |
| DC-34: |
| REMARKS-42: |
| ChkBox-101: Off |
| ChkBox-102: Off |
| ChkBox-103: Off |
| DC-35: |
| REMARKS-43: |
| ChkBox-104: Off |
| ChkBox-105: Off |
| ChkBox-106: Off |
| DC-36: |
| REMARKS-44: |
| ChkBox-107: Off |
| ChkBox-108: Off |
| ChkBox-109: Off |
| DC-37: |
| REMARKS-46: |
| ChkBox-110: Off |
| ChkBox-111: Off |
| DC-38: |
| REMARKS-47: |
| ChkBox-112: Off |
| ChkBox-113: Off |
| ChkBox-114: Off |
| DC-39: |
| REMARKS-49: |
| ChkBox-115: Off |
| ChkBox-116: Off |
| ChkBox-117: Off |
| DC-40: |
| REMARKS-50: |
| ChkBox-118: Off |
| ChkBox-119: Off |
| ChkBox-120: Off |
| DC-41: |
| REMARKS-51: |
| ChkBox-121: Off |
| ChkBox-122: Off |
| DC-42: |
| REMARKS-52: |
| ChkBox-123: Off |
| ChkBox-124: Off |
| ChkBox-125: Off |
| DC-43: |
| REMARKS-54: |
| ChkBox-126: Off |
| ChkBox-127: Off |
| ChkBox-128: Off |
| ChkBox-129: Off |
| ChkBox-130: Off |
| ChkBox-131: Off |
| ChkBox-132: Off |
| ChkBox-133: Off |
| ChkBox-134: Off |
| ChkBox-135: Off |
| ChkBox-136: Off |
| ChkBox-137: Off |
| CONES: |
| ChkBox-138: Off |
| ChkBox-139: Off |
| ChkBox-140: Off |
| ChkBox-141: Off |
| ChkBox-142: Off |
| ChkBox-143: Off |
| CONES-0: |
| ChkBox-144: Off |
| ChkBox-145: Off |
| ChkBox-146: Off |
| ChkBox-147: Off |
| ChkBox-148: Off |
| ChkBox-149: Off |
| ChkBox-150: Off |
| ChkBox-151: Off |
| ChkBox-152: Off |
| ChkBox-153: Off |
| ChkBox-154: Off |
| ChkBox-155: Off |
| DRUMS: |
| ChkBox-156: Off |
| ChkBox-157: Off |
| ChkBox-158: Off |
| ChkBox-159: Off |
| ChkBox-160: Off |
| ChkBox-161: Off |
| DRUMS-0: |
| ChkBox-162: Off |
| ChkBox-163: Off |
| ChkBox-164: Off |
| ChkBox-165: Off |
| ChkBox-166: Off |
| ChkBox-167: Off |
| ChkBox-168: Off |
| ChkBox-169: Off |
| ChkBox-170: Off |
| ChkBox-171: Off |
| ChkBox-172: Off |
| ChkBox-173: Off |
| BARRICADES: |
| ChkBox-174: Off |
| ChkBox-175: Off |
| ChkBox-176: Off |
| ChkBox-177: Off |
| ChkBox-178: Off |
| ChkBox-179: Off |
| BARRICADES-0: |
| ChkBox-180: Off |
| ChkBox-181: Off |
| ChkBox-182: Off |
| ChkBox-183: Off |
| ChkBox-184: Off |
| ChkBox-185: Off |
| ChkBox-186: Off |
| ChkBox-187: Off |
| ChkBox-188: Off |
| ChkBox-189: Off |
| ChkBox-190: Off |
| ChkBox-191: Off |
| FIXED CHANNELIZING DEVICES: |
| ChkBox-192: Off |
| ChkBox-193: Off |
| ChkBox-194: Off |
| ChkBox-195: Off |
| ChkBox-196: Off |
| ChkBox-197: Off |
| FIXED CHANNELIZING DEVICES-0: |
| ChkBox-198: Off |
| ChkBox-199: Off |
| ChkBox-200: Off |
| ChkBox-201: Off |
| ChkBox-202: Off |
| ChkBox-203: Off |
| ChkBox-204: Off |
| ChkBox-205: Off |
| ChkBox-206: Off |
| ChkBox-207: Off |
| ChkBox-208: Off |
| ChkBox-209: Off |
| SIGNS: |
| ChkBox-210: Off |
| ChkBox-211: Off |
| ChkBox-212: Off |
| ChkBox-213: Off |
| ChkBox-214: Off |
| ChkBox-215: Off |
| SIGNS-0: |
| ChkBox-216: Off |
| ChkBox-217: Off |
| ChkBox-218: Off |
| ChkBox-219: Off |
| ChkBox-220: Off |
| ChkBox-221: Off |
| ChkBox-222: Off |
| ChkBox-223: Off |
| ChkBox-224: Off |
| ChkBox-225: Off |
| ChkBox-226: Off |
| ChkBox-227: Off |
| RPMs: |
| ChkBox-228: Off |
| ChkBox-229: Off |
| ChkBox-230: Off |
| ChkBox-231: Off |
| ChkBox-232: Off |
| ChkBox-233: Off |
| RPMs-0: |
| ChkBox-234: Off |
| ChkBox-235: Off |
| ChkBox-236: Off |
| ChkBox-237: Off |
| ChkBox-238: Off |
| ChkBox-239: Off |
| ChkBox-240: Off |
| ChkBox-241: Off |
| ChkBox-242: Off |
| ChkBox-243: Off |
| ChkBox-244: Off |
| ChkBox-245: Off |
| ARROW BOARD: |
| ChkBox-246: Off |
| ChkBox-247: Off |
| ChkBox-248: Off |
| ChkBox-249: Off |
| ChkBox-250: Off |
| ChkBox-251: Off |
| ARROW BOARD-0: |
| ChkBox-252: Off |
| ChkBox-253: Off |
| ChkBox-254: Off |
| ChkBox-255: Off |
| ChkBox-256: Off |
| ChkBox-257: Off |
| ChkBox-258: Off |
| ChkBox-259: Off |
| ChkBox-260: Off |
| ChkBox-261: Off |
| ChkBox-262: Off |
| ChkBox-263: Off |
| PCMS: |
| ChkBox-264: Off |
| ChkBox-265: Off |
| ChkBox-266: Off |
| ChkBox-267: Off |
| ChkBox-268: Off |
| ChkBox-269: Off |
| PCMS-0: |
| ChkBox-270: Off |
| ChkBox-271: Off |
| ChkBox-272: Off |
| ChkBox-273: Off |
| ChkBox-274: Off |
| ChkBox-275: Off |
| ChkBox-276: Off |
| ChkBox-277: Off |
| ChkBox-278: Off |
| ChkBox-279: Off |
| ChkBox-280: Off |
| RADAR SPEED DISPLAY UNIT: |
| ChkBox-281: Off |
| ChkBox-282: Off |
| ChkBox-283: Off |
| ChkBox-284: Off |
| ChkBox-285: Off |
| ChkBox-286: Off |
| RADAR SPEED DISPLAY UNIT-0: |
| ChkBox-287: Off |
| ChkBox-288: Off |
| ChkBox-289: Off |
| ChkBox-290: Off |
| ChkBox-291: Off |
| ChkBox-292: Off |
| ChkBox-293: Off |
| ChkBox-294: Off |
| ChkBox-295: Off |
| ChkBox-296: Off |
| ChkBox-297: Off |
| ChkBox-298: Off |
| STOPSLOW PADDLE: |
| ChkBox-299: Off |
| ChkBox-300: Off |
| ChkBox-301: Off |
| ChkBox-302: Off |
| ChkBox-303: Off |
| ChkBox-304: Off |
| STOPSLOW PADDLE-0: |
| ChkBox-305: Off |
| ChkBox-306: Off |
| ChkBox-307: Off |
| ChkBox-308: Off |
| ChkBox-309: Off |
| ChkBox-310: Off |
| ChkBox-311: Off |
| ChkBox-312: Off |
| ChkBox-313: Off |
| ChkBox-314: Off |
| ChkBox-315: Off |
| ChkBox-316: Off |
| PEDESTRIAN LCDs: |
| ChkBox-317: Off |
| ChkBox-318: Off |
| ChkBox-319: Off |
| ChkBox-320: Off |
| ChkBox-321: Off |
| ChkBox-322: Off |
| PEDESTRIAN LCDs-0: |
| Name of Senior Project EngineerProject Administrator: |
| RADAR SPEED DISPLAY UNIT-1-0: Off |
| A LIST OF TRAINED FLAGGERS SUBMITTED TO PROJECT AD-0: Off |
| B SPECIAL DETOURS IE LANE SHIFTS or DIVERSIONS ARE-0: Off |
| D EXISTING NEW and TEMPORARY CURB RAMPS HAVE DETEC-0: Off |
| C FLAGGER WEARING APPROVED SAFETY VESTUSING PROPER-0: Off |
File details come from the government source that posted it. Updated .