Summary
This document comprises bid drawings for the Air Traffic Control Tower Rehabilitation project at Flagler Executive Airport in Flagler County, Florida, prepared by AVCON, Inc. Engineers & Planners. The project scope includes rehabilitation of the ATCT structure and supporting infrastructure, encompassing building envelope repair and repainting, structural repairs to the tower and catwalk, replacement of interior components including carpet, cabinets, countertops, and ceiling materials, replacement of seven PTAC air conditioning units and two RTU systems, interior painting, and access control system upgrades. Additional work items contingent on funding availability include hand railing upgrades, exterior up-lighting installation, replacement of the vehicular gate operator, bollard repainting, and seal coating with re-striping of the ATCT parking lot. The project is identified as ITB 26-ITB-018 with coordination requirements for the existing culdesac and parking area. Construction work is limited to 120 calendar days for substantial completion with an additional 30 calendar days permitted for final completion. Work must be coordinated to prevent obstruction of ATCT personnel access, parking, and facility operations during normal operating hours of 0700-1900 local time.
The drawings establish comprehensive construction requirements including site security, staging area designations, contractor access routes, and safety protocols consistent with FAA Advisory Circular AC 150/5370-2. Contractors are responsible for locating and verifying all existing utilities, protecting survey monuments, conducting proper dewatering operations, and providing as-built documentation certified by a Florida registered professional surveyor. All work must comply with Flagler County Land Development Code, current FDOT Standard Specifications, and applicable FAA regulations. The contractor must maintain continuous on-site representation, coordinate with ATCT staff regarding tower operations, obtain necessary permits prior to construction, and ensure all disturbed areas are restored equal to or better than original condition. The drawings contain detailed specifications for pavement markings, accessibility parking stall requirements, construction access gates, barricade placements, and construction safety requirements including vehicle lighting, FOD inspections, and daily site security protocols.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLAGLER EXECUTIVE AIRPORT
FLAGLER COUNTY, FLORIDA
AIR TRAFFIC CONTROL TOWER REHABILITATION
BID DRAWINGS
AVCON, INC.
ENGINEERS & PLANNERS
5555 EAST MICHIGAN ST, SUITE 200 - ORLANDO, FLORIDA 32822
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
www.avconinc.com
2026.355.03
JULY 2026DATE
BID DRAWINGS
REVISIONS
DESCRIPTIONDATENO.
N.T.S.
VICINITY MAP
MIAMI
FT.PIERCE
GAINESVILLE
AIRPORT LOCATION
ST.PETERSBURG
TAMPA
TALLAHASSEE
PENSACOLA
PANAMA CITY
KEY WEST
ORLANDO
JACKSONVILLE
TITUSVILLE
DAYTONA BCH.
PALM COAST, FL
N.T.S.
LOCATION MAP
NORTH
26-ITB-018
XXXXXX-X-XX-XX
X-XX-XXXXX-XX-XXFAA AIP NO.
FDOT FM NO.
FLAGLER COUNTY
PROJ. NO.
PROJECT NO.
N.T.S.
PROJECT MAP
PLANS PREPARED BY:
GI001
FLAGLER
EXECUTIVE
AIRPORT
100 100
NORTH
This item has been digitally signed and sealed by Daniel J.
Nickols, Jr., P.E., on the date adjacent to the seal. Signature must be verified on any electronic copies.
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
FLAGLER EXECUTIVE
AIRPORT (FIN)
FLAGLER COUNTY,
FLORIDA
AIR TRAFFIC
CONTROL TOWER
REHABILITATION
2026.355.03_GI SERIES
B
ID
D O
C U
M
EN
TS
CADD:
AVCON PROJECT NO.
FAA AIP NO.
FDOT FM NO. XXXXXX-1
3-12-00XX-XXX-XXXX
2026.355.03
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
JULY 2026
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
A
B
C
1 2 3 4
A
B
C
1 2 3 4
*T H
IS
S
H
EE
T
SH
A
LL
B E
PR
IN
TE
D
IN
C
O
LO
R , S
H
EE
TS
N
O T
PR
IN
TE
D
IN
C
O
LO
R A
R E
IN
VA
LI
D
FLAGLER COUNTY ITB NO. 26-ITB-018
SHEET NOTES
1. LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND OTHER
FEATURES ARE SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE AT THE TIME OF
PREPARATION OF THESE PLANS. THE CONTRACTOR SHALL FIELD LOCATE, VERIFY, AND FURTHER IDENTIFY THE LOCATIONS, ELEVATIONS, AND DIMENSIONS OF ALL EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES (IDENTIFIED ON THE PLANS OR NOT) AFFECTING ANY COMPONENT OF WORK HEREIN PRIOR TO THE START OF ANY CONSTRUCTION. DISCREPANCIES, CONFLICTS, OR POTENTIAL DEVIATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO THE START OF ANY
CONSTRUCTION.
2. THE CONTRACTOR SHALL CHECK PLANS FOR CONFLICTS AND DISCREPANCIES PRIOR TO THE START OF ANY CONSTRUCTION. SPECIAL ATTENTION SHALL BE TAKEN WITH THOSE EXISTING UTILITIES, STRUCTURES OR FEATURES (IDENTIFIED ON THE PLANS OR NOT) THAT MAY POTENTIALLY CONFLICT OR CROSS PROPOSED DESIGN COMPONENTS (I.E., AIRFIELD ELECTRICAL, STORM SEWERS, SANITARY SEWERS, WATER MAINS, COMMUNICATION LINES, HIGH POWER TRANSMISSION LINES, BUILDING FOUNDATIONS, ETC) AND ANY DISCREPANCIES, CONFLICTS, OR POTENTIAL DEVIATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO THE START OF ANY CONSTRUCTION. ANY
COST ASSOCIATED WITH THE LOCATION OF EXISTING UTILITIES AS OUTLINED ABOVE IS THE
RESPONSIBILITY OF THE CONTRACTOR.
3. ERRORS OR OMISSIONS - DO NOT TAKE ADVANTAGE OF ANY APPARENT ERROR OR OMISSION
DISCOVERED IN THE CONTRACT DOCUMENTS, BUT IMMEDIATELY NOTIFY THE ENGINEER OF SUCH
DISCOVERY. THE ENGINEER WILL THEN MAKE SUCH CORRECTIONS AND INTERPRETATIONS AS
NECESSARY TO REFLECT THE ACTUAL SPIRIT AND INTENT OF THE CONTRACT DOCUMENTS.
4. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN AREAS OF BURIED UTILITIES AND SHALL PROVIDE AT LEAST 48-HOURS NOTICE TO THE UTILITY COMPANIES PRIOR TO CONSTRUCTION TO OBTAIN
FIELD LOCATIONS OF EXISTING UNDERGROUND UTILITIES.
5. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING FACILITIES, ABOVE OR
BELOW GROUND, THAT MAY OCCUR AS A RESULT OF THE WORK PERFORMED BY THE CONTRACTOR
CALLED FOR IN THIS CONTRACT. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING
SURVEY MONUMENTATION, AND ANY DISTURBED MONUMENTATION SHALL BE RESTORED AT
CONTRACTOR'S EXPENSE BY A SURVEYOR SELECTED BY THE OWNER.
6. ALL UNDERGROUND UTILITIES MUST BE IN PLACE AND PASS ALL TESTING OR INSPECTION
REQUIREMENTS PRIOR TO ROAD BASE AND/OR SURFACE IMPROVEMENT CONSTRUCTION.
7. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE PERMITS AND INSPECTION REQUIREMENTS SPECIFIED BY THE VARIOUS GOVERNMENTAL AGENCIES AND THE ENGINEER. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION, AND SCHEDULE
INSPECTIONS AND TESTING ACCORDING TO AGENCY REQUIREMENTS.
8. ALL WORK PERFORMED SHALL COMPLY WITH THE CODES, STANDARDS, REGULATIONS AND
REQUIREMENTS OF THE FLAGLER COUNTY LAND DEVELOPMENT CODE AND ENGINEERING STANDARDS, THE CURRENT EDITION OF THE FDOT STANDARD SPECIFICATIONS FOR ROAD, THE MOST RECENT EDITION OF FAA AC 150/5370-2 OPERATIONAL SAFETY ON AIRPORT DURING CONSTRUCTION, BRIDGE AND UTILITY CONSTRUCTION, AND THE REGULATIONS AND ORDINANCES OF THE VARIOUS OTHER
GOVERNMENTAL AGENCIES HAVING JURISDICTION OVER THE WORK.
9. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS ON ALL PRECAST AND MANUFACTURED ITEMS TO THE ENGINEER FOR APPROVAL. FAILURE TO OBTAIN APPROVAL BEFORE INSTALLATION COULD RESULT IN REMOVAL AND REPLACEMENT AT CONTRACTOR'S EXPENSE. THE ENGINEER'S REVIEW OF THE SHOP
DRAWINGS IS FOR CONFORMITY WITH THE CONTRACT DOCUMENTS AND DOES NOT INCLUDE AN
IN-DEPTH CHECK FOR THE ABILITY OF THE CONTRACTOR TO PERFORM THE WORK IN A SAFE OR EFFICIENT MANNER. THE ENGINEER'S REVIEW OF THE SHOP DRAWINGS DOES NOT RELIEVE THE
CONTRACTOR OF RESPONSIBILITY FOR DIMENSIONAL ACCURACY TO ENSURE FIELD FIT AND
CONFORMITY OF THE VARIOUS COMPONENTS AND DETAILS.
10. CONTRACTOR SHALL KEEP ENGINEER ADVISED OF CONSTRUCTION SCHEDULE CHANGES SO THAT
ENGINEER CAN PROVIDE CONSTRUCTION CERTIFICATIONS TO JURISDICTIONAL AGENCIES.
11. WORK PERFORMED UNDER THIS CONTRACT SHALL INTERFACE SMOOTHLY WITH OTHER WORK BEING PERFORMED ON OR ADJACENT TO THE SITE BY OTHER CONTRACTORS AND UTILITY COMPANIES. IT WILL
BE NECESSARY FOR THE CONTRACTOR TO COORDINATE AND SCHEDULE HIS ACTIVITIES, WHERE
NECESSARY, WITH OTHER CONTRACTORS AND UTILITY COMPANIES.
12. SAFETY - DURING THE CONSTRUCTION AND/OR MAINTENANCE OF THIS PROJECT, ALL SAFETY
REGULATIONS ARE TO BE ENFORCED. THE CONTRACTOR OR THEIR REPRESENTATIVE SHALL BE
RESPONSIBLE FOR THE CONTROL AND SAFETY OF THE TRAVELING PUBLIC AND THE SAFETY OF HIS PERSONNEL. LABOR SAFETY REGULATIONS SHALL CONFORM TO THE PROVISIONS SET FORTH BY OSHA
IN THE FEDERAL REGISTER OF THE DEPARTMENT OF TRANSPORTATION.
13. DURING THE COURSE OF THIS PROJECT, THE CONTRACTOR WILL BE EXPECTED TO CROSS ACTIVE AIRPORT PAVEMENT TO MAINTAIN SAFETY EQUIPMENT AND MEASURES AROUND THE SITE. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO UNDERGO THE PROPER RADIO TRAINING NECESSARY TO
EFFECTIVELY COMMUNICATE WITH THE AIRPORT TOWER STAFF VIA RADIO WHEN CROSSING ACTIVE
PAVEMENT.
14. CONTRACTOR SHALL PROVIDE ALL EQUIPMENT NECESSARY FOR DEWATERING. DISCHARGE WATER FROM DEWATERING SHALL BE CLEAR WITH NO VISIBLE SOIL PARTICLES. DISCHARGE WATER FROM DEWATERING SHALL BE DISPOSED OF IN SUCH A MANNER THAT IT WILL NOT INTERFERE WITH THE NORMAL DRAINAGE OF THE AREA IN WHICH THE WORK IS BEING PERFORMED, OR CREATE PONDING.
THE OPERATION SHALL NOT CAUSE ANY DAMAGE TO ANY PORTION OF THE WORK COMPLETED, OR IN PROGRESS. THE DEWATERING OPERATION SHALL COMPLY WITH THE REQUIREMENTS OF APPLICABLE
REGULATORY AGENCIES, A PRE-WORK MEETING WILL BE CONDUCTED WITH THE OWNER, THE
CONTRACTOR, AND THE ENGINEER PRIOR TO BEGINNING ANY SITE EXCAVATION.
15. "AS-BUILT" PLANS FOR THE PROPOSED CONSTRUCTION SHALL BE PROVIDED UPON THE COMPLETION OF
CONSTRUCTION, THE CONTRACTOR SHALL FURNISH THE OWNER'S ENGINEER WITH COMPLETE
"AS-BUILT" INFORMATION CERTIFIED BY A FLORIDA REGISTERED PROFESSIONAL SURVEYOR, GP-90.
AS-BUILT DRAWINGS SHALL BE COMPLETED ON EXISTING DRAWINGS AND ALL PROPOSED LOCATIONS
AND ELEVATIONS SHALL BE UPDATED WITH AS-BUILT INFORMATION.
16. PIPE LENGTHS SHOWN ARE APPROXIMATE AND SHOULD BE ORDERED FROM FIELD STAKED QUANTITIES.
PLAN PIPE LENGTHS ARE MEASURED AS DETAILED IN THE CORRESPONDING SPECIFICATIONS.
17. THESE DRAWINGS HAVE BEEN PREPARED, IN PART, BASED UPON RECORD DRAWINGS AND/OR CAD FILES FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, THOSE UTILIZING THE INFORMATION ON THESE DRAWINGS ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS
ACCURACY BEFORE USING IT FOR ANY PURPOSE.
18. ALL AREAS DISTURBED AS A RESULT OF THE CONTRACTOR'S STAGING AND CONSTRUCTION
OPERATIONS SHALL BE RESTORED EQUAL TO OR BETTER THAN ORIGINAL CONDITION AT THE
CONTRACTOR'S EXPENSE.
19. ALL DIRT, DUST, STONES AND LOOSE DEBRIS SHALL BE CONTINUOUSLY REMOVED FROM ALL PAVED
SURFACES DURING THIS CONTRACT.
20. ALL OF THE CONTRACTOR'S OPERATIONS SHALL REMAIN ON AIRPORT PROPERTY AT ALL TIMES. UNDER
NO CIRCUMSTANCES WILL THE CONTRACTOR BE ALLOWED ON ADJACENT PROPERTY.
21. THE CONTRACT DOES NOT ALLOW FOR PRICE INCREASES DUE TO ESCALATION IN COST OF UNIT BID ITEMS. THE CONTRACTOR SHALL TAKE THIS INTO CONSIDERATION WHEN PREPARING UNIT PRICES FOR
BID, SEE GP-20-05.
22. FLAGLER COUNTY RESERVES THE RIGHT TO ELIMINATE ANY ITEMS OF THE CONTRACT AND PERFORM THESE ITEMS WITH COUNTY SUPPLIED FORCES AND MATERIALS IN ACCORDANCE WITH SECTION 40 OF
THE GENERAL PROVISIONS.
23. ALL ELEVATIONS REFER TO NAVD 88 VERTICAL DATUM. COORDINATES REFER NAD 83 HORIZONTAL
DATUM.
24. THE TOPOGRAPHIC FEATURES SHOWN HEREON WERE COMPILED FROM A FIELD SURVEY PERFORMED
BY BOWMAN 01-20-2026.
25. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PAYMENT OF ALL FAILED QA TESTING
REGARDLESS OF THE REASON FOR FAILURE. THE CONTRACTOR SHALL ENSURE AREAS ARE PASSING
OR ABLE TO PASS PRIOR TO REQUESTING QA TESTING.
26. WHEN CUTTING CORES DURING ASPHALT QC TESTING, THE CONTRACTOR SHALL MAKE ANY AND ALL NECESSARY EFFORTS TO REMOVE SAWCUT SLURRY DURING CORE DRILLING. IF SLURRY REMAINS AFTER CUTTING OPERATIONS, THE CONTRACTOR SHALL RINSE/WASH THE ASPHALT SURFACE. NO
ADDITIONAL COMPENSATION SHALL BE MADE FOR SLURRY REMOVAL OR CLEANUP. IT SHALL BE
CONSIDERED A NECESSARY AND INCIDENTAL PORTION OF THE QC TESTING PROCEDURE.
27. THE CONTRACTOR SHALL HAVE A REPRESENTATIVE ON CALL AT ALL TIMES FOR EMERGENCY MAINTENANCE OF ON AIRPORT HAZARD LIGHTING, RUNWAY CLOSURE MARKERS, AND BARRICADES.
28. PRIOR TO THE START OF CONSTRUCTION, CONTRACTOR SHALL ACTIVATE ANY ELECTRICAL FIXTURES WITHIN THE INTENDED OVERALL PROJECT WORK AREA AND TAKE NOTE OF ITS EXISTING CONDITIONS.
AFTER CONCLUDING THE OVERALL PROJECT, CONTRACTOR SHALL REACTIVATE ANY ELECTRICAL
FIXTURES WITHIN THE INTENDED OVERALL PROJECT WORK AREA AND TAKE NOTE OF ITS FINAL
CONDITIONS.
ABAN. - ABANDONED
APP. - APPROXIMATE
ASP - ASPHALT
BL - BASELINE
BLDG - BUILDING
BM - BENCHMARK
CL - CENTERLINE
CCR - CONSTANT CURRENT REGULATOR
CIP - CAST IRON PIPE
CMP - CORRUGATED METAL PIPE
CONC. - CONCRETE
CSP - CORRUGATED STEEL PIPE
D - DIAMETER
E - EASTING
ELL - ELBOW / ARM
ELEV. - ELEVATION
FND. - FOUNDATION
HP - HIGH POINT
INV. - INVERT
JCP - JUNCTION CAN PLAZA
LT- LEFT
LP - LOW POINT
MAX. - MAXIMUM
MES - MITERED END SECTION
M.E.G - MEET EXISTING GRADE
MIN. - MINIMUM
N - NORTHING
NA - NOT ACCEPTABLE
NFPA - NATIONAL FIRE PROTECTION
ASSOCIATION
OFA - OBJECT FREE AREA
O.C - ON CENTER
PVMT - PAVEMENT
PC - POINT OF CURVATURE
PCC - PORTLAND CEMENT CONCRETE
PAVEMENT
PI - POINT OF INTERSECTION
PL - PROPERTY LINE
PVI - POINT OF VERTICAL INTERSECTION
PVC - POLYVINYL CHLORIDE PIPE
PET - CROSSLINKED POLYETHYLENE
PRESSURE
TUBING
PVT - POINT OF TANGENCY (VERTICAL
CURVE)
R - RADIUS
RCP - REINFORCED CONCRETE PIPE
RGS - RIGID GALVANIZED STEEL
ROFA - RUNWAY OBJECT FREE AREA
RSA - RUNWAY SAFETY AREA
ROW - RIGHT OF WAY
RPZ - RUNWAY PROTECTION ZONE
RT - RIGHT
RWY - RUNWAY
SHDR - SHOULDER
SICPP - SMOOTH INTERIOR
CORRUGATED POLYETHYLENE PIPE
ABAN. - STATION
TLOFA - TAXILANE OBJECT FREE AREA
TOFA - TAXIWAY OBJECT FREE AREA
TSA - TAXIWAY SAFETY AREA
TWY - TAXIWAY
TYP. - TYPICAL
UG - UNDERGROUND
A1 GENERAL NOTES
C4 ABBREVIATIONS
B4 SHEET INDEX
AMC
DJN
GENERAL NOTES,
ABBREVIATIONS &
SHEET INDEX
DJN
GI002
This item has been digitally signed and sealed by Daniel J.
Nickols, Jr., P.E., on the date adjacent to the seal. Signature must be
Source: Esri, Vantor, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community Powered by Esri
L
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
FLAGLER EXECUTIVE
AIRPORT (FIN)
FLAGLER COUNTY,
FLORIDA
AIR TRAFFIC
CONTROL TOWER
REHABILITATION
2026.355.03_GC SERIES_FINAL
B
ID
D O
C U
M
EN
TS
CADD:
AVCON PROJECT NO.
FAA AIP NO.
FDOT FM NO. XXXXXX-1
3-12-00XX-XXX-XXXX
2026.355.03
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
JULY 2026
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
A
B
C
1 2 3 4
A
B
C
1 2 3 4
*T H
IS
S
H
EE
T
SH
A
LL
B E
PR
IN
TE
D
IN
C
O
LO
R , S
H
EE
TS
N
O T
PR
IN
TE
D
IN
C
O
LO
R A
R E
IN
VA
LI
D
FLAGLER COUNTY ITB NO. 26-ITB-018
GENERAL PLAN & CONSTRUCTION SAFETY AND PHASING PLANA1
GRAPHIC SCALE (FT)
400'200'100'
NORTH
EXISTING FENCE
LINE, (TYP.)
AIR TRAFFIC CONTROL TOWER, SEE
PROJECT MANUAL AND ABBREVIATED
DESIGN CRITERIA PACKAGE FOR DETAILED
PROJECT SCOPE REQUIREMENTS.
EXISTING
CULDESAC
FIN W
AY
SHEET NOTESB1
SHEET LEGEND & PHASING NOTESC1
AIR TRAFFIC CONTROL TOWER REHABILITATION WORK AREA
1. CONTRACTOR SHALL KEEP ALL PAVEMENT SURFACES (AIRSIDE AND LANDSIDE) CLEAN
AND FREE OF DEBRIS.
2. CONTRACTOR SHALL NOT OBSTRUCT ATCT PERSONNEL ACCESS, PARKING, OR
ENTRY/EXIT TO THE ATCT FACILITY THROUGHOUT THE DURATION OF CONSTRUCTION.
3. ANY DAMAGE TO EXISTING STRUCTURES OR PAVEMENTS SHALL BE REPAIRED AT THE
EXPENSE OF THE CONTRACTOR.
4. CONTRACTOR TO INSTALL TEMPORARY STABILIZED ACCESS ROADS AS NEEDED TO
ACCESS THE WORK AREAS.
5. USE OF CRANES, LIFTS, OR BOOMS SHALL BE COORDINATED PRIOR TO USE ON SITE.
ATCT LINE OF SITE SHALL NOT BE OBSTRUCTED AT ANY POINT.
6. ATCT HOURS OF OPERATION ARE 0700-1900 LOCAL. ANY WORK THAT PREVENTS
CONTINUOUS OPERATION OF THE ATCT SHALL BE COMPLETED OUTSIDE OF NORMAL
ATCT HOURS OF OPERATION.
7. WORK COMPLETED DURING THE TOWERS HOURS OF OPERATIONS SHALL BE
NON-DISRUPTIVE. IF CONSTRUCTION NOISE LEVELS DISRUPT OR PREVENT ATCT
PERSONNEL FROM PERFORMING THEIR DUTIES, CONSTRUCTION ACTIVITIES SHALL BE
SUSPENDED AND RESCHEDULED FOR COMPLETION OUTSIDE OF NORMAL TOWER
WORKING HOURS.
8. CLOSE COORDINATION WITH ATCT STAFF AND MANAGEMENT SHALL BE REQUIRED FOR
THIS PROJECT. REQUESTS FOR TEMPORARY CLOSURE OF THE ATCT MAY BE REQUESTED,
BUT SHALL REQUIRE APPROVAL FROM THE OWNER, ENGINEER, AND ATCT STAFF.
9. MATERIAL STOCKPILES AND STORAGE SHALL NOT IMPEDE ACCESS TO THE TOWER OR
OBSTRUCT TOWER LINE OF SITE AT ANY TIME. FAILURE TO ADHERE TO THESE
REQUIREMENTS MAY RESULT IN TEMPORARY WORK STOPPAGE UNTIL THE ISSUES ARE
ADDRESSED TO THE SATISFACTION OF THE OWNER, ENGINEER, AND ATCT STAFF.
10. PARTIAL OR FULL CLOSURES OF DOUG THOMAS WAY OR ADJACENT STREETS ARE NOT
PERMITTED FOR THIS PROJECT.
ATCT ACCESS GATE/CONSTRUCTION ACCESS GATE
CONTRACTOR STAGING, STORAGE, STOCKPILE, AND MATERIAL LAYDOWN AREA
CONTRACTOR ACCESS ROUTE
CONTRACTOR PERSONAL VEHICLE PARKING
1. CONSTRUCTION SAFETY AND PHASING NOTES
2. WORK AREA
2.1. WORK IN WORK AREA SHALL BE LIMITED TO 120 CALENDAR DAYS TO REACH
SUBSTANTIAL COMPLETION. AN ADDITIONAL 30 CALENDAR DAYS SHALL BE
PERMITTED FOR ACHIEVING FINAL COMPLETION.
3. THE CONTRACTOR SHALL HAVE A QUALIFIED REPRESENTATIVE IN RESPONSIBLE
CHARGE OF THE PROJECT ON SITE AT ALL TIMES.
4. ANY CONTRACTOR VEHICLES PRESENT ON THE CONSTRUCTION SITE SHALL BE
EQUIPPED WITH BEACONS OR FLASHING AMBER CONSTRUCTION LIGHTS, AND
IDENTIFICATION MARKINGS IN ACCORDANCE WITH THE CONTRACT AND CONSTRUCTION
SAFETY AND PHASING PLAN DOCUMENT.
5. THE CONTRACTOR SHALL MAINTAIN A SAFE AND SECURE JOB SITE AT ALL TIMES. THE
CONTRACTOR SHALL HAVE A REPRESENTATIVE MAINTAINING GATE ACCESS.
6. CONTRACTOR SHALL TAKE NOTE OF THE EXISTING CONDITIONS OF ANY AIRPORT
OWNED ACCESS GATE AND FENCING THAT IS USED FOR CONSTRUCTION ACCESS. IF
DAMAGED, EXISTING AIRPORT FENCING OR ACCESS GATE SHALL BE REPLACED OR
RESTORES TO ITS ORIGINAL CONDITION.
ACCESS VIA BELLE TERRE BLVD.
AMC
DJN
GENERAL PLAN &
CONSTRUCTION
SAFETY AND
PHASING PLAN
DJN
GC101
This item has been digitally signed and sealed by Daniel J.
Nickols, Jr., P.E., on the date adjacent to the seal. Signature must be
JC
FO
E UGCUGCUGCUGCUGCUGC
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
UG
C
UGC
UGC
UGC
U G E
U G E
U G E
U G E
U G E
U G E
U G E
U G E
U G E
U G E
U G E
U G E
UGE
UGE
UGE
UG
E
UGEUGEUGEUGEUGEUGE
W
E
FO
JC
FO
E UGCUGCUGCUGCUGCUGC
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
U G C
UG
C
UGC
UGC
UGC
U G E
U G E
U G E
U G E
U G E
U G E
U G E
U G E
U G E
U G E
U G E
U G E
UGE
UGE
UGE
UG
E
UGEUGEUGEUGEUGEUGE
W
E
FO
GRAPHIC SCALE (FT)
80'40'20'
NORTH
L
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
FLAGLER EXECUTIVE
AIRPORT (FIN)
FLAGLER COUNTY,
FLORIDA
AIR TRAFFIC
CONTROL TOWER
REHABILITATION
2026.355.03_GC SERIES_FINAL
B
ID
D O
C U
M
EN
TS
CADD:
AVCON PROJECT NO.
FAA AIP NO.
FDOT FM NO. XXXXXX-1
3-12-00XX-XXX-XXXX
2026.355.03
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
JULY 2026
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
A
B
C
1 2 3 4
A
B
C
1 2 3 4
*T H
IS
S
H
EE
T
SH
A
LL
B E
PR
IN
TE
D
IN
C
O
LO
R , S
H
EE
TS
N
O T
PR
IN
TE
D
IN
C
O
LO
R A
R E
IN
VA
LI
D
FLAGLER COUNTY ITB NO. 26-ITB-018
EXISTINGA1 PROPOSEDA3
GRAPHIC SCALE (FT)
80'40'20'
NORTH
EXISTING
PARKING LOT
EXISTING
PARKING LOT
MARKINGS,
(TYP.)
EXISTING FENCE
LINE, (TYP.)
AIR TRAFFIC CONTROL TOWER
NEW PARKING LOT MARKINGS, IN
ACCORDANCE WITH FDOT
STANDARD SPECIFICATIONS
EXISTING FENCE LINE, TO BE PROTECTED IN PLACE. IF FENCE DEMO IS REQUIRED
TO FACILITATE THE WORK, FENCE SHALL BE RESTORED TO ORIGINAL CONDITION.
ATCT CONTAINMENT AREA SHALL STAY SECURED AT ALL TIMES. IF TEMPORARY
FENCING IS REQUIRED, IT SHALL BE INCIDENTAL TO THE VARIOUS WORK ITEMS.
AIR TRAFFIC CONTROL TOWER,
SEE PROJECT MANUAL AND
ABBREVIATED DESIGN CRITERIA
PACKAGE FOR DETAILED
PROJECT SCOPE ITEMS
EXISTING
CULDESAC
FIN WAY
EXISTING
CULDESAC
FIN WAY
WETLAND
WETLAND
PARKING LOT
PAVEMENT TO BE
SEAL-COATED/
REJUVENATED IN
ACCORDANCE
WITH ITEM P-632,
3,500 SF
AMC
DJN
CIVIL/SITE
IMPROVEMENTS
PLAN
DJN
GC102
CLEAN AND REPAINT EXISTING
CONCRETE BOLLARDS (YELLOW)
REMOVE, REINSTALL, AND PAINT
EXISTING CONCRETE PARKING
BLOCKS (YELLOW), TYP. OF 5
ALL DISTURBED
AREAS SHALL BE
RESTORED WITH
SOD (BAHIA)
UNDERGROUND ELECTRICAL
UNDERGROUND AT&T COMMUNICATIONS
EXISTING WATER LINES AND FIRE HYDRANT
EXISTING BACKUP
GENERATOR
EXISTING ELECTRICAL TRANSFORMER
UNDERGROUND ELECTRICAL LINES
FENCE LINE, (TYP.)
FENCE LINE, (TYP.)
This item has been digitally signed and sealed by Daniel J.
Nickols, Jr., P.E., on the date adjacent to the seal. Signature must be
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
FLAGLER EXECUTIVE
AIRPORT (FIN)
FLAGLER COUNTY,
FLORIDA
AIR TRAFFIC
CONTROL TOWER
REHABILITATION
2026.355.03_GC SERIES_FINAL
B
ID
D O
C U
M
EN
TS
CADD:
AVCON PROJECT NO.
FAA AIP NO.
FDOT FM NO. XXXXXX-1
3-12-00XX-XXX-XXXX
2026.355.03
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
JULY 2026
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
A
B
C
1 2 3 4
A
B
C
1 2 3 4
*T H
IS
S
H
EE
T
SH
A
LL
B E
PR
IN
TE
D
IN
C
O
LO
R , S
H
EE
TS
N
O T
PR
IN
TE
D
IN
C
O
LO
R A
R E
IN
VA
LI
D
FLAGLER COUNTY ITB NO. 26-ITB-018
GC501
DJN
GT
DJN
ACCESSIBILITY PARKING STALL MARKINGC2 C3
52"
4" WIDE, WHITE PAINT,
WATERBORNE PAINT WITH
TYPE I REFLECTIVE MEDIA.
NOTES:
1. ALL FDOT PAVEMENT MARKINGS ARE REFERENCED FROM THE
FDOT FY 2025-26 STANDARD PLANS AND SHALL BE IN
ACCORDANCE WITH THE MUTCD 2023 EDITION.
2. GLASS BEADS SHALL BE TYPE I AND SHALL BE APPLIED
IMMEDIATELY AFTER THE APPLICATION OF PAINT.
ACCESSIBLE PARKING
SPOT MARKING, SEE
DETAIL C1, THIS SHEET.
20' (TYP.)
STANDARD PARKING
STALL 9' WIDE, (TYP.)
4" WIDE, WHITE PARKING
SPOT STRIPE, ITEM P-620,
PAVEMENT MARKINGS,
WATERBORNE PAINT, WITH
TYPE I REFLECTIVE MEDIA.
NOTES:
1. ALL FDOT PAVEMENT
MARKINGS ARE REFERENCED
FROM THE FDOT FY 2025-26
STANDARD PLANS AND SHALL
BE IN ACCORDANCE WITH THE
MUTCD 2023 EDITION.
2. GLASS BEADS SHALL BE TYPE I
AND SHALL BE APPLIED
IMMEDIATELY AFTER THE
APPLICATION OF PAINT.
TYPICAL PARKING STALL LAYOUT DETAILSHEET NOTESC1
SHEET NOTES:
1. IF REQUESTED, AUTOCAD FILES MAY BE PROVIDED TO THE CONTRACTOR FOR
ASSISTANCE WITH LAYOUT AND PROJECT STAKING, HOWEVER, THE AUTOCAD FILES
SHALL BE USED FOR REFERENCE ONLY.
2. CONTRACTOR SHALL VERIFY EXISTING BENCHMARK INFORMATION PRIOR TO LAYOUT
AND STAKING IN ACCORDANCE WITH THE PLANS. CONTRACTOR SHALL PROVIDE THE
ENGINEER WITH WRITTEN DOCUMENTATION THAT SURVEY CONTROL WAS ESTABLISHED
IN ACCORDANCE WITH THE PLANS AND DETAILS PRIOR TO LAYOUT AND STAKING OF
PROPOSED WORK.
MARKING NOTES:
3. PRIOR TO APPLICATION OF PAINT MARKINGS, THE CONTRACTOR LAYOUT SHALL BE
REVIEWED AND APPROVED BY THE ENGINEER.
4. ANY MARKINGS OBSCURED BY CONSTRUCTION OPERATIONS OUTSIDE OF THE SCOPE OF
WORK SHALL BE RESTORED BY THE CONTRACTOR. IF ANY EXISTING MARKINGS ARE
DISTURBED OUTSIDE OF THE SCOPE OF WORK THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ANY ADDITIONAL MARKING COST.
5. PRIOR TO THE APPLICATION OF PAINT THE CONTRACTOR SHALL SWEEP THE PAVEMENT
AND REMOVE ANY ASPHALT SCABS BEFORE PROCEEDING WITH THE MARKING LAYOUT.
GENERAL NOTES
1. ALL VEHICLES IN THE CONSTRUCTION AREA MUST BE EQUIPPED WITH
AN ORANGE AND WHITE CHECKERED FLAG ON THE HIGHEST POINT OR
A FLASHING/ROTATING AMBER CONSTRUCTION BEACON.
2. ACCESS TO THIS PROJECT REQUIRES USE OF EXISTING CITY AND
AIRPORT ROADS. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO ENSURE THAT ALL ACCESS SURFACES REMAIN
CLEAN AND CLEAR OF DIRT AND DEBRIS AT ALL TIMES.
3. ADDITIONALLY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
REPAIRING ANY AND ALL DAMAGE INFLICTED UPON THE ACCESS
ROUTES OVER THE DURATION OF THE PROJECT. THE
ENGINEER/OWNER SHALL DOCUMENT THE EXISTING CONDITION AND
POST-CONDITION OF ALL ACCESS ROUTES. ANY MEASURABLE DAMAGE
SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO
THE OWNER.
4. THE CONTRACTOR SHALL CONDUCT ALL WORK IN ACCORDANCE WITH
FAA ADVISORY CIRCULAR AC 150/5370-2, LATEST EDITION.
5. THE CONTRACTOR SHALL CONTACT THE ENGINEER FOR CONTACT
INFORMATION OF KEY AIRPORT PERSONNEL.
6. THE BARRICADES INDICATED ON THE PLAN REPRESENT THE TRAFFIC
CONTROL REQUIRED DURING CONSTRUCTION. IN THE EVENT THAT
MORE TRAFFIC CONTROL IS REQUIRED DURING CONSTRUCTION, IT IS
THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE NUMBER
AND LOCATION OF BARRICADES REQUIRED TO KEEP THE ACTIVE WORK
AREA PROTECTED.
7. THE CONTRACTOR IS REQUIRED TO SUBMIT A SAFETY PLAN
COMPLIANCE CERTIFICATION (SPCC). THIS DOCUMENT CERTIFIES THAT
THE CONTRACTOR HAS READ AND UNDERSTANDS THE SAFETY AND
PHASING REQUIREMENTS OF THE PROJECT. ADDITIONALLY THE
CONTRACTOR AGREES TO FOLLOW THE RULES AND REQUIREMENTS
OF THIS SAFETY AND PHASING PLAN, THE CONTRACT DOCUMENTS AND
THE REQUIREMENTS OF FAA ADVISORY CIRCULAR 150/5370-2, LATEST
EDITION. A NOTICE TO PROCEED (NTP) WILL NOT BE ISSUED UNTIL THE
SPCC IS SUBMITTED.
8. NO BADGING IS REQUIRED FOR THIS PROJECT/AIRPORT, HOWEVER THE
CONTRACTOR SHALL BE REQUIRED TO COORDINATE WITH THE OWNER
FOR ACCESS THROUGH THE AUTOMATED GATES.
9. THE CONTRACTOR SHALL HAVE A REPRESENTATIVE ON SITE AT ALL
TIMES WHILE WORK IS BEING COMPLETED.
10. ATCT ACCESS GATE SHALL REMAIN CLOSED AND SECURED AT ALL
TIMES, UNLESS A GATE GUARD IS PROVIDED TO ENSURE ONLY
AUTHORIZED ACCESS IS GRANTED THROUGH THE GATE.
11. ANY CONTRACTOR VEHICLES PRESENT ON THE CONSTRUCTION SITE
WILL BE REQUIRED TO HAVE THEIR VEHICLES EQUIPPED WITH THE
APPROPRIATE VEHICLE LIGHTING, AND VEHICLE IDENTIFYING MARKING
IN ACCORDANCE WITH THE CONTRACT AND CONSTRUCTION SAFETY
AND PHASING PLAN DOCUMENT.
12. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN A
SAFE AND SECURE JOB SITE. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR MAINTAINING SITE ACCESS AND PROPER SECURITY
OF CONSTRUCTION ACCESS GATES.
INSPECTION REQUIREMENTS
1. AT THE END OF EACH DAY, THE CONSTRUCTION AREA SHALL BE
INSPECTED FOR ANY FOREIGN OBJECT DEBRIS (FOD) ON AIRFIELD OR
NON AIRFIELD PAVEMENTS AND FOR ANY EXCESS CONSTRUCTION
MATERIALS.
2. AFTER ALL WORK HAS BEEN COMPLETED FOR THE DAY AND PRIOR TO
DEPARTING THE PROJECT AREA, THE CONTRACTOR OR THEIR
SUPERINTENDENT SHALL SEE THAT:
2.1. ALL TOOLS, EQUIPMENT AND CONSTRUCTION MATERIALS HAVE BEEN
REMOVED AND PROPERLY STORED AT THE STAGING AREA.
2.2. OPEN TRENCHES, EXCAVATIONS AND STOCKPILED MATERIAL AT THE
CONSTRUCTION SITE SHALL BE PROMINENTLY MARKED WITH LIGHTS
DURING HOURS OF DARKNESS.
SAFETY REQUIREMENTS
1. THE CONTRACTOR OR THEIR PROJECT REPRESENTATIVE SHALL NOTIFY THE
AIRPORT REPRESENTATIVE PRIOR TO STARTING WORK EACH DAY AND WHEN
WORK HAS BEEN COMPLETED FOR THE DAY. IT SHALL ALSO BE THE
CONTRACTOR OR THEIR REPRESENTATIVE'S RESPONSIBILITY TO MAKE A
THOROUGH CHECK OF THE WORK AREAS, TO SEE THAT ALL EQUIPMENT HAS
BEEN RETURNED AND PARKED IN THE PARKING AREAS DESIGNATED BY THE
ENGINEER.
3. EQUIPMENT NOT IN OPERATION SHALL BE KEPT IN THE STAGING AREA;
PERSONNEL SHALL NOT ENTER OR OPERATE EQUIPMENT WITHIN
ACTIVE OPERATIONAL AREAS OF THE AIRPORT WITHOUT SPECIFIC
PERMISSION FROM THE OFFICE OF THE AIRPORT REPRESENTATIVE.
4. ALL CONSTRUCTION EQUIPMENT AND VEHICLES WILL BE REQUIRED TO
HAVE A FLAG ON STAFF OR A YELLOW/AMBER LENS
ROTATING/FLASHING LIGHT MOUNTED ON THE ROOF OR SO ATTACHED
TO THE VEHICLE THAT THE FLAG OR LIGHT WILL BE READILY VISIBLE.
THE FLAG SHOULD BE NO LESS THAN 3 FEET SQUARE CONSISTING OF
A CHECKERED PATTERN OF INTERNATIONAL ORANGE AND WHITE
SQUARES OF NOT LESS THAN ONE FOOT ON EACH SIDE. THE
CONTRACTOR SHALL HAVE A SUFFICIENT NUMBER OF FLAGS AND
STAFFS TO PROVIDE FOR ALL VEHICLE AND EQUIPMENT NEEDS.
5. UNAUTHORIZED ENTRANCE OF CONTRACTOR EMPLOYEES AND
EQUIPMENT INTO AN AIR OPERATIONS AREA WILL BE CAUSE FOR
IMMEDIATE ACTION AS PROVIDED FOR IN GENERAL PROVISIONS
SUBSECTION TITLED CHARACTER OF WORKERS METHODS AND
EQUIPMENT OF SECTION 80.
CONSTRUCTION SAFETY AND PHASING NOTESA1
NOTES:
1. THE CONTRACTOR SHALL FURNISH THEIR
OWN LOCKING MECHANISM FOR THE GATE
FOR THE DURATION OF THE PROJECT.
2. AT THE COMPLETION OF THE PROJECT, THE
CONTRACTOR SHALL REMOVE THEIR LOCKS
AND NOTIFY THE AIRPORT.
3. THE GATE MATERIAL SHALL MATCH EXISTING
FENCE FABRIC AND MATERIAL (GALVANIZED
STEEL), IN ACCORDANCE WITH ITEM F-162.
4. GATE LOCATION SHALL BE COORDINATED BY
THE CONTRACTOR, AND APPROVED BY THE
ENGINEER, TO COINCIDE WITH THE
CONTRACTOR INSTALLED STABILIZED
CONSTRUCTION ENTRANCE.
5. COST OF INSTALLING CONSTRUCTION ACCESS
GATES SHALL BE PAID UNDER F-152
CONSTRUCTION ACCESS GATE.
SECURITY SIGN SHALL READ "AIRPORT PROPERTY NO
TRESPASSING VIOLATORS WILL BE PROSECUTED" AND SHALL BE
SIZED AS NEEDED AND AS APPROVED BY THE ENGINEER.
3 ROWS OF 2-STRAND TWISTED 12-1/2 GAUGE,
ZINC-COATED, BARBED WIRE WITH 4 POINT BARBS
SPACED AT 5"±
CONNECT EXISTING/NEW
FENCE FABRIC TO GATE
POSTS, TYP. BOTH SIDES
3" O.D. GALVANIZED
STEEL PIPE, GATE POSTS
WELD ALL JOINTS, TYP.
2" MESH, #9 GAUGE WIRE,
GALVANIZED STEEL
1 58" O.D. GALVANIZED STEEL PIPE
2" O.D. GALVANIZED,
STEEL PIPE
FINISHED/EXISTING
GRADE
CONCRETE, IN ACCORDANCE
WITH ITEM P-610, CONCRETE
FOR MISCELLANEOUS
STRUCTURES
18"
DIA.
18"
DIA.
SELF DRAINING
CENTER STOP1'
-6
M
IN
12"
DIA.
3' -6
(T
YP
3" M
AX
4' (T
YP
6' 4"
1'
BALL CAP (TYP.)
4" DIA. X 10' LONG COPPER
CLAD STEEL GROUND ROD,
INCIDENTAL TO ITEM F-162,
CONSTRUCTION ACCESS
GATE
#6 SOLID BARE
COPPER WIRE
20'
TEMPORARY CONSTRUCTION ACCESS GATE (IF NECESSARY)A3
C3 LOW PROFILE BARRICADE DETAIL
CAUTION LIGHT
SECURED TO BARRIER
(TWO PER BARRIER)
COLOR: RED
REFLECTIVE MEDIA (ORANGE
AND WHITE STRIPES)
4' (TYP)
SEE NOTES
WATER-FILLED
BARRICADE
NOTES:
1. LOW PROFILE BARRICADES SHALL BE SUFFICIENTLY WEIGHTED TO PRECLUDE
MOVEMENT FROM PROP BLAST.
2. FLAT, DIRECTIONAL WARNING LIGHTS SHALL NOT BE ACCEPTABLE.
3. EXACT LOCATIONS SHALL BE DETERMINED DURING CONSTRUCTION BY THE ENGINEER.
4. BARRICADES SHALL BE WATER-FILLED OR WEIGHED IN A WAY TO PREVENT MOVEMENT
DUE TO WIND, JET BLAST, OR PROP WASH.
5. PLACEMENT, MAINTENANCE, AND REMOVAL OF BARRICADES SHALL NOT BE PAID
SEPARATELY AND SHALL BE INCIDENTAL TO ITEM GP-80, CONSTRUCTION SAFETY AND
PHASING PLAN COMPLIANCE.
6. PRIOR TO THE RE-OPENING OF AIRFIELD PAVEMENTS, THE PAVEMENT UNDERNEATH
THE BARRICADES SHALL BE SWEPT AND FREE OF DEBRIS.
CONSTRUCTION
SAFETY AND
PHASING NOTES
& DETAILS
This item has been digitally signed and sealed by Daniel J.
Nickols, Jr., P.E., on the date adjacent to the seal. Signature must be
| Sheets and Views |
| GI001 |
| 2026-07-24T13:31:39-0400 | |
| Daniel Nickols Jr | |
| I am approving this document |
| 2026-07-24T13:31:34-0400 | |
| Daniel Nickols Jr | |
| I am approving this document |
| 2026-07-24T13:31:29-0400 | |
| Daniel Nickols Jr | |
| I am approving this document |
| 2026-07-24T13:31:24-0400 | |
| Daniel Nickols Jr | |
| I am approving this document |
| 2026-07-24T13:31:15-0400 | |
| Daniel Nickols Jr | |
| I am approving this document |
File details come from the government source that posted it. Updated .