The file is a Contract Progress Report for the AGE Parking Pad Project at Dyess Air Force Base in Texas. The project involves designing and constructing a new portland cement concrete (PCC) parking area with associated stormwater drainage systems, with a total contract value between $1,000,000 and $5,000,000. This is a 100% HUBZone set-aside procurement, with a solicitation due date of 18 August 2025 at 2:30 PM.
The progress report details 33 specific work elements, each allocated 1% of the total project scope, covering phases from initial bonds and mobilization through construction submittals, various infrastructure installations (electrical, plumbing, HVAC), finishes, and closeout activities. The contract is with the Department of the Air Force Global Strike Command, and notable contractual conditions include that funds are not currently available, and the government reserves the right to cancel the solicitation at any time without reimbursing offeror costs.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CONTRACT PROGRESS REPORT | OMB No. 0704-0188 | |||||
| CONTRACTOR | PROJECT #: | FNWZ 25-0106 | ||||
| PROJECT NAME: | ADD/ALTER AGE PARKING PAD | |||||
| REPORT #: | PERIOD COVERED | CONTRACT NO. | CONTRACT COMPLETION DATE | |||
| 1 | FROM: x/xx/2025 TO: x/xx/2025 | FA4661- | x/xx/2026 | |||
| LINE | WORK ELEMENT | % OF | % COMPLETED | % COMPLETED | ||
| NO. | TOTAL JOB | THIS PERIOD | CUMULATIVE | |||
| 1 | Bonds | 1.00% | ||||
| 2 | Mobilization | 1.00% | ||||
| 3 | Design Submittals & Documents | 1.00% | ||||
| 4 | Construction Submittals | 1.00% | ||||
| 5 | Demolition | 1.00% | ||||
| 6 | Concrete Foundations & Slabs | 1.00% | ||||
| 7 | Wall Framing | 1.00% | ||||
| 8 | Wall Penetrations & Repair | 1.00% | ||||
| 9 | Doors & Frames | 1.00% | ||||
| 10 | Windows | 1.00% | ||||
| 11 | Interior Framing & Sheathing | 1.00% | ||||
| 12 | Electrical Rough-In | 1.00% | ||||
| 13 | Fire Alarm / MNS Rough-In | 1.00% | ||||
| 14 | Plumbing Rough-In | 1.00% | ||||
| 15 | HVAC Equipment | 1.00% | ||||
| 16 | HVAC Rough-In | 1.00% | ||||
| 17 | Fire Suppression Rough-In | 1.00% | ||||
| 18 | Exterior Concrete | 1.00% | ||||
| 19 | Wall Insulation | 1.00% | ||||
| 20 | Wall Sheathing | 1.00% | ||||
| 21 | Tape, Float, Texture, & Paint | 1.00% | ||||
| 22 | Ceramic & Porcelain Tile | 1.00% | ||||
| 23 | Cabinets & Solid Surface | 1.00% | ||||
| 24 | Electrical Fixtures | 1.00% | ||||
| 25 | Plumbing Fixtures | 1.00% | ||||
| 26 | Restroom/Toilet Accessories | 1.00% | ||||
| 27 | HVAC Start-Up | 1.00% | ||||
| 28 | Fire Alarm / MNS Testing | 1.00% | ||||
| 29 | Fire Suppression Finishout | 1.00% | ||||
| 30 | Interior & Exterior Signage | 1.00% | ||||
| 31 | HVAC Commissioning (FIXED AMOUNT) | 1.50% | ||||
| 32 | Contractor Punchlist | 1.00% | ||||
| 33 | O&M, As-Builts, & Closeout (FIXED AMOUNT) | 1.50% | ||||
| TOTAL | 34.00% | 0.00% | 0.00% | |||
| REMARKS: |
| Scheduled % Complete: _____% | ||||
| Actual % Complete: _____% | ||||
| At the Contracting Officer’s discretion and according to the payments clause of the contract, the information | ||||
| provided on this form may be used for computing progress payments. | ||||
| PROGRESS OR COMPLETION CERTIFICATE | ||||
| I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications. | ||||
| SUBMITTED BY OR FOR | ||||
| Contractor | Base Civil Engineer | |||
| TYPED NAME AND TITLE | SIGNATURE | DATE | ||
| X | X | 6/1/25 | ||
| REVIEWED BY OR FOR CONTRACTING OFFICER | ||||
| TYPED NAME AND TITLE | SIGNATURE | DATE |
In House Reproduction of AF FORM 3065 PREVIOUS EDITION IS OBSOLETE U.S. G.P.O. 1984-4207979/13318