This document is a contractor questions and answers (Q&A) document for a Department of the Air Force project at Dyess Air Force Base, Texas, dated 6 August 2025, concerning an Add/Alter AGE Parking Pad project (FNWZ 25-0106). The project involves constructing a new parking pad for ground equipment, with specific requirements including non-aircraft rated pavement, 8-inch minimum concrete thickness, and design for a specific ground equipment list. Key technical details include: contractors can dual/triple role management positions, must use 650 PSI flexural strength concrete, obtain an Airfield Construction Waiver, have airfield driver's licenses, and design the pavement for a 25-year lifespan. The government will relocate existing materials, provide CAD drawings upon award, and requires compliance with various specifications for concrete construction, seeding, and utility surveys.

The Q&A document comprehensively addresses 36 contractor questions covering project specifics such as soil conditions, utility maps, design submissions, equipment ratings, working hours, and site access. Notable requirements include low-profile barricades, continuous debris cleanup, compliance with storm water regulations, and no on-base lodging available. The project will be completed in two phases (design and construction), with construction activities beginning only after design approval. Contractors must be prepared for specific airfield operational constraints, including yielding to aircraft traffic and obtaining necessary licenses and waivers.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 7TH BOMB WING (AFGSC)

DYESS AIR FORCE BASE, TEXAS

Death from above

6 August 2025

FNWZ 25-0106 Add/Alter AGE Parking Pad

SUBJECT: Contractor Questions

1. Will the government relocate the existing material/ equipment?

- Yes. The Government will relocate the existing material/equipment prior to construction. The contractor will not be responsible for removing any existing material/equipment.

2. Can the contractor dual role or triple hat the Superintendent//QC/SSHO roles?

- Yes.

3. Is there an existing Geotechnical report available for this area or an area near this location?

- Please see Attachment A

4. Are there as builts, or utility maps available that may clarify the elevation of the existing waterlines?

- Please see Attachment B

5. Is there a requirement that will make this paving be classified as airfield paving?

- Pavement will be non-aircraft rated pavement but should be design for Pad Vehicle List provided in the SoW under Attachment E

6. Should the contractor anticipate any environmental remediation needed for the soils in this area?

- No known soil conditions would require remediation.

7. Is the contractor/subcontractor required to staff personnel with ACI certifications? If so, which certifications?

- Please see Specification Section 32 13 13.03 PCC Construction for Street Pavements Para.

1.4.2.2 Field Technicians

8. Is a vacuum truck required for the access to this area of the parking mat?

- The contractor shall provide continuous cleanup of debris from construction activities on haul route and construction site. This can be done using a vacuum sweeper.

9. Are low profile barriers required for this area or are standard barricades acceptable?

- Low profile barricades are required and must follow UFC 3-260-04

10. Can environmental provide a list of acceptable grasses for use near the flightline?

- Please refer to Specification 32 92 19 Seeding, Para. 2.1.3 Seed Purity

11. Will the contractor be working under the bases's storm water permit, or will we be required to carry this in addition to the bases permit?

- The contractor shall comply will all City, State, and Federal regulations regarding storm water. See Specification Section 00 01 04 Environmental Para. Part 2

12. Are there any phasing requirements?

- The design must be approved prior to construction. Project will be in two phases. Design and

Construction.

13. Will CAD files be provided to assist with expediting the design?

- Yes. CAD Drawings will be provided upon award.

14. With the quick timeline for the initial design submission, would it be considered that the design duration is extended? Would it be an option to starting demo prior to the design being completed be acceptable?

- Construction activities can begin once there is an approved design.

15. Per UFC 3-250-01, Is there a minimum required pavement section required by the base, or should this be up to the designer?

- SoW requires a minimum thickness of 8 inches.

16. Are there any requirements for materials to be jet fuel or liquid oxygen resistant?

- Jet fuel or liquid oxygen resistant is not a requirement.

17. Can the government clarify how the contractor will be able to access the site, is there a specific haul route that we will be required to use that could impact hauling or delivery times?

- See Attachment C

18. Would an airfield waiver be required for pumping operations if the pump height doesn't exceed the height of the building and will not be left up over night?

- An Airfield Construction Waiver is required for this project. The waiver will be requested by the Government at contract award. The waiver will include a list of contractor equipment to be used.

19. Is airfield drivers training required for this location?

- Yes. Any individual driving must have an airfield driver’s license.

20. Is there an option to skip straight to 95% then 100% and IFC's?

- 35% design is the minimum required for NTP+30 days per SoW. The contractor can submit

95% instead if they choose.

21. Should this be designed for 20 year lifespan, or 30 year?

- 25 year is preferred.

22. Is a jobsite trailer required for this project?

- SoW or Specifications do not require a job trailer.

23. Is the contractor required to perform any utility surveys?

- Refer to Specification Section 00 01 03 Utilities. The contractor is solely responsible for locating and marking the exact location of all existing utilities. The Government does NOT know the exact location of the utilities in the work area.

24. In order to provide an accurate price without accounting for substantial contingencies, can contractor assume in pricing that any additional undercutting of soils due to unsuitable soils found as a result of geotechnical borings or soft areas during proof rolling that would required further undercutting of soils outside of stripping topsoil or removing existing paving would be treated as additional cost? The contractor does know subgrade conditions without further investigation and would create a lot of risk to pricing in the event bad soils were found after stripping paving/topsoil?

- Nearby soil boring reports are provided in Attachment A

25. Is a geotechnical report available to be shared from a nearby building to aid the contractor in understanding soil conditions? We need to know the PVR of soils to understand if undercutting of soils will be required and the thickness of base required under concrete paving? The paving build up is a direct result of soil conditions...

- See Attachment A

26. Will contractor be provided a staging area for equipment and supplies?

- Yes. See Attachment B

27. Can a spec be provided on the preferred trench drain? No spec provided.

- No specifications available. Trench drain shall be rated for traffic and traffic list provided in

SoW Attachment E

28. Is there a location that contractor will be able to stockpile spoils for haul off?

- No.

29. Is there any test requirements to verify existing soil being hauled off are not contaminated?

- No testing required.

30. Or there any special requirements on temporary fencing to protect debris from getting on the flight line?

- Temporary fencing is not required. The contractor shall ensure that all equipment/material is enclosed and/or tied down. The contractor shall keep the site free of any type of blowing debris.

31. Can working hours be extended on days the contractor is pouring concrete?

- Work outside of normal hours will need to be requested and approved by the Contracting Officer.

32. Can photos be provided of the work area by contracting for coordination?

- See Attachment D

33. Aside from clearly portraying the SOW, major milestones, and corrective actions, what else needs to be included in the technical proposal?

- Contractor shall include anything needed to portray understanding of the SoW.

34. Are contractors responsible for relocating the miscellaneous materials and containers on the pre-existing pad?

- Please refer to response to question #1.

35. Do we need a bid bond? Or just a letter from our bonding company showing our bonding capacity?

- A letter from the bonding company providing bonding information is needed.

36. Will there be a geotechnical report provided?

Questions submitted to CE 8/6/2025:

1. For the purpose of fair bidding, can The government provide a typical section for concrete pavement based on Dyess AFB standards for inside airfield areas and past projects solutions?

- Typical pavement section not available. Pavement section should be designed for ground equipment list provided and soil boring provided.

2. It is the intent of the government to use the proposed parking pad only for the mentioned ground equipment, or will also be designed and built to carry heavy bombers and other aircraft at any given moment in the future?

- The proposed AGE parking pad will not carry any aircraft. The pavement should be designed for the ground equipment provided.

3. The statement of work, page 3, paragraph 3.5.3 reads: The concrete shall have a minimum thickness of 8 inches. From past projects experience in Dyess AFB, for the last 20 years the construction of aprons and taxiways have included a 19” Concrete Slab panel on top of 6” RDM gravel layer and 6” mud slab. Please clarify if these standards also apply to the current project.

- The pavement section is not rated for aircraft traffic so past standards do not apply.

4. In reviewing the statement of work and specifications provided it is not specifically mandated the use of 650flex concrete for construction of concrete panels. From past projects experience in Dyess AFB, for the last 20 years the construction of aprons and taxiways has specified the use of 650flex concrete for all areas inside the airfield. Please clarify if this standard also applies to the current project.

- Yes. Specification Section 32 13 13.03 PCC Construction for Street Pavements Para. 2.2.1.1 Flexural Strength requires a minimum of 650 PSI flexural

5. In reviewing the statement of work and specifications provided it is not specifically mandated the use of #5 rebar @ 6” OCEW for the construction of all concrete panels. From past projects experience in Dyess AFB, for the last 20 years the construction of aprons and taxiways has specified the use #5 rebar @ 6” OCEW for all areas inside the airfield. Please clarify if this standard also applies to the current project.

- Reinforcement should be designed for the ground equipment list/pavement section.

6. Due to the new AI facility that is being built in Abilene, and the huge amount of resources that it demands, rentals and hotels are close to impossible to reach. Can the government provide assistance with any kind of lodging inside the base for this project?

- No known lodging available on base.

7. Due to the expansion and general growth of all City of Abilene there are big constraints for the dumping of construction spoils. Can the government allocate an area to permanently stockpile all construction spoils from this project?

- Permanent stockpiles are not permitted on Dyess AFB. All spoils must be removed in accordance to specifications and city, state, and federal regulations.

8. Does the government contemplate the construction of APU slabs for B1 bombers inside proposed concrete panels for future use?

9. Does the government contemplate the installation of moorings in proposed concrete panels for future use?

10. Does the government contemplate the installation of grounding system in proposed concrete panels for future use?

11. Please let us know what the specified class for reinforced concrete pipe is to be used in the current project.

- Class 3 has been used on Dyes AFB before. The reinforced concrete pipe should be designed for the provided traffic pattern and pavement section.

12. Will the adjacent building (B5020) remain operational during construction activities? If yes, will the contractor be required to maintain access to the areas in between the building and construction site? If yes, will the contractor be required to do phasing of the schedule of the work to allow full-time access to the building?

- Yes. The airfield and all supporting facilities will remain operational. No phasing required.

The contractor shall yield to all aircraft traffic.

13. As per provided conceptual plans, concrete panels shall be 12.5’x12.5’. Most of the concrete panels built in the airfield area are 25’x25. Please confirm concrete panel dimensions for the current project that are required by the government.

- The conceptual joint spacing is based on a minimum slab thickness of 8”. The joint plan should be designed according to designer’s pavement thickness and layout.

14. We have concerns about the bad quality of the existing subsoil in current grass areas. As per provided specifications “Compact subgrade for pavements to at least 100 percentage laboratory maximum density for the depth below the surface of the pavement shown.” If the embankment under the subgrade is poor-quality soil material, it will affect the compaction of the subgrade. We might be facing a huge amount of over-excavation and embankment construction with imported suitable soil. For the purpose of bidding, can the government provide a geotechnical report of cores inside the proposed jobsite area?

15. Please let us know if proposed trench drain shall be airfield heavy rated.

- Inlets should be rated for ground equipment list provided.

16. Please let us know if proposed junction box shall be airfield heavy rated.

17. Please let us know if proposed inlets shall be airfield heavy rated.

18. Please let us know if proposed inlets in sod areas shall be airfield heavy rated.

ATTACHMENT A – BORING LOGS

ATTACHMENT B – UTILITY MAPS

ATTACHMENT C – HAUL ROUTE/LAYDOWN

DNAMMOCEKIRTS

AIR FORC E GLOBAL

ATTACHMENT D – PHOTOS

FNWZ 25-0106 Add-Alter AGE Parking Pad - Contractor Questions-(8-6-25)
Designs for questions

File details come from the government source that posted it. Updated .