Pricing Schedule 1.pdf
PDF 265 KB Posted
- Attached to
- AGE Parking Pad - Dyess AFB, TX
- Solicitation number
- FA466125R0009
About this file
This document is a Pricing Schedule for the Add AGE (Aerospace Ground Equipment) Parking Pad project at Dyess Air Force Base. The pricing schedule covers a lump sum (LS) contract for comprehensive survey, design, layout, labor, supplies, equipment, materials, supervision, and incidental work required to complete the parking pad construction. The contract performance timeline is 240 calendar days, broken down into 60 days for design, 180 days for construction and reaching Beneficial Occupancy Date (BOD), and 30 days for closeout documentation. Ten weather-related delay days are included in the construction timeline, with potential additional time granted by the Contracting Officer if weather impacts the critical path.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Corrected QA AGE PAD.pdf | ||
| Solicitation Amendment 0003.pdf | ||
| Solicitation Amendment 0002.pdf | ||
| FNWZ 25-0106 Add-Alter AGE Parking Pad - Contractor Questions-(8-6-25).pdf | ||
| Solicitation - FA466125R00090002.pdf | ||
| Solicitation Amendment 0001.pdf | ||
| FNWZ 25-0106 Add-Alter AGE Parking Pad - Contractor Questions-(8-5-25).pdf | ||
| Solicitation - FA466125R00090001.pdf | ||
| Statement of Work.pdf | ||
| Vehicle List and Weights.pdf | ||
| Pricing Schedule 3.xlsx | XLSX spreadsheet | |
| Wage Determinations.pdf | ||
| Conceptual Drawing.pdf | ||
| Existing Conditions Drawing.pdf | ||
| AGE Pad Parking Specs.pdf | ||
| Solicitation - FA466125R0009.pdf | ||
| Pricing Schedule 2.xlsx | XLSX spreadsheet | |
| QA Sheet.xlsx | XLSX spreadsheet |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment C Add AGE Parking Pad
PRICING SCHEDULE FNWZ 25-0106
Attachment C – Pricing Schedule - Page 1 of 1
0001 Base Pricing, Item 1 – Add AGE Parking Pad (Construction) 529 FUNDS
This item includes all survey, design, layout, plant, labor, supplies, equipment, materials, supervision and incidentals required to complete all work in compliance with the Statement of Work and terms & conditions of the contract for Add AGE Parking Pad.
1 LS $
CONTRACT PERFORMANCE TIME:
1. The successful Contractor will be given a Notice to Proceed (NTP) for Design of the projects after contract award. The Contractor will have 60 calendar days to complete Design before the NTP for Construction is issued; typically after the 35% Design Review. Once the NTP for Construction is issued, the Contractor will have 180 calendar days to complete the Construction portion of the project and reach the Beneficial Occupancy Date (BOD). Once the BOD is complete, the Contractor will have 30 days to complete all the Closeout Documentation. Total period of performance is 240 calendar days.
2. Ten weather days have been included in the Construction portion of the project. Additional time for weather related delays will be site verified & granted by the Contracting Officer on a daily basis when the weather affects the critical path.