The document is an Existing Conditions drawing for the AGE Parking Pad project at Dyess Air Force Base in Texas. The technical drawing depicts a detailed site plan showing underground utility locations, elevation contours, and pavement areas, with specific notations about utility verification, excavation requirements, and infrastructure details. The drawing includes legends for existing conditions such as underground electrical, water, and storm drainage utilities, with grid coordinates and elevation markers ranging from 1768.5 to 1772. The drawing is part of a HUBZone set-aside solicitation (FA466125R0009) for constructing a new portland cement concrete parking area and associated storm water drainage systems, with a project value between $1,000,000 and $5,000,000, and a response deadline of 18 August 2025 at 2:30 PM.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1769.5

8.5

1768.5

1769.5

D

NAMMOCEKIRTS

A

IR

FORC E GLOBAL

N

AutoCAD SHX Text

SW

AutoCAD SHX Text

SW

AutoCAD SHX Text

UE

AutoCAD SHX Text B5020

AutoCAD SHX Text B5021

AutoCAD SHX Text

UE

AutoCAD SHX Text

UE

AutoCAD SHX Text

UE

AutoCAD SHX Text

UE

AutoCAD SHX Text

SW

AutoCAD SHX Text

SW

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text Sequence Number

AutoCAD SHX Text

DYESS

AutoCAD SHX Text

TEXAS

AutoCAD SHX Text Facility Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text

PROJECT TITLE

AutoCAD SHX Text

OF

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

SHEET TITLE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text Designer

AutoCAD SHX Text Drafter

AutoCAD SHX Text Date

AutoCAD SHX Text Project Manager

AutoCAD SHX Text

DESIGN FIRM

AutoCAD SHX Text Air Force Base

AutoCAD SHX Text

SIGNATURE

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

COORDINATION

AutoCAD SHX Text

BY/DATE

AutoCAD SHX Text

FNWZ 25-0106

AutoCAD SHX Text

ADD/ALTER

AutoCAD SHX Text

AGE PARKING

AutoCAD SHX Text

MATSCHEK

AutoCAD SHX Text

MATSCHEK

AutoCAD SHX Text

MATSCHEK

AutoCAD SHX Text

JUNE 2025

AutoCAD SHX Text C1

AutoCAD SHX Text C7

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING CONDITIONS

AutoCAD SHX Text

SCALE: 1" =30'-0"

AutoCAD SHX Text

EXISTING CONDITIONS

AutoCAD SHX Text SHEET NOTES: : 1. REFER TO SHEET G1 FOR GENERAL NOTES AND LEGEND. REFER TO SHEET G1 FOR GENERAL NOTES AND LEGEND. 2. ALL ELEVATIONS SHALL BE FIELD VERIFIED PRIOR ALL ELEVATIONS SHALL BE FIELD VERIFIED PRIOR EXCAVATION, GRADING, ETC. 3. ELEVATIONS WERE TRANSFERRED FROM EXISTING ELEVATIONS WERE TRANSFERRED FROM EXISTING MAPPING. ELEVATIONS SHOWN MAY DIFFER FROM ACTUAL EXISTING CONDITIONS. 4. STORM DRAINAGE PROFILES SHALL BE FIELD VERIFIED STORM DRAINAGE PROFILES SHALL BE FIELD VERIFIED PRIOR TO DEMOLITION AND INSTALLATION. 5. ELEVATIONS/PROFILES FOR STORM DRAINAGE ELEVATIONS/PROFILES FOR STORM DRAINAGE STRUCTURES SHALL ENSURE PROPER WATER DRAINAGE DURING AND AFTER CONSTRUCTION.

AutoCAD SHX Text LEGEND ASPHALT PAVEMENT CONCRETE PAVEMENT EXISTING CONCRETE APRON (25'X25' CONCRETE SLABS) EXISTING UNDERGROUND ELECTRICAL UTILITY EXISTING 24" REINFORCED CONCRETE STORM DRAINAGE PIPE WATER LINE LIMITS OF DISTURBANCE

AutoCAD SHX Text

UE

AutoCAD SHX Text

SW

AutoCAD SHX Text

LOD

AutoCAD SHX Text W

AutoCAD SHX Text CONTOUR INTERVALS ARE 6 INCHES / ELEVATIONS ARE FEET / ELEVATION OF DRAINAGE INTAKE IS 1768'

AutoCAD SHX Text KEYNOTES : : 1. STORM LINE (36" CONC. REIN.) STORM LINE (36" CONC. REIN.) 2. STORM LINE (24" CONC. REIN) STORM LINE (24" CONC. REIN) 3. STORM WATER INLET (18" R.C.P. STORM WATER INLET (18" R.C.P. PLUGGED STUB OUT ON EAST SIDE) 4. UNDERGROUND ELECTRICAL UNDERGROUND ELECTRICAL 5. WATER LINE (8" PVC) WATER LINE (8" PVC) 6. FIRE HYDRANT FIRE HYDRANT 7. LIGHT POLE LIGHT POLE 8. ELECTRICAL MANHOLE ELECTRICAL MANHOLE 9. ELECTRICAL TRANSFORMER ELECTRICAL TRANSFORMER 10. ASPHALT PAVEMENT ASPHALT PAVEMENT 11. CONCRETE PAVEMENT CONCRETE PAVEMENT 12. WATER VALVEWATER VALVE

AutoCAD SHX Text UNDERGROUND UTILITY NOTE: : 1. THE LOCATIONS OF ALL UNDERGROUND UTILITIES ARE APPROXIMATE. THE LOCATIONS OF ALL UNDERGROUND UTILITIES ARE APPROXIMATE. 2. ALL UNDERGROUND UTILITIES SHALL BE FIELD VERIFIED AND MARKED ALL UNDERGROUND UTILITIES SHALL BE FIELD VERIFIED AND MARKED PRIOR TO EXCAVATION, BORING, PROBING OR DRILLING. 3. THE LOCATION OF UNDERGROUND UTILITIES IS BASED ON SURFACE THE LOCATION OF UNDERGROUND UTILITIES IS BASED ON SURFACE EVIDENCE AND/OR SURFACE STRUCTURES IN COMBINATION WITH INFORMATION PROVIDED TO THE SURVEYOR SUCH AS DESIGN AND/OR AS-BUILT DRAWINGS. 4. LOCATIONS OF UNDERGROUND UTILITIES THAT COULD NOT BE FIELD LOCATIONS OF UNDERGROUND UTILITIES THAT COULD NOT BE FIELD LOCATED WERE TRANSFERRED FROM EXISTING MAPPING. OTHER UTILITIES MAY EXIST IN THE PROJECT AREA. 5. NO EXCAVATION, PROBING NOR OTHER FORMS OF SUBSURFACE EXPLORATION NO EXCAVATION, PROBING NOR OTHER FORMS OF SUBSURFACE EXPLORATION WAS PERFORMED TO LOCATE OR VERIFY UNDERGROUND UTILITIES OR STRUCTURES. 6. THE ACTUAL LOCATIONS OF UNDERGROUND UTILITIES AND/OR STRUCTURES THE ACTUAL LOCATIONS OF UNDERGROUND UTILITIES AND/OR STRUCTURES MAY VARY FROM THE LOCATIONS SHOWN HERON. 7. ADDITIONAL UNDERGROUND UTILITIES AND/OR STRUCTURES MAY BE ADDITIONAL UNDERGROUND UTILITIES AND/OR STRUCTURES MAY BE PRESENT: i.e. SOME UTILITIES AND/OR STRUCTURES MAY BE MISSING FROM THIS (THESE) DRAWINGS

AutoCAD SHX Text X

Sheets and Views
EXISTING-C1

File details come from the government source that posted it. Updated .