This is a Pricing Proposal document for Pinellas County, Florida's Invitation to Bid for Construction (ITB-C #26-0394-ITB-C) for a Solid Waste Administration Building HVAC Renovation project located at 3095 114th Avenue North, St. Petersburg, Florida. The project requires complete replacement of the building's HVAC systems, including demolition of existing units and installation of two 15-ton VAV DX Split systems, one 1500 CFM decoupled 100% outside air DX split system, new VAV terminal units with electric heat for zone control, new DDC control systems, refrigerant piping, ductwork modifications, air devices, HVAC controls, electrical panels and wiring, communications systems, and attic insulation improvements. The pricing proposal contains 27 line items covering mobilization, general conditions, selective demolition, concrete housekeeping pads, drywall, ceilings, paint, insulation, mechanical systems, electrical work, permits, and fees, with quantities specified as either lump sum or as scheduled on plans. Step One qualification submissions were due April 21, 2026 at 3:00 p.m., Step Two sealed bids are due May 5, 2026 at 3:00 p.m., questions must be submitted by April 14, 2026 at 3:00 p.m., and a non-mandatory pre-bid conference and site visit are scheduled for April 9, 2026 at 1:30 p.m. The contract term is 365 consecutive calendar days from the Notice to Proceed with no renewal options specified.
The project budget is estimated at $686,580.00 based on the Schedule of Values, with major cost components including electrical panels and equipment ($100,000), overhead and profit ($103,000), DX split systems condensing units and AHUs ($47,600), ductwork supports and insulation ($50,500), electrical wiring and conduit ($65,000), VAV boxes ($31,200), and a contingency reserve of $40,000. There are no set-asides or disadvantaged enterprise restrictions limiting bidder eligibility, and no incumbent contractor is identified. Bidders must possess a Certified General Contractor license with electrical and demolition classifications, EPA Section 608 Technician Certification, general liability insurance of $1,000,000 per occurrence, and provide performance and payment bonds equal to 100% of the contract amount. The County will retain 5% of monthly progress payments until final completion and assess liquidated damages of $1,200 per calendar day for delays beyond the contract completion date. All materials must be first quality, and the contractor must provide manufacturer-supervised startup, four hours of operator training, warranty and operation/maintenance manuals, and system balancing by an AABC and NEBB certified test and balance agency.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Invitation to Bid - Construction (ITB-C) #26-0394-ITB-C Title: SOLID WASTE ADMINISTRATION BUILDING HVAC RENOVATION
9. Pricing Proposal
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 Mobilization 1 Lump Sum
2 General Conditions 1 Lump Sum
3 Selective Demolition - Remove existing HVAC systems and disposal 1 Lump Sum
4 Concrete - Housekeeping pads for new CUs 1 Lump Sum
5 Drywall - As required for HVAC renovations 1 As scheduled on plans
6 Ceilings, Other - As required for HVAC renovations
7 Paint and Wall Coverings - As required for HVAC renovations
8 Insulation - Minor Repairs - As required for HVAC renovations
9 General HVAC Requirements - Basic mechanical requirements, supports, anchors, etc.
10 DX Split Systems - Condensing Units, AHUs - Qty. 2 - 15 Ton VAV DX Split
Systems
2 EA
11 VAV Boxes - as scheduled on plans, with electric heat
12 100% OA DX Split System - 1500 CFM
DOAS DX Split System
13 Refrigerant Piping, Supports, and
Insulation - New refrigerant lines
Line Item Description Quantity Unit of
Measure Unit Cost Total
14 Ductwork, Supports, and Insulation -
New sheet metal ductwork, supports and insulation
15 Air Devices, Grilles, Registers - New air devices
16 HVAC Controls - New HVAC controls 1 As scheduled
17 HVAC Test and Balance (T&B) - AABC or NEBB certified T&B of all HVAC systems
18 System Commissioning (CxA) - CxA of new HVAC systems by approved commissioning agent
19 Electrical Panel and Equipment 1 As scheduled
20 Electrical Wiring and Conduit 1 As scheduled
21 Electrical Demolition - Various 1 As scheduled
22 Electrical Lighting / Conference Room 1 As scheduled
23 Conduit for Mechanical Controls 1 As scheduled
24 Attic Insulation - entire building perimeter 1 Lump Sum
25 Communications - Fire Alarm 1 As scheduled
27 Permits, Fees, Other 1 Lump Sum
TOTAL
Unspecified
Line Item Description Unit of Measure Unit Cost
1 Unspecified Each $40,000.00