This is a Pricing Proposal document for Pinellas County, Florida's Invitation to Bid for Construction (ITB-C #26-0394-ITB-C) for a complete HVAC system renovation at the Solid Waste Administration Building located at 3095 114th Avenue North, St. Petersburg, Florida. The project encompasses demolition of existing HVAC systems and installation of two 15-ton VAV DX Split systems, one 1500 CFM 100% outside air DX split system, new VAV terminal units with electric heat, new DDC controls, refrigerant piping, ductwork modifications, air devices, electrical panels and wiring, lighting upgrades, attic insulation for the building perimeter, and fire alarm communications. The pricing proposal contains 27 line items organized as lump sum and as-scheduled pricing categories, including mobilization, general conditions, selective demolition, concrete housekeeping pads, drywall, ceiling work, paint and wall coverings, insulation repairs, HVAC components and systems, ductwork, controls, testing and balancing, system commissioning, electrical work, and permits. Step One qualification submissions were due April 21, 2026 at 3:00 p.m., Step Two sealed bids were due May 5, 2026 at 3:00 p.m., and a non-mandatory pre-bid conference and site visit were scheduled for April 9, 2026 at 1:30 p.m. The contract term extends 365 consecutive calendar days from the Notice to Proceed with no renewal options specified.
The project budget is estimated at $686,580.00, with major cost components including electrical panels and equipment ($100,000), overhead and profit ($103,000), DX split systems ($47,600), ductwork supports and insulation ($50,500), electrical wiring and conduit ($65,000), and VAV boxes ($31,200), plus a $40,000 contingency reserve. Bidders must possess a Certified General Contractor license with electrical and demolition classifications, EPA Section 608 Technician Certification, and provide performance and payment bonds equal to 100% of the contract amount. No set-asides or disadvantaged enterprise restrictions apply, and no incumbent contractor is identified. The County will retain 5% of monthly progress payments until final completion and assess liquidated damages of $1,200 per calendar day for delays beyond the contract completion date. All materials must be first quality with damaged items exchanged within 24 hours at no cost, and the contractor must provide manufacturer-supervised startup, four hours of operator training, three sets of manuals, and complete system balancing by an AABC and NEBB certified test and balance agency. Compliance requirements include E-Verify affidavits, Foreign Country of Concern affidavits, Common Carrier attestations, and Human Trafficking affidavits, all notarized.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Invitation to Bid - Construction (ITB-C) #26-0394-ITB-C Title: SOLID WASTE ADMINISTRATION BUILDING HVAC RENOVATION
9. Pricing Proposal
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 Mobilization 1 Lump Sum
2 General Conditions 1 Lump Sum
3 Selective Demolition - Remove existing HVAC systems and disposal 1 Lump Sum
4 Concrete - Housekeeping pads for new CUs 1 Lump Sum
5 Drywall - As required for HVAC renovations 1 As scheduled on plans
6 Ceilings, Other - As required for HVAC renovations
7 Paint and Wall Coverings - As required for HVAC renovations
8 Insulation - Minor Repairs - As required for HVAC renovations
9 General HVAC Requirements - Basic mechanical requirements, supports, anchors, etc.
10 DX Split Systems - Condensing Units, AHUs - Qty. 2 - 15 Ton VAV DX Split
Systems
2 EA
11 VAV Boxes - as scheduled on plans, with electric heat
12 100% OA DX Split System - 1500 CFM
DOAS DX Split System
13 Refrigerant Piping, Supports, and
Insulation - New refrigerant lines
Line Item Description Quantity Unit of
Measure Unit Cost Total
14 Ductwork, Supports, and Insulation -
New sheet metal ductwork, supports and insulation
15 Air Devices, Grilles, Registers - New air devices
16 HVAC Controls - New HVAC controls 1 As scheduled
17 HVAC Test and Balance (T&B) - AABC or NEBB certified T&B of all HVAC systems
18 System Commissioning (CxA) - CxA of new HVAC systems by approved commissioning agent
19 Electrical Panel and Equipment 1 As scheduled
20 Electrical Wiring and Conduit 1 As scheduled
21 Electrical Demolition - Various 1 As scheduled
22 Electrical Lighting / Conference Room 1 As scheduled
23 Conduit for Mechanical Controls 1 As scheduled
24 Attic Insulation - entire building perimeter 1 Lump Sum
25 Communications - Fire Alarm 1 As scheduled
27 Permits, Fees, Other 1 Lump Sum
TOTAL
Unspecified
Line Item Description Unit of Measure Unit Cost
1 Unspecified Each $40,000.00
File details come from the government source that posted it. Updated .