Price Breakdown Worksheet 36C26126R0042.docx
DOCX document 22 KB Posted
- Attached to
- Z2DA--Replacement of Ceiling Kitchen Area, Building 1, Basement Project #570-26-228 Fresno, CA
- Solicitation number
- 36C26126R0042
About this file
This is a Price Breakdown Worksheet for a construction solicitation related to the replacement of a ceiling and kitchen area in Building 1, Basement at a Department of Veterans Affairs facility in Fresno, California. The worksheet is a template document designed to capture pricing information from contractors bidding on solicitation number 36C26126R0042, issued by the Veterans Health Administration Veterans Integrated Service Network 21.
The solicitation pertains to Project #570-26-228 and has been subject to amendment to correct the pre-proposal site visit time originally scheduled for Monday, June 15, 2026, add a second pre-proposal site visit, extend the deadline for submitting Requests for Information (RFIs), and extend the overall proposal due date. All other terms and conditions of the solicitation remain unchanged. Contractors responding to this opportunity will need to complete the price breakdown worksheet as part of their proposal submission to clearly itemize labor, materials, and other cost components associated with the ceiling and kitchen area replacement work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Responses Kitchen Ceiling All RFIs.pdf | ||
| Sign In Attendee List 06-15-2026.jpg | JPG image | |
| 36C26126R0042 0002.docx | DOCX document | |
| Pre Proposal Site Visit Flyer 36C26126R0042 Amend 01.docx | DOCX document | |
| 36C26126R0042 0001.docx | DOCX document | |
| Attachment Specifications 570-26-228.pdf | ||
| Attachment Exhibit A Drawing FR-BLDG_01-BASEMENT HOURS.pdf | ||
| 36C26126R0042_2.docx | DOCX document | |
| Pre Proposal Site Visit Flyer 36C26126R0042.docx | DOCX document | |
| Attachment PCRA - NSF Ceiling Replacement.pdf | ||
| Attachment Price Breakdown 570-26-228.xlsx | XLSX spreadsheet | |
| Attachment Requests for Information RFI_ Form.docx | DOCX document | |
| Attachment Exhibit B Basement Floor Drawing.pdf | ||
| Attachment WD CA20260018 05.18.26.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 36C26126R0042 Attachment - Price Breakdown Worksheet
| DESCRIPTION |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
Division 01 -General Requirements
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 02 – Existing Conditions |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 09 – Finishes |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| SUB TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| Overhead |
| $ |
| $ |
| $ |
| $ |
| $ |
| Profit |
| $ |
| $ |
| $ |
| $ |
| $ |
| Bonds and Insurance |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| TOTAL PROPOSAL |
| $ |
| $ |
| $ |
| $ |
| $ |
NOTE: All other costs may be included as a separate item and must be specified in this breakdown.