Attachment Price Breakdown 570-26-228.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Z2DA--Replacement of Ceiling Kitchen Area, Building 1, Basement Project #570-26-228 Fresno, CA
Solicitation number
36C26126R0042
Issued by

About this file

This is a price breakdown template for a flooring replacement project within the VA Northern California Healthcare System (VANCHCS) under RFP 36C26125R0070. The template is structured to capture material and labor costs across multiple divisions of work, including Division 01 (General Requirements with safety requirements and reference standards), Division 02 (Existing Conditions demolition), and Division 09 (Finishes covering acoustical ceilings and linear metal ceilings). The spreadsheet provides line items for subtotals by division, followed by overhead, profit, bonds and insurance calculations, and a final total offer amount. All pricing fields are blank, indicating this is a template awaiting contractor completion.

The associated solicitation (36C26126R0042) is for the Z2DA Replacement of Ceiling Kitchen Area, Building 1, Basement at the Fresno, CA location under Project #570-26-228. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 issued an amendment correcting the pre-proposal site visit time scheduled for Monday, June 15, 2026, adding a second site visit, extending the deadline for submitting Requests for Information, and extending the overall proposal due date. All other terms and conditions remain in full force and effect.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PRICE BREAKDOWN
Replace Flooring throughout VA Northern California Healthcare System (VANCHCS)
RFP 36C26125R0070
DESCRIPTIONMATERIALLABORTOTAL
Division 01. General Requirements
Safety Requirements$$$
Reference Standards$$$
Division 02. Existing Conditions
Demolition$$$
Division 09. Finishes
Acoustical Ceilings$$$
Linear Metal Ceilings$$$
$$$
Subtotal All Divisions$$$
Overhead$$$
Profit$$$
Bonds and Insurance$$$
Subtotal (Overhead/Profit/Insurance)$$$

TOTAL OFFER (ALL Sections) $ $ $

File details come from the government source that posted it. Updated .