Plumbing-Vent-Model.pdf

PDF 155 KB Posted

Attached to
Middle School Roof Replacement
Solicitation number
RFP MASO 270000000153 1
Issued by
Genesee County, Edmore Village, Michigan

About this file

This is a technical drawing specification document for plumbing vent flashing details related to a Middle School Roof Replacement project in Michigan. The drawing (DWG No. 08) provides construction specifications for soft metal flashings used in roofing applications, specifically detailing the installation requirements for plumbing vent stacks and their integration with built-up roofing (BUR) membranes. The specifications outline requirements for sheet lead (minimum 4 lb per square foot) and sheet copper (minimum 16 oz) flashings, with provisions for asphalt-coated roofing felt when copper flashing is installed over iron or steel pipes to prevent galvanic corrosion. The drawing indicates that plumbing vents with diameters less than 2 inches shall utilize soft metal caps, with a minimum 1-inch penetration into the pipe and a minimum 4-inch flanged base for attachment to the roofing membrane using specified mastic adhesive.

The technical specifications require installation over two target plies of the specified BUR membrane with insulation and roof deck as specified in project documents. All soft metal components must be sealed with specified mastic, and stainless steel screening is shown as optional. The drawing is presented at a not-to-scale (NTS) format and includes detailed cross-sectional views showing the relationship between the plumbing vent stack, flashing materials, roofing layers, and structural components. This specification document serves as a reference standard for contractors bidding on or executing the roof replacement work to ensure proper weatherproofing and durability of penetrations through the new roofing system.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DWG NO. 08

NOTES

SOFT METAL FLASHINGS

1. SHEET LEAD: MINIMUM 4 LB. (20kg²/m ) PER SQ.FT.

2. SHEET COPPER: MINIMUM 16 OZ. IF COPPER FLASHING IS INSTALLED OVER AN IRON OR STEEL PIPE, WRAP AN ASPHALT COATED ROOFING FELT TO PREVENT DIRECT CONTACT BETWEEN TWO DISSIMILAR

METALS.

BUILT-UP ROOFING HOT/COLD

PLUMBING VENT FLASHING

ROLLED SOFT METAL FLASHING

1'' DOWN INTO PIPE

STEEL SCREEN

OPTIONAL SOLDER STAINLESS:

PLUMBING VENT STACK

PLUMBING VENT STACK

SET FLANGE IN

SPECIFIED MASTIC

MASTIC SEAL

TWO TARGET PLIES ADHERED

SPECIFIED BUR MEMBRANE

SPECIFED INSULATION

ROOF DECK AS SPECIFIED

FOR PLUMBING VENTS WITH

DIAMETERS LESS THAN

2'' USE SOFT METAL CAPS

SOFT METAL CAP 1'' DOWN

INTO PIPE

IN SPECIFIED ADHESIVE

SHEET TITLE:

DRAWING No.:

SCALE:

NTS

AutoCAD SHX Text

4'' MIN. FLANGE

AutoCAD SHX Text

2'' MIN.

Sheets and Views
Model

File details come from the government source that posted it. Updated .