Metal-Sleeve-and-Storm-Collar.pdf

PDF 143 KB Posted

Attached to
Middle School Roof Replacement
Solicitation number
RFP MASO 270000000153 1
Issued by
Genesee County, Edmore Village, Michigan

About this file

This is a technical drawing specification document for a Michigan middle school roof replacement project, detailing the construction requirements for a built-up roofing (BUR) system with metal sleeve and storm collar installation. The drawing provides detailed specifications for the roof assembly, including the integration of a metal sleeve with a storm collar, wood nailer securing methods, built-up roofing components, insulation layers, and proper fastening procedures. The specification requires two rows of staggered fasteners spaced 24 inches on center, gravel surfacing, two-ply stripping set in specified mastic, a primed flange, and caulked drawband with elastomeric sealant. The storm collar flange must be fastened at 3-inch intervals with mechanical fasteners and sealed with mastic at the metal sleeve perimeter. The drawing is marked as "Not to Scale" (NTS) and dated 2023.

The document serves as a technical reference for contractors bidding on or executing the roof replacement work, establishing the required materials, assembly methods, and quality standards for the roofing system penetration detail. No pricing information, bid response dates, performance timelines, or contract award details are contained within this technical specification drawing.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DWG NO. 06

BUILT-UP ROOFING HOT/COLD

METAL SLEEVE AND STORM COLLAR

WOOD NAILER SECURED

SPECIFIED BUR

SPECIFED INSULATION

ROOF DECK

TO DECK w/ APPROPRIATE

FASTENERS, 2 ROWS

STAGGERED EACH

ROW 24'' O.C. AS SPECIFIED

GRAVEL SURFACING

PROJECTION

TWO-PLY STRIPPING

SET FLANGE IN

SPECIFIED MASTIC

FASTEN 3'' O.C.

STORM COLLAR

CAULK DRAWBAND

w/ SPECIFIED

AND MECHANICALLY

PRIME FLANGE

BEFORE STRIPPING

ELASTOMERIC

SEALANT

PERIMETER

MASTIC SEAL AT

METAL SLEEVE

BATTEN INSULATION

MEMBRANE

SHEET TITLE:

DRAWING No.:

SCALE:

NTS

Sheets and Views
Model

File details come from the government source that posted it. Updated .