Base-Sheet-Fastener-7-Inch.pdf
PDF 117 KB Posted
- Attached to
- Middle School Roof Replacement
- Solicitation number
- RFP MASO 270000000153 1
- Issued by
- Genesee County, Edmore Village, Michigan
About this file
This is a technical drawing specification document for the Middle School Roof Replacement project in Michigan, detailing base sheet fastener placement requirements for built-up roofing installation on lightweight concrete decking. The specification mandates attachment of Tremco-specified base sheets to roof decking using approved fasteners and discs, with fasteners spaced 7 inches on center along sidelaps and in two staggered rows down the longitudinal center of each sheet, positioned 12 inches from each edge. The document establishes increased fastening requirements at perimeter edges (70% increase) and corners (160% increase) in accordance with FM Global Loss Prevention Data Sheets 1-28 and 1-29, with a minimum spacing of 4 inches on center between fasteners.
The drawing (DWG NO. 15) is presented at a not-to-scale (NTS) representation and includes dimensional callouts showing the 4-inch base sheet width margin and the 7-inch on-center spacing intervals. The specification emphasizes flexibility in fastener density calculations on a unit area basis, allowing contractors to add additional rows and increase fasteners per row as needed to meet wind uplift and structural requirements while maintaining the 4-inch minimum spacing constraint. This technical guidance serves as a binding specification for contractors bidding on or executing the roof replacement work.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DWG NO. 15
NOTES
1. ATTACH BASE SHEET TO THE ROOF DECKING WITH APPROVED FASTENERS AND DISCS.
2. SPACE FASTENERS 7 INCHES ON CENTER ALONG SIDELAP AND 7 INCHES ON CENTER IN TWO ROWS
EQUALLY STAGGERED DOWN THE LONGITUDINAL CENTER OF THE SHEET (12 INCHES FROM EACH
EDGE).
3. INCREASE PERIMETER EDGE FASTENING BY 70% AND CORNER FASTENING BY 160% PER FM GLOBAL
LOSS PREVENTION DATA SHEETS 1-28 AND 1-29.
4. DETERMINE FASTENER DENSITY ON A UNIT AREA PER FASTENER BASIS. ADD ADDITIONAL ROWS AND INCREASE FASTENERS PER ROW. DO NOT SPACE FASTENERS CLOSER THAN 4 INCHES ON CENTER.
BUILT-UP ROOFING
HOT/COLD BASE SHEET FASTENER
PLACEMENT FOR LIGHTWEIGHT
CONCRETE
SPECIFIED TREMCO
BASE SHEET
SPECIFIED SEPARATOR
LIGHTWEIGHT CONCRETE
SPECIFIED TREMCO
FASTENER AND PLATE
SHEET TITLE:
DRAWING No.:
SCALE:
NTS
AutoCAD SHX Text
BASE SHEET WIDTH
AutoCAD SHX Text 4"
AutoCAD SHX Text 7"
AutoCAD SHX Text 7"
AutoCAD SHX Text 12"