Piping-Through-Roof-Deck.pdf
PDF 142 KB Posted
- Attached to
- Middle School Roof Replacement
- Solicitation number
- RFP MASO 270000000153 1
- Issued by
- Genesee County, Edmore Village, Michigan
About this file
This is a technical construction drawing specification for the Middle School Roof Replacement project in Michigan, detailing the installation requirements for piping penetrations through a built-up roofing (BUR) system. The drawing provides comprehensive guidance on securing hot and cold piping through the roof deck, including specifications for wood nailers, insulation installation with staggered fasteners spaced 24 inches on center, two-ply stripping flanges set in asphalt cement and mechanically fastened at 3-inch intervals, and proper sloping of pipes to direct water away from the hood. The detail includes requirements for sheet metal collar seals, hood design with cross breaks or slopes for drainage, insulation of interior metal work in cold climates, and metal screw seal closures, all designed to maintain the integrity of the roof membrane while accommodating necessary mechanical penetrations.
The specification emphasizes weatherproofing and durability through multiple seal layers, including asphalt cement sealing of the membrane and proper priming of metal flanges before stripping application. Fasteners are positioned at 8-inch intervals for the hood and additional closure details are provided to ensure complete water management around the piping penetrations. This drawing is scaled as "Not to Scale" (NTS) and represents a standard roofing construction detail intended to guide contractors in proper installation techniques that meet the project's technical and performance requirements.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DWG NO. 18
BUILT UP ROOFING
HOT/COLD PIPING THROUGH ROOF DECK
WOOD NAILER SECURED
SPECIFIED BUR
INSULATION
ROOF DECK
TO DECK w/ APPROPRIATE
FASTENERS, 2 ROWS
STAGGERED EACH
ROW 24'' O.C.
AS SPECIFIED
GRAVEL SURFACING
TWO-PLY STRIPPING
FLANGE SET IN SPECIFIED
ASPHALT CEMENT,
MECHANICALLY FASTENED
3'' O.C., PRIME METAL
FLANGE BEFORE STRIPPING
SLOPE PIPES DOWN
AND AWAY FROM
HOOD
FASTENERS 8'' O.C.
SHEET METAL
COLLAR
SEAL
INSULATE INSIDE OF
METAL WORK IN COLD
CLIMATES
SHEET METAL HOOD
CROSS BREAK
OR SLOPE FOR
DRAINAGE
METAL SCREW
SEAL
CLOSURE DETAIL
ASPHALT CEMENT
SEAL
MEMBRANE
SHEET TITLE:
DRAWING No.:
SCALE:
NTS