Plans - NP DEWA 10(6) 218(2).pdf
PDF 37 MB Posted
- Attached to
- Delaware Water Gap National Recreation Area
- Solicitation number
- 693C73-24-B-000014
About this file
This document is a solicitation for the replacement of Dingmans Falls Access Bridge #1 and the rehabilitation of Vancampens Glen Bridge within the Delaware Water Gap National Recreation Area in Pennsylvania and New Jersey. The project, identified as NP DEWA 10(6) 218(2) and assigned Solicitation Number 693C73-24-B-000014, has an estimated total cost between $2,000,000 and $5,000,000. The work includes roadway reconstruction, new guardrail installation, riprap placement, and other miscellaneous tasks. Bids are expected to be issued on or around June 13, 2024, with the bid due date and location specified in the solicitation documents. The contract will be awarded by the Department of Transportation Federal Highway Administration. Small business set-asides and subcontracting plan requirements are detailed in the solicitation. Bidders are encouraged to submit their proposals electronically.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Title Sheet
Symbols and Abbreviations
Location Map
Typical Section
Summaries and Schedules
Plan and Profile
Erosion and Sediment Control Plan
DESCRIPTION
INDEX TO SHEETS
PLANS FOR PROPOSED
NP DEWA 10(6), 218(2)
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH: 0.07 Miles
ADT (2020)
ADT (2040)
DHV
%Truck
D
V (MPH)
50/50
N/A
SPECIFICATIONS:
BRIDGE:
DESIGN DESIGNATION:
e(max) 6%
C/A None mill and overlay, and other miscellaneous bridge work.
Bridge work includes riprap placement, asphalt pavement
The Old Mine Road (NPS Route 10) and Vancampens Glen installation, and other miscellaneous bridge work.
roadway reconstruction, new guardrail and terminal of the existing bridge superstructure and substructure, Falls Access Bridge #1 work includes the replacement
The Dingmans Falls Road (NPS Route 218) and Dingmans
N
HARDWICK TOWNSHIP, WARREN COUNTY, NJ
DELAWARE TOWNSHIP, PIKE COUNTY, PA
REHABILITATION OF THE VANCAMPENS GLEN BRIDGE
REPLACEMENT OF THE DINGMANS FALLS ACCESS BRIDGE #1 AND
SHEET
NO
A01
A02-A03
A04
B01-B02
C05-C13
D01-D03
M06-M08
LANE MILES:
U.S. DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
NATIONAL RECREATION AREA
DELAWARE WATER GAP
NP DEWA 10(6), 218(2)
and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
ROAD:ROAD: WIDTH
20'
SURFACE BASE SUBGRADE
4" ACP 6" Aggr. N/A
Last Inspection: 11/2/2021
Vancampens Glen Bridge, Structure No. 4320-041P
Last Inspection: 11/1/2021
Dingmans Falls Access Bridge #1, Structure No. 4320-019P
Dingmans Falls Road (NPS Route 218)
Patterson
New Brunswick
Morristown
Newark
Trenton
Elizabeth
Cape May
Atlantic City
Camden
T N P K
T o ll
G A
R D
E N
S T
N J. Dix
Fort
1 9
INTERSTATE
INTERSTATE
INTERSTATE
N
SCALE IN MILES
0 60 120
STATE OF NEW JERSEY
KEY MAP
76 Philadelphia
Harrisburg
Scranton
Pittsburgh
0 50 100
SCALE IN MILES
STATE OF PENNSYLVANIA
KEY MAP
NO SCALE
Pennsylvania
New Jersey
New York
0.13 Miles
NPS Route 218
Old Mine Road (NPS Route 10) (Varies)
23' to 24'
2" ACP N/A N/A
NPS Route 10
50/50
N/A
None
N/A
NP DEWA 10(6), 218(2)
A NPS Route 218 100+26.00 to 102+25.00 0.04
B NPS Route 10 0.03
(Miles)
Schedule Description Station to Station Length BIP Report #
4320-019P
4320-041P
Know what'sbelow.
before you dig.Call
R
PLANS PREPARED BY
Project Manager
Ramesh Kotadia
Lead Designer
Shoukat Nawaz
Highway Design Manager
Damon L. Hassan
A05-A06 Survey Information
M01-M05 Erosion and Sediment Control Narrative
R01-R36 Bridge Plans
P01-P02 Permanent Signing and Striping Plan
Tabulation of Quantities
N01-N03 Temporary Traffic Control Plan
S01-S25 Standards and Details
C01-C04
T01-T20 Roadway Cross Sections
M13 Landscape Plan
M09-M10 Stream Impact
Horizontal Alignment ReportA07
Proposed ContoursM11-M12
Statutes, which include signing and sealing the documents.
license requirements of Title 63, Chapter 5, Pennsylvania engineer employed by the United States is exempt from the the Pennsylvania Department of Environmental Protection. An conformance with Chapter 105 of the rules and regulations of accepted engineering practice, is true and correct, and is in employees of the United States and is in accordance with
These design plans and specifications were performed by
U.S. Department of Transportation
Administration
Federal Highway
JULY 2024
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
M14-M15 Impact Map
M16-M17 Soil Map
Tree Removal PlanD04
:5
P
M
J u ly
A
S h e e t]
C
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_
D e v \C
A D
D \N
P D
E W
A
,2
\d g n \A
N
P D
E W
A (6
(2 tt l.
d g n
PROJECT
NUMBER
SHEET
A01
NPS Drwg No. 620/173739 NPS PMIS No. 222479, 222541
NP DEWA 10(6), 218(2)
0.00EL.
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve original ground outside diameter out to out ordinary high water mark on center nominal maximum size aggregate normal crown north mon.
min.
max.
MP
MOD
ML
monument minimum maximum mile post modification main line spacing, spaces or spaced shoulder section point of spiral to curve seasonal average daily traffic south spa.
shldr.
sec.
SC
SADT
S
NMSA
NC
N
OG
OD
o. to o.
ohwm
o. c.
pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
rte.
rt. or RT reqd.
reinf.
RECP
rdwy.
R/W
R.
R route right required reinforcement rolled erosion control product roadway right-of-way range radius symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot sym.
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SS
SRS
sqyd sqft typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed
W west
1 6
1 6
SEC.
SEC.
E
N 0
RBAR
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION DELAWARE WATER GAP NATIONAL RECREATION AREA
DSY
drwg(s).
dist.
diaph.
diag.
dia.
DHV
D ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CO
CMP
CL
cc or c. to c.
brg.
br.
BP
BM
BK
appr.
AMD
AH
ADT
ACP
abut.
double solid yellow drawing(s) distance diaphragm diagonal diameter design hourly volume diameter centers curve to spiral continuous construction joint connection concrete column contracting officer corrugated metal pipe centerline center to center bearing bridge balance point bench mark back approach amendment ahead average daily traffic asphalt concrete pavement abutment expansion joint excavation edge of water equivalent single axle load edge of road equation edge of travel way edge of shoulder edge of pavement embankment elevation elevation with number superelevation rate east flg.
fin.
flange finish exp. jt.
exc.
EW
ESAL
ER
EQ or eq.
EOT
EOS
EOP
emb.
elev.
elev.
e
E θs Ø ∆c spiral central angle diameter curve central angle total central angle ftg.
galv.
ga.
HW
hex.
hdwl.
ID
jt.
footing galvanized gage (gauge) high water hexagon headwall inside diameter joint lat.
lam.
L latitude lamination length of curve
LW
lt. or LT Ls
LPSM
long.
LOD
low water left length of spiral lump sum longitudinal Limits of Disturbance
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Section Line4
Section Corner (Found, Projected)4
Section Line16
Section Corner (Found, Projected)16
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Railroad
Trail
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir; Marshland
Spring or Seep
Treeline; Individual Trees, Pine
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Control Point (Terrestrial and GPS); Jump Hub
Sheet 1 of 2
:1
A
M a rc h
S H
E E
T
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_ D e v \C
A D
D \N
P D
E W
A
,2
\d g n \A
-A
N P
D
E W
A
(6
(2 s y m
.d g n
SYMBOLS AND ABBREVIATIONS
PROJECT
A02
N
AREA PATTERN
Barricade Type 3
Filter Bag
OHWM Ordinary High Water Mark
FB
HLSD Headlight Sight Distance
InfiniteINF
PADEP
Environmental Protection
Pennsylvania Department of
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:
U.S. DEPARTMENT OF TRANSPORTATION DELAWARE WATER GAP NATIONAL RECREATION AREA
Fiber Roll or Wattle
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Concrete Barrier
Slope Stake Limits
Delineators
Signs (single, double post; portable)
Transition
Toe of Fill
Top of Cut
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Pipe Culvert with Drop Inlet
Box Culvert
Underground Utilities
Overhead/Above Ground Utilities
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
EXISTING PROPOSED
DI
Pavement Removal / Roadway Obliteration
Full Depth Pavement
Sidewalk Asphalt/Concrete
Mill and Overlay
Overlay
Diversion Berm
Drainage Divide
Check Dam
Limits of Disturbance
Temporary Diversion Berm
Riprap
Sheet 2 of 2
:0
M a r c h
S
H E
E
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_ D e v
\C A
D D
\N P
D E
W A
,2
\d g n
\A
-A
N
P
D E
W A
(6
(2 s y m .d g n
SYMBOLS AND ABBREVIATIONS
PROJECT
A03
NO SCALE
N
NP DEWA 10(6), 218(2)
Dingmans Falls Access Bridge #1
Vancampens Glen Bridge
U.S. DEPARTMENT OF TRANSPORTATION
DELAWARE WATER GAP NATIONAL RECREATION AREA
:1
M a r c h
U n ti tl e d
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_ D e v
\C A
D D
\N P
D E
W A
,2
\d g n
\A
N P
D
E W
A
(6
(2
L o c .d g n
LOCATION MAP
PROJECT
A04
DINGMANS CREEK
DINGMANS FALLS RD
DINGMANS FALLS RD
D
IN
G M
A N S
FA
LLS
R
D
AZ 264.66
A Z
.5
°25.46'
.8
PP
.1
A Z
.4
PK
20.82'
AZ 77
.47°
AZ 103.97°
24.8 5'
AZ
.49
PK
AZ 96.45°
35.72'
7.5 3'
#GPU78935-70192
MET ED
PP
MAPLE
3"Ø
31.6'
W/TACK
AZ 118.34°
2397.9'
.0
A Z
.5
AZ 296.65°
<-To CP 5002
NAIL NTS NTS NTS
NTSNTSNTS
PK
55.3 8'
AZ 25
7.79
PP#
B1017-SPSK660345
SPEED
LIMIT
.7
A Z .6
AZ 2
54.
61° 69.
37'
PP#78896-7018
.1
A Z
.1
PK
142.16'AZ 113.85°
PK
N
N O
R T
H
N
N O
R T
H
N N
O R
T H
N
N O
R T
H
N N
O R
T H
N
N O
R T
H
D
IN
G M
A N
S F
A L L S R
D
Control Points References
A Z
.1
PP
.1
.0
.5
A Z
.4
A Z
.8
2397.9'
AZ 296.65°
To CP 5002->
SPEED
LIMIT
NATIONAL
PARK
SERVICE
Delaware Watergap
National Recreation Area
Dingmans Falls
Visitor Center
A Z
.2
.6
W/TACK
W/TACK
A Z
.2
.2
PP
43.51'
A Z 309.17°
42.99'
AZ 267.33°
PK469.1582757313.847398719.9145010
PK465.4812757443.823398662.4395009
PK458.8082757657.714398657.4315008
PK449.0932757773.162398648.6945007
PK449.2882757849.838398607.7005006
TBAR;W/TACK456.7812758074.062398359.4315003
TBAR;W/TACK456.1482758121.710398208.7475002
TYPEELEV.EASTINGNORTHINGNAME
Geoid Model : GEIOD12B (Conus)
Vert. Datum : NAVD 1988
Hor. Datum : NAD 1983 (Conus)
Zone : Pennsylvania North 3701
Coordinate System : US State Plane 1983
Coordinate System
NPS ROUTE 218 | DINGMANS FALLS ACCESS BRIDGE #1
:1
M a r c h
S u r v e y
I n f o r m a ti o n
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_
D e v \C
A D
D \N
P D
E W
A
,2
\d g n \A
-A
N
P D
E W
A (6
(2
S u r.
d g n
SURVEY INFORMATION
PROJECT
A05
NP DEWA 10(6), 218(2)
Azimuth shown is based on north axis at clockwise rotation.
NOTE:
Z
.9
BLACKGUM
11"Ø
AZ
6.6 7°7.5
4'
UKN
18"Ø
AZ
.5 8°
UKN
9"Ø
38.82'AZ 288.16°
TBAR
.6 1'
BEECH
20"Ø
P
NO
PARKING
.2
SYCAMORE
5"Ø TWIN
HACKBERRY
16"Ø
AZ 288.68°
27.48' A Z
.9
TBAR
NTS NTS NTS
NTSNTSNTS
A Z
.9
.8
AZ
.5 8°
.6 1'
TBAR
<-T o C
P 45
To C P 50
1->
AZ 7
5.4
1°
AZ 7
5.4
1°
.24
.24
4.
4.
A Z 2.
-T o C P x .4
'R
C P
AZ 2
52.
03° 43.
26'
4.
A Z 2.
.4
A Z
.8
NAIL
AZ 290.55°
29.79'
PK
AZ 6
9.6
8°37 .91
.0
A Z
.1
A Z
.7
.8
.6
'R
C P
.3 'R x .5 'S
AZ 2
.06
°54 .94
OM
A Z
.8
.9
NAIL
Project Control Points
TBAR362.535353998.901810664.0424503
PK374.482354094.849810790.1524502
TBAR368.619353855.914810683.8524501
TBAR369.099352931.247810334.0074500
NAIL374.335353637.924810517.923501
NAIL388.655354339.896810833.560500
TYPEELEV.EASTINGNORTHINGNAME
Project : DEWA10(6)
Geoid Model : GEIOD012B (Conus)
Vert. Datum : NAVD 1988 (Conus)
Hor. Datum : NAD 1983 (Conus)
Zone : New Jersey 2900
Coordinate System : US State Plane 1983
Project Coordinate System
Lot: 1 and 2
Block: 1402
Township: Hardwich Twp
Updated 10/14/2020
NPS ROUTE 10 | VANCAMPENS GLEN BRIDGE
:4
J u n e
S u r v e y
I n f o r m a ti o
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_
D e v \C
A D
D \N
P D
E W
A
,2
\d g n \A
-A
N
P D
E W
A (6
(2
S u r.
d g n
SURVEY INFORMATION
PROJECT
A06
NP DEWA 10(6), 218(2)
Azimuth shown is based on north axis at clockwise rotation.
:1
M a r c h
S u r v e y
I n f o r m a ti o
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_ D e v
\C A
D D
\N P
D E
W A
,2
\d g n
\A
N P
D
E W
A
(6
(2
H o ri z o n ta l_ R e p o rt
.d g n
HORIZONTAL ALIGNMENT REPORT
PROJECT
A07
10'
Lane
10'
Lane
CL
e
Limits of construction
Tack coat see plans
Varies, 0' to 3'
Shoulder Shoulder e plans see
Varies, 1V:
2H or Fl att er
0' to 2'
(Type IV roughness, PG 58-28)
-inch NMSA, <0.3 million ESAL8
1.5-inch Asphalt concrete pavement, gyratory mix, Aggregate base grading C or D, 6-inch depth
Profile grade Existing ground (typ.)
DINGMANS FALLS ROAD (NPS ROUTE 218)
DINGMANS FALLS ACCESS BRIDGE #1
ROADWAY RECONSTRUCTION AT BRIDGE APPROACHES
See Details ET 617-68A, E617-A, E617-B, E617-C, and E617-D.
Merritt Parkway guiderail, Removal of guardrail. Install guardrail system SBTB, 101+96 to 102+25
100+26 to 100+96
-inch NMSA, <0.3 million ESAL (PG 58-28)4
3.5-inch Asphalt concrete pavement, gyratory mix, Aggregate-topsoil course, 4-inch depth (typ.)
Roadway excavation
100+40 and 100+82. See R sheets.
2. Place the retaining wall between stations
1. See profile sheets for superelevation, e.
NOTES:
Existing asphalt pavement, depth varies
Roadway excavation
2' guardrail offset
2' Minimum guardrail offset
See plans for
See Note 2.
Place retaining wall.
14.0' to 14.8'
2% geotextile, Class 2, Type E
Separation-stabilization
1:4
.2 m in
Embankment construction (typ.)
approximately 437'
Elevation =
Mark (OHWM), Ordinary High Water
Top of bank
3.5' Maximum
Asphalt pavement removal
Existing aggregate base, depth varies product, Type 2.D, and establish turf
Place topsoil, rolled erosion control and establish turf control product, Type 2.D, Place topsoil, rolled erosion product, Type 2.D, and establish turf
Place topsoil, rolled erosion control
:4
J u n e
B
S h e
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_ D e v
\C A
D D
\N P
D E
W A
,2
\d g n
\B
B
N P
D
E W
A
(6
(2 ty p .d g n
TYPICAL SECTION
PROJECT
B01
Match existing
2'± 2'±
CL
Shoulder Shoulder
Remove and reset, guardrail (typ.)
Existing ground (typ.)
OLD MINE ROAD (NPS ROUTE 10)
VANCAMPENS GLEN BRIDGE
ROADWAY RESURFACING AT BRIDGE APPROACHES
Match existing
± 9.5' to 10'
Lane
± 9.5' to 10'
Lane
Existing aggregate base, depth varies
Existing asphalt pavement, depth varies
Tack coat
Limits of construction profile grade
Match existing
Lot: 1 and 2
Block: 1402
Township: Hardwich Twp
Updated 10/14/2020
(Type IV roughness, PG 58-28)
-inch NMSA, <0.3 million ESAL8
1.5-inch Asphalt concrete pavement, gyratory mix, -inch NMSA, wedge and leveling course (PG 58-28)8
1-inch Asphalt Concrete Pavement, Gyratory Mix, Tack coat
1.5-inch Asphalt pavement milling
:1
M a r c h
T y p ic a l
S e c ti o
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_ D e v
\C A
D D
\N P
D E
W A
,2
\d g n
\B
B
N P
D
E W
A
(6
(2 ty p .d g n
TYPICAL SECTION
PROJECT
B02
Sheet 1 of 4
(NPS ROUTE 218 | DINGMANS FALLS ACCESS BRIDGE #1)
SCHEDULE A
:4
J u n e
T a b u la ti o n o f Q u a n ti ti e s
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_
D e v \C
A D
D \N
P D
E W
A
,2
\d g n \C
-C
N
P D
E W
A (6
(2
Q u a n ti ty .d g n
TABULATION OF QUANTITIES
PROJECT
C01
Sheet 2 of 4
(NPS ROUTE 218 | DINGMANS FALLS ACCESS BRIDGE #1)
SCHEDULE A
:4
J u n e
T a b u la ti o n o f Q u a n ti te
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_ D e v
\C A
D D
\N P
D E
W A
,2
\d g n
\C
-C
N
P
D E
W A
(6
(2
Q u a n ti ty
.d g n
TABULATION OF QUANTITIES
PROJECT
C02
Sheet 3 of 4
(NPS ROUTE 10 | VANCAMPENS GLEN BRIDGE)
SCHEDULE B
:4
J u n e
T a b u la ti o n o f Q u a n ti ti e
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_
D e v \C
A D
D \N
P D
E W
A
,2
\d g n \C
-C
N
P D
E W
A (6
(2
Q u a n ti ty .d g n
TABULATION OF QUANTITIES
PROJECT
C03
Sheet 4 of 4
(NPS ROUTE 10 | VANCAMPENS GLEN BRIDGE)
SCHEDULE B
:4
J u n e
T a b u la ti o n o f Q u a n ti te
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_
D e v \C
A D
D \N
P D
E W
A
,2
\d g n \C
-C
N
P D
E W
A (6
(2
Q u a n ti ty .d g n
TABULATION OF QUANTITIES
PROJECT
C04
Sheet 1 of 9
:4
J u n e
S u m m e r ie s a n d S c h e d u le
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_
D e v \C
A D
D \N
P D
E W
A
,2
\d g n \C
-C
N
P D
E W
A (6
(2
Q u a n ti ty .d g n
SUMMARIES AND SCHEDULES
PROJECT
C05
Sheet 2 of 9
:5
J u n e
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_
D e v \C
A D
D \N
P D
E W
A
,2
\d g n \C
-C
N
P D
E W
A (6
(2
Q u a n ti ty .d g n
SUMMARIES AND SCHEDULES
PROJECT
C06
Sheet 3 of 9
:5
J u n e
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_
D e v \C
A D
D \N
P D
E W
A
,2
\d g n \C
-C
N
P D
E W
A (6
(2
Q u a n ti ty .d g n
SUMMARIES AND SCHEDULES
PROJECT
C07
Sheet 4 of 9
:5
J u n e
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_
D e v \C
A D
D \N
P D
E W
A
,2
\d g n \C
-C
N
P D
E W
A (6
(2
Q u a n ti ty .d g n
SUMMARIES AND SCHEDULES
PROJECT
C08
Sheet 5 of 9
:5
J u n e
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_
D e v \C
A D
D \N
P D
E W
A
,2
\d g n \C
-C
N
P D
E W
A (6
(2
Q u a n ti ty .d g n
SUMMARIES AND SCHEDULES
PROJECT
C09
Sheet 6 of 9
:5
J u n e
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_
D e v \C
A D
D \N
P D
E W
A
,2
\d g n \C
-C
N
P D
E W
A (6
(2
Q u a n ti ty .d g n
SUMMARIES AND SCHEDULES
PROJECT
C10
Sheet 7 of 9
:5
J u n e
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_
D e v \C
A D
D \N
P D
E W
A
,2
\d g n \C
-C
N
P D
E W
A (6
(2
Q u a n ti ty .d g n
SUMMARIES AND SCHEDULES
PROJECT
C11
Sheet 8 of 9
:5
J u n e
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_
D e v \C
A D
D \N
P D
E W
A
,2
\d g n \C
-C
N
P D
E W
A (6
(2
Q u a n ti ty .d g n
SUMMARIES AND SCHEDULES
PROJECT
C12
Sheet 9 of 9
:4
J u n e
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_ D e v
\C A
D D
\N P
D E
W A
,2
\d g n
\C
-C
N
P
D E
W A
(6
(2
Q u a n ti ty
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C13
S8 8°
'28
"E
S53°26'50"E
S44°23'14"E
.9
.8
.0
P O
B
.2
P O
E
PK
PK
PK
N
SCALE IN FEET
0 25 50
U.S. DEPARTMENT OF TRANSPORTATION DELAWARE WATER GAP NATIONAL RECREATION AREA
:5 u ly
D
S h e
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_
D e v \C
A D
D \N
P D
E W
A
,2
\d g n \D
-D
N
P D
E W
A (6
(2
P
P
D in g m a n s .d g n
PLAN
PROJECT
D01
NP DEWA 10(6), 218(2)
Proposed EOP (typ.)
40 lnft guardrail, existing
Remove
Reconstruct roadway
Centerline
100+26.00
N=398663.8420
E=2757710.5420
Proposed shoulder (typ.) 101+14.17
Begin bridge
101+08, 12' left
100+90, 12' left to
SBT system, 20 lnft, Install structure transition railing, 100+90, 12' left, 100+73, 15' left to
Merritt Parkway guiderail, 20lnft, Install guardrail system, SBTB, Remove existing guardrail, 40 lnft, 14' left
100+73, 12' left to 100+80, Transition top of fill slope
Begin 2' shoulder width, End shoulder tapering, 101+79.17
End bridge sheets.
bridge, see R Replace existing
See Note 3.
class 3.
method A, Place riprap, 100+60, 12' right
100+18, 11' right, to
Merritt Parkway guiderail, Install guardrail system SBTB, 40 lnft, Remove existing guardrail, 60 lnft, See R sheets.
100+40.59, 14.09' offset
Begin retaining wall, 102+36, 16', right
102+27, 14', right to
102+07, 12' right to
Merritt Parkway guiderail, 40lnft, Install guardrail system SBTB, 102+07, 12' right, 101+85, 13' right to
SBT system, 20 lnft, Install structure transition railing, Remove existing guardrail, 40 lnft, Reconstruct roadway
102+66, 23', right
102+36, 16', right to
Type FAT-Merritt Parkway guiderail (Type I), Install guardrail terminal section, 102+91, 23' left
102+62, 16' left, to
Type FAT-Merritt Parkway guiderail (Type I), Install guardrail terminal section, 100+82.00
Begin 3' shoulder width
102+10 and 102+20 width to 0' between transition shoulder
101+86 and 102+10, width to 2' between transition shoulder
101+86, End 3' shoulder width, 102+62, 16' left
102+52, 14' left to
102+22, 12' left to
Merritt Parkway guiderail, 40lnft, Install guardrail system SBTB, 102+22, 12ft left, 102+02, 12ft left, to
SBT system, 20 lnft, Install structure transition railing, Remove existing sign (typ.)
100+82, 13' right
100+60, 12' right to railing, SBT system, 20 lnft, Install structure transition
See R sheets.
100+81.84, 14.78 offset
End retaining wall, 100+26
Begin shoulder tapering, left, Sawcut pavement, 102+25 width, left, shoulder
End 2' pavement, Sawcut
Approach and sleeper slabs, 100+96 to 101+14, See R sheets.
100+73, 15' left
100+64, 18' left to
Type BAT-Merritt Parkway guiderail (Type II), Install guardrail terminal section, Approach and sleeper slabs, 101+79 to 101+96, See R sheets.
Top of fill slope
Edge of shoulder e = ___
L = 60.84'
T = 31.40'
R = 100.00'
Δ = 34°51'38" (RT)
PI 100+81.37
e = ___ L = 18.98' T = 9.51' R = 120.00'
Δ = 09°03'37" (RT)
PI 101+91.46
CURVE DATA:
BEGIN WORK
102+25.00 N=398571.4881 E=2757879.3306 limit (typ.)
Slope stake
END WORK
D in gm an s
Cr ee k
1. Do not disturb existing MetEd (First Energy) pole and overhead power lines adjacent to the existing and proposed bridge. Contractor must conform to OSHA's overhead clearance requirements when working adjacent to overhead power lines.
2. Remove stream debris within the limits of disturbance.
3. See R sheets for riprap placement.
4. The limits of guardrail systems may be changed to fit field conditions as approved by the CO.
5. See the Standards and Details for more information.
NOTES:
DETAILS REFERENCE:
Detail E251-A: Riprap Slope Protection Detail ET 617-68A: Steel-Backed Timber Guardrail Connection to Tubular Steel-Backed Timber Bridge Rail Detail E617-A: Steel-Backed Timber Guardrail Merritt Parkway Guiderail Detail E617-B: Steel-Backed Timber Guardrail Merritt Parkway Guiderail Detail E617-C: Steel-Backed Timber Guardrail Merritt Parkway Guiderail Detail E617-D: Steel-Backed Timber Guardrail Merritt Parkway Guiderail Anchors
Existing ground
Proposed profile grade
See R sheets
101+14.17 to 101+79.17, Replace bridge, BEGIN WORK
END WORK
100+26.00
Match existing line and grade
102+25.00
Match existing line and grade
Transition e = 2.00%
Transition
100+90 102+05
Transition e = -2.00% e = -2.00%
Transition
See R sheets.
Retaining wall.
exc. = 110 cuyd emb. = 840 cuyd
Match existing e=-5.00%
Match existing e=2.45%
Match existing e=1.00%
Match existing e=-2.50% e = 2.00%
Superelevation Transition Rates
Existing bottom of creek
100+99100+26 102+25
98+00 99+00 100+00 101+00 102+00
420 420
430 430
440 440
450 450
460 460
470 470
480 480
490 490
-8.708%
-1.034% +0.323%
E L
.2
V P
I
E L
.8
V P
I
70' VC
K = 9
HLSD = 79.16'
31' VC
K = 23
HLSD = INF'
.5
E
L
RTRTRT
LT LT
E L
.9
:5
J u n e
P r o f il e
S h e
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_
D e v \C
A D
D \N
P D
E W
A
,2
\d g n \D
-D
N
P D
E W
A (6
(2
P
P
D in g m a n s .d g n
PROFILE
PROJECT
D02
NP DEWA 10(6), 218(2)
overhead power lines.
requirements when working adjacent to must conform to OSHA's overhead clearance the existing and proposed bridge. Contractor pole and overhead power lines adjacent to
Do not disturb existing MetEd (First Energy)
NAIL
TBAR
TBAR
PK
375375
NAIL
OLD MINE RD
H A
M
IL
T O
N R
D
N
BEGIN WORK
END WORK
class 7, 44 tons
Place riprap, method A, class 4, 20 tons
Placed riprap, method A, Remove and reset sign
Do not disturb existing sign
Township: Hardwick Twp
Block: 1402
Lot: 1 and 2
Updated 10/14/2020
Match existing EOP
Resurface pavement, 102 sqyd.
Begin bridge
V a n c a m p e n s B ro o kRemove and reset guardrail, 60 lnft
Remove and reset guardrail, 80 lnft
Remove and reset guardrail, 60 lnftclass 4, 29 tons
Place riprap, method A, See Note 5.
(3-inch to 9-inch dia.)
Removal, individual tree, 4
Match existing EOP
140 sqyd.
Resurface pavement, End bridge
See Note 5.
(3-inch to 9-inch dia.)
Removal, individual tree, 5
1. The limits of riprap and resetting of guardrail may be changed to fit field conditions as approved by the CO.
2. Do not stockpile materials, vehicles, or equipment on
Hamilton Road driveway. Maintain driveway access at all times.
3. Do not disturb existing Jersey Central Power & Light
Co (First Energy) and Service Electric Cable TV poles, overhead power, or telephone lines adjacent to the existing bridge. Contractor must conform to OSHA's overhead clearance requirements when working adjacent to overhead power lines.
4. Remove stream debris within the limits of disturbance.
5. Remove individual trees as approved by the CO.
NOTES:
DETAIL REFERENCE:
Detail E251-A: Riprap Slope Protection
Repair bridge. See R sheets.
See Note 2
N=810740.9236
E=354010.0519
N=810675.7113
E=353874.9642
Sawcut pavement
Sawcut pavement
62'
48'
:4
M a r c h
D
S h e
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_ D e v
\C A
D D
\N P
D E
W A
,2
\d g n
\D
N P
D
E W
A
(6
(2
D
E S
V a n c a m p e n s .d g n
PLAN
PROJECT
D03
PK
PK
PK
N
U.S. DEPARTMENT OF TRANSPORTATION DELAWARE WATER GAP NATIONAL RECREATION AREA
:0 u ly
D
S h e
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_ D e v
\C A
D D
\N P
D E
W A
,2
\d g n
\D
N P
D
E W
A
(6
(2
T
R P
D in g m a n s .d g n
TREE REMOVAL PLAN
PROJECT
D04
NP DEWA 10(6), 218(2)
46' right
101+31, Remove 12" Beech, 43' right
101+27, Remove 8" Yellow Birch, 38' right
101+31, Remove 12" Yellow Birch, 33' right
101+39, Remove 12" Yellow Birch, 39' right
101+47, Remove 10" Hemlock, 29' right
101+76, Remove 33" Hemlock, 32' left
101+90, Remove 12" Birch, 31' left
101+91, Remove 7" Birch, 33' left
101+94, Remove 10" Birch, D in g m an s
C re ek stage or phase have been installed and are functioning as described in the Erosion and Sediment Control Plan.
erosion and sediment control best management practices specified in the best management practices sequence for that
General site clearing, grubbing, and topsoil removal may not commence in any stage or phase of the project until the
Limit clearing, grubbing, and topsoil removal to those areas described in each stage of the construction sequence.
Complete each phase of the sequence of construction before starting the next one.
construction.
Plan preparer, and the PADEP. All earth disturbance activities shall proceed in accordance with the sequence of on-site preconstruction meeting and invite the National Park Service, Contractor, the Erosion and Sediment Control
At least 7 days prior to starting any earth disturbance activities, including clearing and grubbing, notify the CO to hold an revised erosion and sedimentation pollution control plan to the PADEP Northeast Regional Office for Review and Approval.
Coordinate any and all proposed changes to the approved erosion and sedimentation control plan with the CO. Submit a and Bridges on Federal Highway Projects, FP-14, and the Special Contract Requirements.
The soil erosion control measures are also defined and outlined in the Standard Specifications for Construction of Roads sedimentation of rivers, streams, and impoundments such as lakes, reservoirs, bays, and coastal waters.
The work consists of applying measures throughout the life of the project to control erosion and to minimize the
The Erosion and Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment.
General Guidelines and the National Response Center at 1-800-424-8802.
40 CFR 112. Report spills large enough to discharge to surface waters to the Park Liaison, the Chief of Maintenance, Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the requirements under the on-site dumpsters. Dispose of material according to Federal, State, and local regulations.
clearly marked containers away from other non-waste materials. Do not dispose of hazardous waste materials into activities in a covered area to avoid contact with storm water. Store all hazardous waste materials in appropriate and generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and battery fluid. If feasible, conduct these
Hazardous waste will not be generated from normal construction activities. Equipment fueling and maintenance could
Collect and store all waste in dumpsters, or in metal or plastic drums, as appropriate.
Solid waste generated from the project will consist of construction debris, garbage, and empty containers.
contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.
Inspect and maintain on a regular basis, all mechanized equipment used in or near surface water to prevent equipment-related compounds; Soaps, solvents used for vehicle washing; Waste, garbage, sanitary waste.
Wash-water from concrete, paint, curing compounds, and other construction materials; Fuels, oils, The following discharges are prohibited:
Prohibited Discharges
56 cfs for 100-year event. An additional 485 sqft of new impervious surface will be created by the reconstructed roadway.
The upstream watershed area is 615.02 acres. The rate of runoff from the project site is 48 cfs for 50-year event and
River which is classified as WWF, MF under Chapter 93. The entire project area is located within 150-foot riparian zone.
Creek that has a Chapter 93 designation of HQ-CWF. Dingmans Creek is an upstream tributary of the Middle Delaware
Dingmans Falls Access Bridge #1 work is approximately 20,084 sqft (0.46 acre), and the receiving water is Dingmans bridge superstructure and substructure. The total disturbed area for the Dingmans Falls Road (NPS Route 218) and
Soil disturbing activities include clearing and grubbing, riprap installation, roadway grading, and replacement of the and other miscellaneous bridge work.
of the existing bridge superstructure and substructure, roadway reconstruction, new guardrail and terminal installation, recreation. The Dingmans Falls Road (NPS Route 218) and Dingmans Falls Access Bridge #1 work includes the replacement
Park Service. The site is within a forested landscape. The past and present uses of the area are for conservation and
Dingman Falls Access Bridge #1 is within Delaware Water Gap National Recreation Area that is managed by the National
Project Description
Northeast Regional Office to schedule a final inspection.
activities and permanent stabilization of all disturbed areas, notify the CO to contact the PADEP control once all areas have been permanently stabilized. Upon completion of all earth disturbance use of equipment or in a manner in which causes minimal impact to stabilized areas, remove perimeter the Application Rates for Seeding at Dingmans Falls Road (NPS Route 218) seeding table. Without
Re-apply permanent turf establishment to disturbed areas where vegetation has not been established. See control. Regrade and stabilize areas where sediment control was installed and immediately stabilize.
achieved (80% continuous grass coverage with no bare soil areas greater than 6") remove the sediment
Apply permanent turf establishment to any remaining disturbed areas. Once uniform vegetative cover is
After completion of roadway construction, do the following as directed by the CO:
Phase III Final Construction / Stabilization areas.
Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging establishment to stockpiles remaining in place longer than 4 days.
Provide fiber roll around all stockpiled excavated roadway material. Immediately apply temporary turf greater than 1 workday.
and phased such that no area larger than that which can be stabilized immediately is disturbed for a period topsoil, and turf establishment immediately after final grading is achieved. Regrading should be worked
Perform minor regrading work at the streambank going upslope and install rolled erosion control product, Apply permanent turf establishment to the finished slopes according to Section 625.
remove the stream diversion best management practice.
Remove the existing right abutment, install abutment 2, and install the riprap. Once complete, Right streambank:
remove the stream diversion best management practice.
Remove the existing left abutment, install abutment 1, and install the retaining wall. Once complete, Left streambank:
bridge abutments, retaining wall, and riprap.
in disturbed areas that will remain exposed for longer than 4 days. Establish construction access to install the
Apply intermediate controls during rough grading operations. Immediately apply temporary turf establishment
Phase II Intermediate Controls of the diversion berm.
streambank. Install the diversion berm best management practice with minimal disturbance within the limits the diversion berm and restore the disturbed area at the left streambank before moving on to the right measures outside the construction limits. Do not construct two diversion berms at the same time. Remove does not leave the project site. Perimeter controls include fiber roll and a sediment trap and other specified
Prior to any clearing, grubbing, or excavation, construct perimeter controls to ensure that disturbed sediment
Phase I Establish Perimeter Controls
Sequence of Construction vegetated buffer areas and do not discharge directly into surface waters.
to operate on or access the down-slope side of the perimeter control measures. Direct storm water to construction vehicles to track sediment outside the project limits. Do not allow any construction equipment according to the procedure described in this plan, over undisturbed vegetated areas. Do not allow
No construction access will be permitted through a wetland or waterway. Pump water from any work area
Sheet 1 of 5
:5
J u n e
M
E S
C
S h e
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_ D e v
\C A
D D
\N P
D E
W A
,2
\d g n
\M
N P
D
E W
A
(6
(2
E
S C
N a rr a ti v e .d g n
NARRATIVE
EROSION AND SEDIMENT CONTROL
PROJECT
M01
Record the inspection date and summary of findings within 24 hours of completing a site inspection.
Sediment trap - Inspect the sediment trap at a minimum weekly and after each runoff event.
Repair as needed after rainfall events or as directed by the CO.
Temporary Diversion - while in use, inspect and maintain the temporary diversion method used daily.
Stabilized construction exit - maintain in a condition which will prevent tracking or flow of mud onto public roads.
they are securely in the ground.
Replacement of matting may be necessary if damaged by equipment. Check staples and stakes to make sure
Rolled erosion control product - inspection includes checking for damage and erosion beneath the matting.
Dispose of the sediment legally off-site.
Fiber roll - remove sediment deposits from behind the fiber roll when they reach half the height of the device.
rated capacity.
and for capacity. Immediately cease pumping and replace damaged filter bags, or bags that have reached their
Filter bags - check the filter bags daily during dewatering operations for punctures, tears, or other damage, are required.
perform as expected, replacement best management practices, or modifications of those installed renetting must be performed immediately. If the erosion and sediment best management practices fail to remedial maintenance work, including clean out, repair, replacement, regrading, reseeding, remulching, and during wet weather. Repair or replace any damaged measures by the end of the day. All preventative and erosion control measures once every 7 days and within 24 hours after a rain of 0.25 inches or more, and daily to Section 157, the details shown in the plans, and the individual permitting requirements. Check and maintain
Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices according
Maintenance and Inspection Procedures
Sheet 2 of 5
:5
J u n e
M
E S
C
S h e
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_ D e v
\C A
D D
\N P
D E
W A
,2
\d g n
\M
N P
D
E W
A
(6
(2
E
S C
N a rr a ti v e .d g n
NARRATIVE
EROSION AND SEDIMENT CONTROL
PROJECT
M02
Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.
Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control measures.
Do not allow construction vehicles to track sediment outside the project limits.
No construction access will be permitted through a wetland or waterway.
Complete each phase of the sequence of construction before starting the next one.
All earth disturbance activities shall proceed in accordance with the sequence of construction.
revised erosion and sedimentation pollution control plan to the PADEP Northeast Regional Office for Review and Approval.
Coordinate any and all proposed changes to the approved erosion and sedimentation control plan with the CO. Submit a for Construction of Roads and Bridges on Federal Highway Projects, FP-14, and the Special Contract Requirements.
The measures consist of soil erosion control measures which are also defined and outlined in the Standard Specifications sedimentation of rivers, streams, and impoundments such as lakes, reservoirs, bays, and coastal waters.
The work consists of applying measures throughout the life of the project to control erosion and to minimize the
The Erosion and Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment.
General Guidelines and the National Response Center at 1-800-424-8802.
40 CFR 112. Report spills large enough to discharge to surface waters to the Park Liaison, the Chief of Maintenance, Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the requirements under the on-site dumpsters. Dispose of material according to Federal, State, and local regulations.
clearly marked containers away from other non-waste materials. Do not dispose of hazardous waste materials into activities in a covered area to avoid contact with storm water. Store all hazardous waste materials in appropriate and generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and battery fluid. If feasible, conduct these
Hazardous waste will not be generated from normal construction activities. Equipment fueling and maintenance could
Collect and store all waste in dumpsters, or in metal or plastic drums, as appropriate.
Solid waste generated from the project will consist of construction debris, garbage, and empty containers.
contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.
Inspect and maintain on a regular basis, all mechanized equipment used in or near surface water to prevent equipment-related compounds; Soaps, solvents used for vehicle washing; Waste, garbage, sanitary waste.
Wash-water from concrete, paint, curing compounds, and other construction materials; Fuels, oils, The following discharges are prohibited:
Prohibited Discharges the reconstructed roadway.
10,790 sqft (0.25 acre), and the receiving water is Vancampens Brook. No new impervious surface will be created by
The total disturbed area for the Old Mine Road (NPS Route 10) and Vancampens Glen Bridge work is approximately pavement mill and overlay, and other miscellaneous bridge work.
National Recreation Area, managed by the National Park Service. The work includes riprap placement, asphalt
The Old Mine Road (NPS Route 10) and Vancampens Glen Bridge work are located within the Delaware Water Gap
Project Description
Record the inspection date and summary of findings within 24 hours of completing a site inspection.
Repair as needed after rainfall events or as directed by the CO.
Temporary Diversion - while in use, inspect and maintain the temporary diversion method used daily.
Stabilized construction exit - maintain in a condition which will prevent tracking or flow of mud onto public roads.
they are securely in the ground.
Replacement of matting may be necessary if damaged by equipment. Check staples and stakes to make sure
Rolled erosion control product - inspection includes checking for damage and erosion beneath the matting.
Dispose of the sediment legally off-site.
Fiber roll - remove sediment deposits from behind the fiber roll when they reach half the height of the device.
rated capacity.
and for capacity. Immediately cease pumping and replace damaged filter bags, or bags that have reached their
Filter bags - check the filter bags daily during dewatering operations for punctures, tears, or other damage, during wet weather. Repair or replace any damaged measures by the end of the day.
erosion control measures once every 7 days and within 24 hours after a rain of 0.25 inches or more, and daily to Section 157, the details shown in the plans, and the individual permitting requirements. Check and maintain
Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices according
Maintenance and Inspection Procedures
Remove all other perimeter controls when 70% of revegetation has occured or as directed by the CO.
Remove fiber roll only after all upslope areas are stabilized and vegetation is well established.
Remove all devices used for dewatering.
Inspect, clean, and repair all culvert outlet protection, riprap basins, and stabilized channels.
where vegetation has not established. See Table 1.
Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas
Finish grading, place riprap, and apply permanent turf establishment to any remaining disturbed areas.
After completion of roadway construction, do the following as directed by the CO:
Phase III Final Construction / Stabilization areas.
Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging establishment to stockpiles remaining in place longer than 4 days.
Provide fiber roll around all stockpiled excavated roadway material. Immediately apply temporary turf
Install inlet protection prior to diverting water through inlets.
runoff.
At the end of each day’s grading operations, shape earthwork to minimize and control erosion from storm finished slopes according to Section 625.
in disturbed areas that will remain exposed for longer than 4 days. Apply permanent turf establishment to the Apply intermediate controls during rough grading operations. Immediately apply temporary turf establishment
Phase II Intermediate Controls construction limits.
does not leave the project site. Perimeter controls include fiber roll and other specified measures outside the Prior to any clearing, grubbing, or excavation, construct perimeter controls to ensure that disturbed sediment
Phase I Establish Perimeter Controls
Sequence of Construction
Sheet 3 of 5
:5
J u n e
M
E
S C
S h e
P
R O
J E
C T
S \d e w a \1
(6
(2
P ro j_
D e v \C
A D
D \N
P D
E W
A
,2
\d g n \M
N
P D
E W
A (6
(2
E
S C
N a rr a ti v e .d g n
NARRATIVE
EROSION AND SEDIMENT CONTROL
PROJECT
M03
20Total Seed
0.02Solidago odoraLicorice Scented Goldenrod
0.02Solidago nemoralisGray Goldenrod
0.02Solidago junceaEarly Goldenrod
0.02Penstemon hirsutusHairy Beardtongue
0.02Aster pilosusHeath Aster
0.04Solidago bicolorWhite Goldenrod
0.04Penstemon laevigatusAppalachian Beardtongue
0.04Aster prenanthoidesZigzag Aster
0.04Aquilegia canadensisEastern Columbine
0.06Oenothera fruticose var. fruticosaSundrops
0.06Asclepias syriacaCommon Milkweed
0.08Monarda fistulosaWild Bergamot
0.08Aster macrophyllusBigleaf Aster
0.08Aster lateriflorusCalico Aster
0.08Asclepias tuberosaButterfly Milkweed
0.10Geum canadenseWhite Avens
0.10Baptisia australisBlue False Indigo
0.12Liatris spicataMarsh Blazing Star
0.20Penstemon digitalisTall White Beardtongue
0.24Pycnanthemum tenuifoliumNarrowleaf Mountainmint
0.40Heliopsis helianthoidesOxeye Sunflower
0.60Rudbeckia hirtaBlackeyed Susan
0.70Chamaecrista fasciculataPartridge Pea
1.30Elymus hystrixBottlebrush Grass
1.80Echinacea purpureaPurple Coneflower
3.36Elymus virginicusVirginia Wild Rye
10.38Schizachyrium scopariumLittle Bluestem
Acre
Pounds per Botanical NameCommon Name
Application Rates for Seeding at Dingmans Falls Road (NPS Route 218)
Phase III Final Construction / Stabilization (Continued)
Sequence of Construction
Sheet 4 of 5
:5
J u n e
M
E S
C N a r r a ti v e
S h e
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_
D e v \C
A D
D \N
P D
E W
A
,2
\d g n \M
-M
N
P D
E W
A (6
(2
E
S C
N a rr a ti v e .d g n
NARRATIVE
EROSION AND SEDIMENT CONTROL
PROJECT
M04
Sheet 5 of 5
See Detail Sheets for Additional Soil and Sediment Control Details.13.
Control in New Jersey, February 2014.
Soil Erosion and Sediment Control measures shall be in accordance with Standards for Soil Erosion and Sediment12.
Tracking pad to be kept clean and repaired as necessary. 11.
Dust to be controlled with water, calcium chloride or other method approved by the Soil Conservation District. 10.
are installed.
No building permits will be released until all soil erosion and sediment control measures as showed on approved plans9.
Sediment tracked onto public right-of-ways shall be swept at the end of each working day. 8.
Compliance is needed and soil erosion and sediment control measures for permanent stabilization are not completed.
County Soil Conservation District during the non growing season (November 15 - April 15) if a Certificate of
A cash bond of not less than $2,500. (Per disturbed acre or part thereof, or a lot) will be posted with the Warren7.
ultimate responsibility of the owner.
Final stabilization of all land disturbances associated with underground utilities, irrespective of phasing, is the 6.
Certificate of Compliance release.
District issues a Certificate of Compliance. Two weeks notice must be given to the District to schedule inspection for
All site work relative to approved plans and all work around individual lots in subdivisions will be completed before the provisions of the certified plan for soil erosion and sediment control have been complied with for permanent measures.
In that N.J.S.A. 4-24-39 et seq requires that no Certificates of Occupancy be issued by the municipality before the 5.
A 48 hour Start of Land Disturbance Notification shall be given. 4.
Any changes of approved plans shall require an additional submittal to the District including appropriate re-review fees.3.
District in the event of any unforeseen problems incurred during construction.
appropriate statutes. Additional erosion and sediment control measures may be required as deemed necessary by the
Failure of the aforementioned plan shall not relieve the applicant of any of its responsibilities relevant to the 2.
preconstruction meetings.
of the owner/applicant to schedule one before any land disturbance. Two weeks notice must be given for scheduling utility representatives. If the township engineer does not schedule a preconstruction meeting, it is the responsibility
The District shall be represented at the project preconstruction meeting with the township engineer, contractors, and .1
Warren County Soil Conservation District Erosion and Sediment Control General Notes
Drained
Moderately Well 0 to 3Scio Silt LoamWarren
Bridge)
(Vancampens Brook
Old Mine Road South
Characteristics Slopes
Percent Soil TypeCountySite Name
Possible Soil Types Found on Each Site
Brook Creek
Vancampens 293710Warren
Bridge)
(Vancampens Brook
Old Mine Road South
Waters
Receiving
(Sqft)
Disturbance
Vegetation
(Sqft)
Disturbance
Soil
CountySite Name
Soil and Vegetation Disturbance per Site
:5
J u n e
M
E S
C N a r r a ti v e
S h e
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_ D e v
\C A
D D
\N P
D E
W A
,2
\d g n
\M
-M
N
P
D E
W A
(6
(2
E S
C
N a rr a ti v e .d g n
NARRATIVE
EROSION AND SEDIMENT CONTROL
PROJECT
M05
F B
Proposed EOP (typ.)
N
Limits of disturbance, 7,395 sqft elev. 439.09
OHWM line, elev. 438.11
OHWM line, washout structure
On-site concrete
D in gm an s
C as directed by the CO.
Perform clearing and grubbing
Temporary diversion berm
101+79.17
End bridge
101+14.17
Begin bridge, OHWM line, elev. 437.22 as approved by the CO)
Place filter bag (at location as directed by the CO.
Perform clearing and grubbing
PHASE 1
Install fiber rolls, 40'
1. Place topsoil, turf establishment, and rolled erosion control product, Type 2.D on all disturbed areas excluding pavement and rock surfaces.
2. The limits and locations of temporary erosion and sediment control measures may be changed to fit field conditions as approved by the CO.
3. Do not construct two diversion berms at the same time. Remove the diversion berm and restore disturbed area at the current phase before moving to the next phase.
4. Place stabilized construction exit as directed by the CO. See detail E157-01.
5. Cover all disturbed area with permanent seeding as approved by the CO.
6. Pumped water filter bags should be placed in well vegetated area and not across contours.
Place compost filter sock around the water filter bag. The pumping rate should be no greater than 750 gallons per minute or half the maximum specified by the manufacturer, whichever is less.
NOTES:
elev. 433.75
OHWM line, Install fiber rolls, 87'
100+40.59
Begin retaining wall, 100+81.84
End retaining wall, Install fiber rolls, 17'
Install fiber rolls, 17'
Install sediment trap, 101+20, 30' left
Install fiber rolls, 17'
:5
J u n e
M
E S
C R o u te
S h e
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_
D e v \C
A D
D \N
P D
E W
A
,2
\d g n \M
-M
-M
N
P D
E W
A (6
(2
E
S
D in g m a n s .d g n
PLAN
EROSION AND SEDIMENT CONTROL
PROJECT
M06
NP DEWA 10(6), 218(2)
Slope stake limit (typ.)
DETAILS REFERENCE:
Detail E157-01 Stabilized Construction Exit
Detail E157-02: Wire-Backed Silt Fence
Standard 157-4: Sediment Trap
Detail E157-04: Fiber Roll
Detail E157-08A: Temporary In-Stream Diversion Berm Methods
Detail E157-10: Filter Bag
Detail E157-A: On-Site Concrete Washout Structure
Detail E629-01: Slope Stabilization With Rolled Erosion Control Product (RECP)
F B
DINGMANS FALLS RD
N
Limits of disturbance,12,689 sqft (typ.)
101+14.17
Begin bridge, End bridge, 101+79.17
PHASE 2
Temporary diversion berm as approved by the CO)
Place filter bag (at location
D in gm an s
Cr ee k class 3. See R sheets.
Place riprap, method A, Install fiber rolls, 71' as directed by the CO.
Perform clearing and grubbing
Install fiber rolls, 32'
NOTES:
1. Place topsoil, turf establishment, and rolled erosion control product, Type 2.D on all disturbed areas excluding pavement and rock surfaces.
2. The limits and locations of temporary erosion and sediment control measures may be changed to fit field conditions as approved by the CO.
3. Do not construct two diversion berms at the same time. Remove the diversion berm and restore disturbed area at the current phase before moving to the next phase.
4. Place stabilized construction exit as directed by the CO. See detail E157-01.
5. Cover all disturbed area with permanent seeding as approved by the CO.
6. Pumped water filter bags should be placed in well vegetated area and not across contours.
Place compost filter sock around the water filter bag. The pumping rate should be no greater than 750 gallons per minute or half the maximum specified by the manufacturer, whichever is less.
washout structure
On-site concrete
Install fiber rolls, 64' as directed by the CO.
Perform clearing and grubbing elev. 439.09
OHWM line, elev. 437.75
OHWM line, OHWM line, elev. 437.22 elev. 438.11
OHWM line, :0
J u n e
M
E S
C R o u te
S h e
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_
D e v \C
A D
D \N
P D
E W
A
,2
\d g n \M
-M
-M
N
P D
E W
A (6
(2
E
S
D in g m a n s .d g n
PLAN
EROSION AND SEDIMENT CONTROL
PROJECT
M07
NP DEWA 10(6), 218(2)
DETAILS REFERENCE:
Detail E157-01: Stabilized Construction Exit
Detail E157-02: Wire-Backed Silt Fence
Standard 157-4: Sediment Trap
Detail E157-04: Fiber Roll
Detail E157-08A: Temporary In-Stream Diversion Berm Methods
Detail E157-10: Filter Bag
Detail E157-A: On-Site Concrete Washout Structure
Detaii E251-A: Riprap Slope Protection
Detail E629-01: Slope Stabilization With Rolled Erosion Control Product (RECP)
OLD MINE RD
H A
M
IL
T O
N R
D
375375
OHWM line, elev. 361.38
OHWM line, elev. 357.88 elev. 357.65
OHWM line, bridge
End
Begin bridge
Placed riprap, method A, class 4, 29 tons
Placed riprap, method A, class 4, 20 tons Install fiber rolls, 51 lnft
Install fiber rolls, 20 lnft
Placed riprap, method A, class 7, 44 tons
Install fiber rolls, 45 lnft
10790 sqft (typ.)
Limits of disturbance, Detail E157-A: On-Site Concrete Washout Structure
D…
This is the start of the file's text. The full file is on GovTribe.