Amendment 0002 - NP DEWA 10(6) 218(2).pdf
PDF 2 MB Posted
- Attached to
- Delaware Water Gap National Recreation Area
- Solicitation number
- 693C73-24-B-000014
About this file
This document is Amendment 0002 to Solicitation 693C73-24-B-000014 for the Delaware Water Gap National Recreation Area, Project NP DEWA 10(6), 218(2).
The key changes made in this amendment are: 1) Revision of Plan Sheet C02 to remove the pay item for "MITIGATION, ARCHAEOLOGICAL SITE" from Schedule A; 2) Provision of revised plans sheets R12, R15, R18 and R26 to include a scale bar in the Bridge drawing; 3) Replacement of the Solicitation Bid Schedule pages B-1 through B-8 to remove the pay item for "MITIGATION, ARCHAEOLOGICAL SITE" from Schedule A; 4) Revision of the Special Contract Requirements Subsection 156.04(a) to clarify no temporary crossing will be allowed for construction; and 5) Rescheduling of the Bid Opening date to Tuesday, August 20, 2024, at 2:00 p.m. EDT.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7324B000014 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHBURN VA 20147
ATTN: Construction
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
ASHBURN VA 20147
ATTN: Acquisitions
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1408/08/20240002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/11/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
NP DEWA 10(6), 218(2)
The purpose of this Amendment is to:
1) Revise Plan Sheet C02 to update the Tabulation of Quantities to remove the following pay item from Schedule A:
A1000 64701-3000 MITIGATION, ARCHAEOLOGICAL SITE
2) Provide revised Plans Sheets R12, R15, R18 and R26 to include a scale bar in the Bridge drawing.
3) Replace the Solicitation Bid Schedule pages B-1 through B-8 to remove the following pay
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Christopher Long
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 17
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
693C7324B000014/0002 item from Schedule A:
A1000 64701-3000 MITIGATION, ARCHAEOLOGICAL SITE
4) Revise the Special Contract Requirements
(J-Pages) Subsection 156.04(a) to clarify no temporary crossing will be allowed for construction.
5) The Bid Opening date will be rescheduled to
Tuesday, August 20, 2024, at 2:00 p.m. EDT.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Amendment No. 0002
Amendment Info Page 1 of 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0002
Project NP DEWA 10(6), 218(2)
Delaware Water Gap National Recreation Area
Solicitation: 693C73-24-B-000014
The purpose of this Amendment is to:
1) Revise Plan Sheet C02 to update the Tabulation of Quantities to remove the following pay item from Schedule A:
A1000 64701-3000 MITIGATION, ARCHAEOLOGICAL SITE
2) Provide revised Plans Sheets R12, R15, R18 and R26 to include a scale bar in the Bridge drawing.
3) Replace the Solicitation Bid Schedule pages B-1 through B-8 to remove the following pay item from Schedule A:
A1000 64701-3000 MITIGATION, ARCHAEOLOGICAL SITE
4) Revise the Special Contract Requirements (J-Pages) Subsection 156.04(a) to clarify no temporary crossing will be allowed for construction.
5) The Bid Opening date will be rescheduled to Tuesday, August 20, 2024, at 2:00 p.m.
EDT.
Sheet 2 of 4
(NPS ROUTE 218 | DINGMANS FALLS ACCESS BRIDGE #1)
SCHEDULE A
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DELAWARE WATER GAP NATIONAL RECREATION AREA
:0
A
M
A u g u s t
T a b u la ti o n o f Q u a n ti te s
M
P R
O J E
C T
S \d e w a \1
(6
(2
P ro j_ D e v
\C A
D D
\N P
D E
W A
,2
\d g n
\A m e n d m e n t_
\C
-C
N P
D
E W
A
(6
(2
Q u a n ti ty
A m e n d m e n t
.d g n
TABULATION OF QUANTITIES
PROJECT
NUMBER
SHEET
C02
NPS Drwg No. 620/173739 NPS PMIS No. 222479, 222541
NP DEWA 10(6), 218(2)
Amendment 0002
R12
M
P R
O J E
C T
S \d e w a \1
(6
(2
B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \1
P
S
E \0
P R
O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
/6
/2
R
N P
D E
W A
(6
(2
W
IN
G
W A
L L
A
C
A
D R
E
IN
F O
R C
E M
E N
T .D
G N
A C
T U
A L
F
IL
E
WINGWALLS A, C, & D PLAN VIEW
WINGWALLS A, C, & D ELEVATION VIEW
SECTION A-A
SECTION B-B
"4
8 8"
#5AE6 (Typ.)
#8WE1
2 Equ. Spa.
#8WE1
#8WE1
#8WE1
#5AE6
#5FE11
3 Equ. Spa.
#8WE5 or #8WE6
#8WE5
W E a k
S p a
W
E
S p a
#8FE7 (n.f.) & #8FE8 (f.f.)
13 Spa @ 8"=8'-8"
#8WE1
20 Spa @ 8"=13'-4"*
#8WE7
6 Spa @ 8"=4'-0"*
#8WE7
2 Equ. Spa.
B B
A A
(e.f.)
#8WE7
(e.f.)
#8WE5
(e.f.)
#8WE5
(e.f.)
#8WE8a-i
(n.f.)
#8FE7
(f.f.)
#8FE8
#6FE5 (top & bott.)
(top & bott.)
#9FE1 or #9FE2a-l
(top & bott.)
#6FE4a-u or #6FEa-d
(top & bott.)
#9FE1 or #9FE2a-l
M in la p
WINGWALLS A, C, & D REINFORCEMENT
See "WINGWALLS A, C, & D" sheet for additional information.3.
Extend weepholes to daylight. 2.
elevation.
reinforcement. Maintain maximum height above footing
Adjust weephole location to avoid interference with 1.
As shown
(Typ.)
weephole
4" dia.
" = 1'-0"2
Scale
" = 1'-0"2
Scale
" = 1'-0"8
Scale
" = 1'-0"8
Scale
1 08/06/24 LTE Revised scale.
STATE PROJECT
NUMBER
SHEET
PA/NJ NP DEWA 10(6), 218(2)
NPS PMIS No. 222479 NPS Drwg. No. 620/173739
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
CP/NR
DRAWN BY
LTE LTE Carlos Pena-Marsh of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-129932
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DELAWARE WATER GAP NATIONAL RECREATION AREA
Structure No.: 4320-019P
September 2023
(Dingmans Falls Access Road, Route 218)
DINGMANS FALLS ACCESS BRIDGE #1
R15
M
P R
O J E
C T
S \d e w a \1
(6
(2
B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \1
P
S
E \0
P R
O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
/6
/2
R N
P D
E W
A
(6
(2
R
E T
A
IN
IN
G
W A
L L
L A
Y O
U T
.D G
N A
C T
U A
L F
IL
E
Wingwall B
10'-6"
3'-0" 6'-0"
Elev. 450.18
Elev. 451.89
Elev. 442.0
1'-6"
1'-0"
Retaining wallCL
Elev. 442.0
SECTION A - A
RETAINING WALL PLAN VIEW
RETAINING WALL ELEVATION VIEW
As shown
A
A
RETAINING WALL LAYOUT
R
Retaining wallCLf.f.
n.f.
f.f.
n.f.
"2
36'-7
EXPANSION JOINT
" Joint2
1'-0" "2
(end plugged) sleve, 1'-1" long
1" Dia. pipe minimum of thee dowels in single sheets pierced by a
" Premoulded bit. filler placed 2
24" O.C maximum spacing
2'-0" Long (Embed 12")
" Dia. plain dowels4
See "EXPANSION JOINT" and end 6" from top of wall bottom of of retaining wall water stop. Start 6" from
" Center bulb type8
9" x
Retaining wall
Wingwall B treatment
Waterproofing
R
R wall
Retaining CL
Proposed groundline
15'-0"15'-0"
M a x
T y p
(Typ.)
weephole
4" Dia.
DETAIL A
Scale: 1" = 1'-0" plastic pipe
3" Dia. Non-perforated plastic pipe @ 2% slope
4" Dia. Non-perforatedCL
(collector pipe) plastic pipe
3" Dia. Perforated
Min.
1'-0"
See "DETAIL A" sheet drain
Geocomposite sheet drain
Geocomposite sheet drain
1" Geocomposite the weepholes.
to manufacturer's recomnedation and outlet the pipe through
Connect perforated pipe to geocomposite sheet drain according 4.
incidental to the reataining wall.
3. All cost associated with the expansion joint, is considered
See "TYPICAL SECTION "sheet for additional information.2.
REINFORCEMENT" sheets for additional information.
See "WINGWALL B LAYOUT" and "WINGWALL B 1.
Sta. 100+81.84
End retaining wall
Sta. 100+40.59
Begin retaining wall ground
Match existing
" = 1'-0"8
Scale
" = 1'-0"8
Scale
" = 1'-0"2
1Scale " = 1'-0"8
Scale
1 08/06/24 LTE Revised scale.
STATE PROJECT
NUMBER
SHEET
PA/NJ NP DEWA 10(6), 218(2)
NPS PMIS No. 222479 NPS Drwg. No. 620/173739
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
CP/NR
DRAWN BY
LTE LTE Carlos Pena-Marsh of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-129932
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DELAWARE WATER GAP NATIONAL RECREATION AREA
Structure No.: 4320-019P
September 2023
(Dingmans Falls Access Road, Route 218)
R18
M
P R
O J E
C T
S \d e w a \1
(6
(2
B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \1
P
S
E \0
P R
O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
'' = 1'-0''4
FRAMING PLAN
G
G
G
G
G
B e g in b r id g e
E n d b r id g e
CL Bearing CL
FRAMING PLAN
N
/6
/2
R N
P D
E W
A
(6
(2
F
R A
M
IN
G P
L A
N .D
G N
A C
T U
A L
F
IL
E
Bearing
G
G
(Typ.)
6"
A
A S
H T
O B
I-b o x b e a m s
E q u s p a
Begin bridge
End bridge
(measured along roadway)
65'-0"
CL
(Typ.)
2'-4" information.
4. See "MISCELLANEOUS DETAILS - 2" sheet for additional information.
See "MISCELLANEOUS DETAILS - 1" sheet for additional 3.
See "GIRDER DETAILS - 2" sheet for additional information. 2.
See "GIRDER DETAILS - 1" sheet for additional information.1.
1 08/06/24 LTE Revised scale.
STATE PROJECT
NUMBER
SHEET
PA/NJ NP DEWA 10(6), 218(2)
NPS PMIS No. 222479 NPS Drwg. No. 620/173739
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
CP/NR
DRAWN BY
LTE LTE Carlos Pena-Marsh of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-129932
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DELAWARE WATER GAP NATIONAL RECREATION AREA
Structure No.: 4320-019P
September 2023
(Dingmans Falls Access Road, Route 218)
R26
M
P R
O J E
C T
S \d e w a \1
(6
(2
B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \1
P
S
E \0
P R
O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
3'-3"
1'-3"
" Jt.4 bond felt to prevent
2 layers of roofing
(See Note 1)
See Detail A
217519
(Cu. Yd.)
Concrete
ONE APPROACH SLAB
ESTIMATED QUANTITIES FOR
Width
Joint
"L"
Slab Length
"W"
Slab Width
"4
(Lbs.)
Steel
Reinf.*
* Does not include dowels, or sleeper slab.
SECTION A-A
DETAIL A
PLAN VIEW
No Scale joint material
Preformed expansion backer rod
1" Dia.
slab
Approach material
Joint sealer
M in
"4
APPROACH SLAB DETAILS
As shown
N /6
/2
Sleeper slab
10"
Polystyrene
Expanded treat both sides) " sheets,16 gasket (2 -
Compressed synthetic sheet and Expanded Polystyrene Type B between backfill Woven Geotextile class 2, REINFORCEMENT A
C lr
C lr
15'-2" "2 128'-1
AA
39°
39°
Spa. @ 12" #5 (E)
Equ. spa.
#6 (E)
R E
IN
F
A
" = 1'-0"16
Scale:
See Note 2
REINFORCEMENT B
" (Typ.)4
"L""L"
R E
IN
F
O R
C E
M E
N T
A
W
R E
IN
F
O R
C E
M E
N T
A
W
REINFORCEMENT BREINFORCEMENT B
"L"
REINFORCEMENT B
(South approach shown, North approach similar)
" = 1'-0"4
Scale:
1-inch space conforming to Subsection 712.01(b)(1).
walls (not including backwalls). Furnish preformed joint seal in
8. Provide 1-inch thick space between approach slab and adjacent
7. (E) denotes epoxy coated reinforcement.
the manufacture's recommendations.
of the EPS with the separation fabric and installed according to it may be pre-attached to the EPS. Cover all exposed surfaces
6. Install the separation fabric after the EPS has been installed or concrete before adhesive application.
compatible with the concrete. Thoroughly dry and clean
5. Attach EPS to the concrete surfaces with an adhesive backfill material along the full width of the backwalls.
geotextile separation fabric between concrete surfaces and
4. Provide a continuous expanded polystyrene (EPS) block and
3. Construct approach slab to match skew of substructure.
additional information.
2. See "APPROACH RAILING" sheet for curb reinforcment and information.
See "MISCELLANEOUS DETAIL - 2" sheet for additional 1.
(Typ.)
See Note 8 slab approach
End of
S le e p e r s la b
Sleeper slab (Typ.)
(Typ.)
base course
6" Aggregate
#7
TOP
#6 6"
TOP
#6
TOP
#6
SPACING
12"
TOP
SPACING
12" 12"
BOT. BOT. BOT. BOT.
** All reinforcement is epoxy coated rebar.
REINFORCEMENT A REINFORCEMENT B
SIZE SIZE
**APPROACH SLAB REINFORCEMENT LAYOUT
R
N P
D E
W A
(6
(2
A
P P
R O
A C
H S
L A
B D
E T
A
IL
S
D G
N A
C T
U A
L F
IL
E
" Asphalt overlay2
1 08/06/24 LTE Revised scale.
STATE PROJECT
NUMBER
SHEET
PA/NJ NP DEWA 10(6), 218(2)
NPS PMIS No. 222479 NPS Drwg. No. 620/173739
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
CP/NR
DRAWN BY
LTE LTE Carlos Pena-Marsh of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-129932
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DELAWARE WATER GAP NATIONAL RECREATION AREA
Structure No.: 4320-019P
September 2023
(Dingmans Falls Access Road, Route 218)
B - 1
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0080 15702-4000 SOIL EROSION CONTROL, FILTER BAG
ALL LPSM $___LPSM_____ $____________
A0100 15705-0100 SOIL EROSION CONTROL, SILT FENCE
360 LNFT $____________ $____________
A0120 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
360 LNFT $____________ $____________
A0140 15705-1800 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM
220 LNFT $____________ $____________
A0160 15706-0400 SOIL EROSION CONTROL, SEDIMENT TRAP
1 EACH $____________ $____________
A0180 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
2 EACH $____________ $____________
A0200 15706-2300 SOIL EROSION CONTROL, ON-SITE CONCRETE WASHOUT STRUCTURE
1 EACH $____________ $____________
A0220 20103-0000 CLEARING AND GRUBBING
555 SQYD $____________ $____________
A0240 20220-1000 REMOVAL, INDIVIDUAL TREE
9 EACH $____________ $____________
A0260 20301-2300 REMOVAL OF SIGN/MARKER
4 EACH $____________ $____________
A0280 20302-1200 REMOVAL OF GUARDRAIL
145 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:NP DEWA 10(6), 218(2)
Project Name:Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the Vancampens Glen Bridge
B - 2
A0300 20303-1600 REMOVAL OF PAVEMENT, ASPHALT
335 SQYD $____________ $____________
A0320 20304-2000 REMOVAL OF BRIDGE (EXISTING SUPERSTRUCTURE AND SUBSTRUCTURE)
ALL LPSM $___LPSM_____ $____________
A0340 20315-0000 SAWCUTTING PAVEMENT
45 LNFT $____________ $____________
A0360 20401-0000 ROADWAY EXCAVATION
245 CUYD $____________ $____________
A0380 20701-1000 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E
240 SQYD $____________ $____________
A0400 20801-0000 STRUCTURE EXCAVATION
1,450 CUYD $____________ $____________
A0420 20803-0000 STRUCTURAL BACKFILL
625 CUYD $____________ $____________
A0440 25102-0300 PLACED RIPRAP, METHOD A, CLASS 3
70 TON $____________ $____________
A0460 30101-4000 AGGREGATE BASE GRADING C OR D
110 TON $____________ $____________
A0480 31302-0400 AGGREGATE-TOPSOIL COURSE, 4-INCH DEPTH
45 SQYD $____________ $____________
A0500 40101-0100 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/8-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL (TYPE IV ROUGHNESS, PG
58-28)
80 TON $____________ $____________
A0520 40101-0900 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/4-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL (PG 58-28)
50 TON $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:NP DEWA 10(6), 218(2)
Project Name:Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the Vancampens Glen Bridge
B - 3
A0540 41202-0000 TACK COAT
70 GAL $____________ $____________
A0560 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (SUBSTRUCTURE AND RETAINING
WALL)
350 CUYD $____________ $____________
A0580 55201-0800 STRUCTURAL CONCRETE, CLASS D (AE) (BACKWALL AND END
DIAPHGRAM)
10 CUYD $____________ $____________
A0600 55202-2000 STRUCTURAL CONCRETE, CLASS D (AE), FOR APPROACH SLABS, TYPE 2
100 SQYD $____________ $____________
A0620 55235-0000 EXPANSION JOINTS (BACKER ROD AND HOT APPLIED JOINT SEALANT)
80 LNFT $____________ $____________
A0640 55302-3200 PRECAST, PRESTRESSED CONCRETE GIRDER (ADJACENT BOX BEAM
48-INCH)
455 LNFT $____________ $____________
A0660 55401-2000 REINFORCING STEEL, EPOXY COATED
61,500 LB $____________ $____________
A0680 55601-1300 BRIDGE RAILING, TIMBER (27-INCH, TUBULAR STEEL-BACKED)
200 LNFT $____________ $____________
A0700 55901-0000 MEMBRANE WATERPROOFING (SPRAY-APPLIED)
205 SQYD $____________ $____________
A0720 56401-1000 BEARING DEVICE, ELASTOMERIC (STEEL REINFORCED)
14 EACH $____________ $____________
A0740 58501-0000 ULTRA HIGH PERFORMANCE CONCRETE (GIRDER KEYWAY)
5 CUYD $____________ $____________
A0760 61701-4010 GUARDRAIL SYSTEM SBTB, MERRITT PARKWAY GUIDERAIL
130 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:NP DEWA 10(6), 218(2)
Project Name:Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the Vancampens Glen Bridge
B - 4
A0780 61702-0900 TERMINAL SECTION, TYPE BAT-MERRITT PARKWAY GUIDERAIL (TYPE II)
1 EACH $____________ $____________
A0800 61702-1000 TERMINAL SECTION, TYPE FAT-MERRITT PARKWAY GUIDERAIL (TYPE I)
2 EACH $____________ $____________
A0820 61707-2000 STRUCTURE TRANSITION RAILING, SBT SYSTEM
80 LNFT $____________ $____________
A0840 61901-0000 FENCE (TREE PROTECTION)
50 LNFT $____________ $____________
A0860 62401-0200 FURNISHING AND PLACING TOPSOIL, 3-INCH DEPTH
1,510 SQYD $____________ $____________
A0880 62501-0000 TURF ESTABLISHMENT
0.35 ACRE $____________ $____________
A0900 62901-0800 ROLLED EROSION CONTROL PRODUCT, TYPE 2.D
1,490 SQYD $____________ $____________
A0920 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID
890 LNFT $____________ $____________
A0940 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
50 LNFT $____________ $____________
A0960 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
170 SQFT $____________ $____________
A0980 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
0002 A1000 64701-3000 MITIGATION, ARCHAEOLOGICAL SITE
ALL LPSM $___LPSM_____ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:NP DEWA 10(6), 218(2)
Project Name:Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the Vancampens Glen Bridge
B - 5
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
B0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
B0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
B0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
0001 B0070 15401-0000 CONTRACTOR TESTING (BIOLOGICAL MONITOR)
ALL LPSM $___LPSM_____ $____________
B0080 15705-0100 SOIL EROSION CONTROL, SILT FENCE
130 LNFT $____________ $____________
B0100 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
130 LNFT $____________ $____________
B0120 15706-2300 SOIL EROSION CONTROL, ON-SITE CONCRETE WASHOUT STRUCTURE
1 EACH $____________ $____________
B0140 20103-0000 CLEARING AND GRUBBING
210 SQYD $____________ $____________
B0160 20220-1000 REMOVAL, INDIVIDUAL TREE
10 EACH $____________ $____________
B0180 20315-0000 SAWCUTTING PAVEMENT
45 LNFT $____________ $____________
B0200 20410-0000 SELECT BORROW (#57 STONE)
60 CUYD $____________ $____________
B0220 25102-0400 PLACED RIPRAP, METHOD A, CLASS 4
55 TON $____________ $____________
B0240 25102-0700 PLACED RIPRAP, METHOD A, CLASS 7
50 TON $____________ $____________
B0260 40101-0100 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/8-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL (TYPE IV ROUGHNESS, PG
58-28)
Bid Schedule Schedule:B Schedule Type:Options
Project No:NP DEWA 10(6), 218(2)
Project Name:Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the Vancampens Glen Bridge
B - 6
22 TON $____________ $____________
B0280 40102-0100 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/8-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, WEDGE AND LEVELING COURSE (PG 58-28)
15 TON $____________ $____________
B0300 41202-0000 TACK COAT
65 GAL $____________ $____________
B0320 41301-0400 ASPHALT PAVEMENT MILLING, 1 1/2-INCH DEPTH
270 SQYD $____________ $____________
B0340 55220-0000 REPAIR CONCRETE (CURB AND RAILING)
10 SQYD $____________ $____________
B0360 55220-0000 REPAIR CONCRETE (TOP OF DECK)
10 SQYD $____________ $____________
B0380 55220-0000 REPAIR CONCRETE (BOTTOM OF DECK)
30 SQYD $____________ $____________
B0400 55224-0000 SEAL CONCRETE SURFACE
80 SQYD $____________ $____________
B0420 56302-2000 PAINTING, STEEL STRUCTURE
240 SQFT $____________ $____________
B0440 56320-0000 CONTAINMENT SYSTEM AND WORKER PROTECTION PLAN
ALL LPSM $___LPSM_____ $____________
B0460 57501-0000 MINOR BRIDGE WORK (REMOVE ASPHALT)
ALL LPSM $___LPSM_____ $____________
B0480 61708-1000 REMOVE AND RESET, GUARDRAIL
220 LNFT $____________ $____________
B0500 61901-0000 FENCE (TREE PROTECTION)
50 LNFT $____________ $____________
B0520 62632-0000 PLANTINGS
ALL LPSM $___LPSM_____ $____________
B0540 63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING (WOOD POSTS)
12 SQFT $____________ $____________
Bid Schedule Schedule:B Schedule Type:Options
Project No:NP DEWA 10(6), 218(2)
Project Name:Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the Vancampens Glen Bridge
B - 7
B0560 63316-1000 REMOVE AND RESET SIGN
1 EACH $____________ $____________
B0580 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID
660 LNFT $____________ $____________
B0600 63502-2100 TEMPORARY TRAFFIC CONTROL, CRASH CUSHION
2 EACH $____________ $____________
B0620 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
1 EACH $____________ $____________
B0640 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
275 LNFT $____________ $____________
B0660 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
65 LNFT $____________ $____________
B0680 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
160 SQFT $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:B Schedule Type:Options
Project No:NP DEWA 10(6), 218(2)
Project Name:Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the Vancampens Glen Bridge
B - 8
BID SUMMARY
Project NP DEWA 10(6), 218(2)
(1) Schedule A (Base Contract) Bid Total (from Page B-4) = (1) $____________________
(2) Schedule B (Government Option 1) Bid Total (from Page B-7) = (1) $____________________
Total Price of Project (for evaluation purposes only)
EVALUATION TOTAL PRICE OF PROJECT = (1) + (2) $____________________
Maximum Time Allowed for the Contract if Schedules A and B are Awarded at the Same Time:
If the Government awards the contract as Schedules A + B, the performance period to complete all contract work will be 328 calendar days.
Maximum Time Allowed for Each Schedule of Work if Awarded Separately:
If the Government awards the contract as Schedule A only, the performance period to complete all
Schedule A work will be 323 calendar days and will start on the effective date of Schedule A’s Notice to
Proceed.
If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 128 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.
Does the Bidder claim the Price Evaluation Preference for HUBZone Yes No
Small Business Concerns as defined in FAR Clause 52.219-4? ☐ ☐
Section 156. — PUBLIC TRAFFIC
156.04. Delete the first paragraph and substitute the following:
Accommodate traffic according to the MUTCD, contract traffic control plan, Section 635, and this Section. An alternate traffic control plan may be submitted for approval in accordance with Subsection 104.03 and the following:
(a) Ensure safe and efficient pedestrian, bicycle, and vehicular traffic (including emergency vehicles) at all times during construction except during the full closure of the Dingmans Falls Access Bridge;
(b) Schedule and perform work to minimize disruption to public traffic; and
(c) Accommodate the construction operations as approved under Section 155.
Submit traffic control plans at least 30 days before its intended use. After the initial traffic control plan is approved, revise it as necessary to accommodate approved changes in the construction schedule. Submit the revised traffic control plan at least 14 days before implementation, unless otherwise approved by the CO.
| NP DEWA 10(6) 218(2)_sheet C02.pdf |
| Amendments |
| C01-C02_NP_DEWA_10(6)_218(2)_Quantity Amendment 0002 |
| C01-C02_NP_DEWA_10(6)_218(2)_Quantity Amendment 0002 |
| NP DEWA 10(6) 218(2)_sheets R12, R15, R18, R26.pdf |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
| 0_0PROJECTS |
File details come from the government source that posted it. Updated .