Pitt Chiller Plant - Drawings - Part VI Electrical.pdf

PDF 28 MB Posted

Attached to
Z2DA--NRM| 646-20-109 UD Chiller Capacity and Controls Upgrade (VA-26-00044970) (VA-26-00044970)
Solicitation number
36C24426R0062
Issued by

About this file

This file is a set of electrical construction drawings for the UD Chiller Capacity Upgrade project located at the University Drive Campus in Pittsburgh, Pennsylvania. The drawings are part of Project Number 646-20-109 and were issued on May 11, 2022, under the direction of the University of Pittsburgh's Office of Construction and Facilities Management with engineer of record and consultant involvement. The electrical drawings package includes multiple plan sheets covering first level, second level, and roof areas, specifically addressing electrical demolition plans, lighting plans, power plans, conduit plans, and electrical systems plans. The drawings utilize standard architectural scales including one-eighth inch to one foot, one-quarter inch to one foot, three-eighths inch to one foot, one-half inch to one foot, and other incremental scales for detailed representation of electrical work throughout the facility.

The comprehensive drawing set is designed to guide the electrical installation and demolition work required for the chiller capacity upgrade project. Each drawing sheet is marked with grid references (labeled A through F horizontally and 1 through 10 vertically) and includes plan north indicators and actual north orientations for proper spatial orientation. The document serves as technical construction documentation that would inform contractors and tradespeople regarding electrical system modifications, routing, demolition requirements, and new installations necessary to support the upgraded chiller plant capacity at the University of Pittsburgh facility.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Projo ect Number

Building Number

Drawing Number

Projo ect Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Offff ice of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVAV NIA

646-20-109

Projo ect Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

Drawing Number

Projo ect Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Offff ice of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVAV NIA

646-20-109

Projo ect Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

Drawing Number

Projo ect Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Offff ice of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVAV NIA

646-20-109

Projo ect Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

Drawing Number

Projo ect Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Offff ice of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVAV NIA

646-20-109

Projo ect Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

PLAN

NORTH

ACTUAL

NORTH

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

ELECTRICAL

DEMOLITION PLAN - FIRST LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

ELECTRICAL

DEMOLITION PLAN - SECOND LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

ELECTRICAL

DEMOLITION PLAN - ROOF

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

ELECTRICAL

LIGHTING PLAN - FIRST LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

ELECTRICAL

LIGHTING PLAN - SECOND LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

ELECTRICAL

POWER PLAN - FIRST LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

ELECTRICAL

POWER PLAN - SECOND LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

ELECTRICAL

CONDUIT PLAN - SECOND LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

ELECTRICAL

PLAN - ROOF

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

ELECTRICAL

SYSTEMS PLAN - FIRST LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANTS

321 4 5 6 7 8 9 10

6" 6"

6" 6" on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

PLAN

NORTH

ACTUAL

NORTH

ELECTRICAL

SYSTEMS PLAN - SECOND LEVEL

UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Drawing Number

Projo ect Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Offff ice of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVAVV NIA

646-20-109

Projo ect Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

Drawing Number

Projo ect Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Offff ice of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVAV NIA

646-20-109

Projo ect Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

Drawing Number

Projo ect Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Offff ice of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVAV NIA

646-20-109

Projo ect Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

Drawing Number

Projo ect Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Offff ice of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVAVV NIA

646-20-109

Projo ect Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

Drawing Number

Projo ect Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Offff ice of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVAV NIA

646-20-109

Projo ect Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

Drawing Number

Projo ect Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Offff ice of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVAV NIA

646-20-109

Projo ect Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

File details come from the government source that posted it. Updated .