Pitt Chiller Plant - Drawings - Part III AE.pdf

PDF 2 MB Posted

Attached to
Z2DA--NRM| 646-20-109 UD Chiller Capacity and Controls Upgrade (VA-26-00044970) (VA-26-00044970)
Solicitation number
36C24426R0062
Issued by

About this file

This document is a set of architectural construction drawings for a chiller replacement project at a U.S. Department of Veterans Affairs facility in Pittsburgh, VA. The drawings represent Phase design documents prepared by LaBella Associates, a Service-Disabled Veteran-Owned Small Business (SDVOSB).

The project encompasses demolition and new construction work across multiple building levels. Key demolition activities include removal of existing flooring, masonry and concrete walls, structural steel, mechanical equipment, ductwork, piping, roofing systems, door hardware, and miscellaneous building components. Construction work involves installation of new concrete slabs on metal decks, structural steel framing, a new roofing and waterproofing system, new coil door assemblies with water-tight thresholds, louver openings, wall openings with detailed flashing, mechanical equipment pads, and building envelope restoration including caulking, sealants, and masonry patching. The drawings specify dimensional requirements, material specifications, finish standards per ASTM classifications, and detailed construction sequencing notes. Coordination with mechanical, plumbing, electrical, and structural trades is required throughout the project. The drawings indicate nominal masonry dimensioning to face, finished concrete dimensioning face-to-face, and reference to separate structural, mechanical, plumbing, and electrical drawing packages for complete implementation requirements.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

2022-05-11 TM STAFF0507

CONSTRUCTION BID

DOCUMENTS

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

PLAN

NORTH

ACTUAL

NORTH

2022-05-11 TM JD, WM0507

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

PLAN

NORTH

ACTUAL

NORTH

2022-05-11 TM JH, WM0507

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

PLAN

NORTH

ACTUAL

NORTH

2022-05-11 TM JH, WM

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

PLAN

NORTH

ACTUAL

NORTH

2022-05-11 TM JH, WM0507

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

PLAN

NORTH

ACTUAL

NORTH

2022-05-11 TM JH, WM0507

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

PLAN

NORTH

ACTUAL

NORTH

2022-05-11 TM WM

2 1 /4"

3'

- 7

1/ 2"

Location

Issue Date

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

2022-05-11 TM JH, WM0507

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

2022-05-11 TM JH, WM

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

2022-05-11 TM JH, WM0507

Project Number

Building Number

Drawing Number

Project Title

Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY

UPGRADE

Project Director

2022-05-11 TM WM

File details come from the government source that posted it. Updated .