Pitt Chiller Plant - Drawings - Part III AE.pdf
PDF 2 MB Posted
- Attached to
- Z2DA--NRM| 646-20-109 UD Chiller Capacity and Controls Upgrade (VA-26-00044970) (VA-26-00044970)
- Solicitation number
- 36C24426R0062
About this file
This document is a set of architectural construction drawings for a chiller replacement project at a U.S. Department of Veterans Affairs facility in Pittsburgh, VA. The drawings represent Phase design documents prepared by LaBella Associates, a Service-Disabled Veteran-Owned Small Business (SDVOSB).
The project encompasses demolition and new construction work across multiple building levels. Key demolition activities include removal of existing flooring, masonry and concrete walls, structural steel, mechanical equipment, ductwork, piping, roofing systems, door hardware, and miscellaneous building components. Construction work involves installation of new concrete slabs on metal decks, structural steel framing, a new roofing and waterproofing system, new coil door assemblies with water-tight thresholds, louver openings, wall openings with detailed flashing, mechanical equipment pads, and building envelope restoration including caulking, sealants, and masonry patching. The drawings specify dimensional requirements, material specifications, finish standards per ASTM classifications, and detailed construction sequencing notes. Coordination with mechanical, plumbing, electrical, and structural trades is required throughout the project. The drawings indicate nominal masonry dimensioning to face, finished concrete dimensioning face-to-face, and reference to separate structural, mechanical, plumbing, and electrical drawing packages for complete implementation requirements.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Location
Issue Date
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY
UPGRADE
Project Director
2022-05-11 TM STAFF0507
CONSTRUCTION BID
DOCUMENTS
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY
UPGRADE
Project Director
PLAN
NORTH
ACTUAL
NORTH
2022-05-11 TM JD, WM0507
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY
UPGRADE
Project Director
PLAN
NORTH
ACTUAL
NORTH
2022-05-11 TM JH, WM0507
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY
UPGRADE
Project Director
PLAN
NORTH
ACTUAL
NORTH
2022-05-11 TM JH, WM
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY
UPGRADE
Project Director
PLAN
NORTH
ACTUAL
NORTH
2022-05-11 TM JH, WM0507
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY
UPGRADE
Project Director
PLAN
NORTH
ACTUAL
NORTH
2022-05-11 TM JH, WM0507
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY
UPGRADE
Project Director
PLAN
NORTH
ACTUAL
NORTH
2022-05-11 TM WM
2 1 /4"
3'
- 7
1/ 2"
Location
Issue Date
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY
UPGRADE
Project Director
2022-05-11 TM JH, WM0507
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY
UPGRADE
Project Director
2022-05-11 TM JH, WM
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY
UPGRADE
Project Director
2022-05-11 TM JH, WM0507
Project Number
Building Number
Drawing Number
Project Title
Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY
UPGRADE
Project Director
2022-05-11 TM WM
File details come from the government source that posted it. Updated .