About this file

This file is a set of technical drawings for the Pitt Chiller Plant facility. The drawings provide detailed architectural and engineering specifications for the chiller plant infrastructure, including equipment layouts, piping configurations, control systems, and mechanical installations. The drawings serve as reference documentation for the Z2DA--NRM 646-20-109 UD Chiller Capacity and Controls Upgrade project being solicited by the Department of Veterans Affairs Veterans Health Administration under Solicitation Number 36C24426R0062.

The drawings are essential technical documents that establish the baseline conditions and design parameters for the chiller plant upgrade work. They depict the existing facility configuration and will inform contractor proposals for the capacity expansion and controls modernization efforts. These drawings should be reviewed in conjunction with the corresponding Statement of Work, Performance Work Statement, or Technical Specifications to understand the full scope of the upgrade requirements and any modifications contractors must implement to the existing chiller plant infrastructure.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .