Pitt Chiller Plant - Drawings - Part IV Plumbing.pdf
PDF 1 MB Posted
- Attached to
- Z2DA--NRM| 646-20-109 UD Chiller Capacity and Controls Upgrade (VA-26-00044970) (VA-26-00044970)
- Solicitation number
- 36C24426R0062
About this file
This document is a set of architectural and engineering drawings for a plumbing system at a U.S. Department of Veterans Affairs facility. The drawings were prepared by Miller Remick LLC, a professional engineering firm located in Cherry Hill, New Jersey, serving as the Consultant Engineer of Record, with LaBella Associates providing engineering, architecture, and environmental planning services from their Rochester, New York office.
The plumbing design documents include detailed plans and specifications for mechanical, electrical, plumbing, and structural engineering systems. The drawings encompass plumbing layouts for the first and second levels, with comprehensive abbreviations, notes, and symbols defining all plumbing components, piping systems, valve types, and general requirements. Key details shown include plumbing abbreviations, piping symbols, valve symbols, and general plumbing notes addressing installation, testing, and compliance standards. The drawings also contain specialized details for trapeze pipe supports, hub drain installations, floor drain configurations, emergency shower systems, and sub-water distribution systems. These technical specifications and schematic representations establish the construction requirements and standards for the project's plumbing infrastructure, with all prints bearing the professional seal and signature requirement of the licensed professional engineer as mandated by professional engineering practice standards.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Project Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Project Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
PLAN
NORTH
ACTUAL
NORTH
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Project Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
PLAN
NORTH
ACTUAL
NORTH
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE
UNIVERSITY DRIVE CAMPUS
PITTSBURGH, PENNSYLVANIA
646-20-109
Project Director
2022-05-11
321 4 5 6 7 8 9 10
A
B
C
D
E
F
21 4 5 6 7 8 9 10
A
C
D
E
F
File details come from the government source that posted it. Updated .