Pitt Chiller Plant - Drawings - Part IV Plumbing.pdf

PDF 1 MB Posted

Attached to
Z2DA--NRM| 646-20-109 UD Chiller Capacity and Controls Upgrade (VA-26-00044970) (VA-26-00044970)
Solicitation number
36C24426R0062
Issued by

About this file

This document is a set of architectural and engineering drawings for a plumbing system at a U.S. Department of Veterans Affairs facility. The drawings were prepared by Miller Remick LLC, a professional engineering firm located in Cherry Hill, New Jersey, serving as the Consultant Engineer of Record, with LaBella Associates providing engineering, architecture, and environmental planning services from their Rochester, New York office.

The plumbing design documents include detailed plans and specifications for mechanical, electrical, plumbing, and structural engineering systems. The drawings encompass plumbing layouts for the first and second levels, with comprehensive abbreviations, notes, and symbols defining all plumbing components, piping systems, valve types, and general requirements. Key details shown include plumbing abbreviations, piping symbols, valve symbols, and general plumbing notes addressing installation, testing, and compliance standards. The drawings also contain specialized details for trapeze pipe supports, hub drain installations, floor drain configurations, emergency shower systems, and sub-water distribution systems. These technical specifications and schematic representations establish the construction requirements and standards for the project's plumbing infrastructure, with all prints bearing the professional seal and signature requirement of the licensed professional engineer as mandated by professional engineering practice standards.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

PLAN

NORTH

ACTUAL

NORTH

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

PLAN

NORTH

ACTUAL

NORTH

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

PhaseENGINEER OF RECORDCONSULTANT UD CHILLER CAPACITY UPGRADE

UNIVERSITY DRIVE CAMPUS

PITTSBURGH, PENNSYLVANIA

646-20-109

Project Director

2022-05-11

321 4 5 6 7 8 9 10

A

B

C

D

E

F

21 4 5 6 7 8 9 10

A

C

D

E

F

File details come from the government source that posted it. Updated .